Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Nov 30, 2025
✓ SLA Met (9 biz days early)
🕐 Clock stopped: Completed (Nov 13, 2025)
▶ Clock Running
Status: Created
Aug 18 → Aug 18, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Aug 18 → Aug 18, 2025
0 business days (counted)
Running total: 0 of ? biz days used
6d
▶ Clock Running
Status: Assigned
Aug 18 → Aug 26, 2025
6 business days (counted)
Running total: 6 of ? biz days used
53d
▶ Clock Running
Status: Scheduled
Aug 26 → Nov 12, 2025
53 business days (counted)
Running total: 59 of ? biz days used
▶ Clock Running
Status: Tech On Site
Nov 12 → Nov 13, 2025
1 business day (counted)
Running total: 60 of ? biz days used
Created: Aug 18, 2025
Completed: Nov 13, 2025
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Aug 18 → Aug 18
Created
▶ Running
0
0
Aug 18 → Aug 18
Ready for Scheduling
▶ Running
0
0
Aug 18 → Aug 26
Assigned
▶ Running
6
6
Aug 26 → Nov 12
Scheduled
▶ Running
53
59
Nov 12 → Nov 13
Tech On Site
▶ Running
1
60
Coordinators
60.6 days
Over SLA
Field Work
1.3 days
Over SLA
Billing
7.5 days
Over SLA
Created: Aug 18, 2025
Due: Nov 30, 2025
Completed: Nov 13, 2025 (17 days early)
⏱️
54.0d in Scheduled
Longest Stage
🔄
8 transitions
Status Changes
⚠️
64.9d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00519919
6007945988
Closed
28U
SYS-LC-1260
Contract ends 02/14/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1329B
DEAAC35178 1260 Standard Autosampler
G1314C
DEAAV01275 1260 Variable Wavelength Detector VL+
G1312B
DEACB10129 1260 Binary Pump
G3592A
FC1000-01076 Dual-channel A/D interface box
🚨
Primary Delay
54.0 days stuck in "Scheduled"
⏱️
Total Delay
64.9 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
54.0d
/ 2.0d SLA
Tech On Site
1.3d
/ 1.0d SLA
Completed
0.0d
/ 1.0d SLA
Ready to Bill
7.4d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📋 Tasks (1)
📅 Events (1)
🔒
Internal CSA Notes
22 Aug 2025 Larry Alberty
Reached out for scheduling the onsite visit.
Please assign to Larry Alberty ARP to site is 107 miles. Zone 3
🔧
Work Performed
Completed LC PM.
⚠️
Problem Description
28U
SYS-LC-1260
Contract ends 02/14/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1329B
DEAAC35178 1260 Standard Autosampler
G1314C
DEAAV01275 1260 Variable Wavelength Detector VL+
G1312B
DEACB10129 1260 Binary Pump
G3592A
FC1000-01076 Dual-channel A/D interface box
📄
Description
1260 Binary Pump
📞
Call Description
NOV 2025 LC PM
📞
Call
Completed
Aug 22, 2025
22 Aug 2025 Larry Alberty
Reached out for scheduling the onsite visit.
📅
WO-01298234 - Preventive Maintenance - G1312B - Sacramento - Telix Optimal Tracers LLC
Nov 12, 2025 8:00am – 5:00pm
Work Order: WO-01298234
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6007945988
Location: Telix Optimal Tracers LLC
Address: 2921 Stockton Blvd 1710, Sacramento, CA 95817
Manufacturer: Agilent Technologies
Model #: G1312B
Serial #: DEACB10129
Contact Name: Tom Catris
Contact Phone: 916-
Timeline
📞
📋
Work Order:
WO-01298234
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
Larry Alberty
🗓️
📅
Scheduled For:
2025-11-12T13:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
78d 2h
🚗
⏱️
Type:
Labor
Status:
Open
Qty:
1.5, 3
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
11h 4m
🏁
From:
Completed
To:
Closed
Duration in Previous:
9m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
17h 59m
📨
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
2m
Bottlenecks
Assigned
Duration: 6.6 business days (threshold: 4.0 business hours)
Exceeded by 6.1 business days
Scheduled
Duration: 54.0 business days (threshold: 2.0 business days)
Exceeded by 52.0 business days
Tech On Site
Duration: 1.3 business days (threshold: 1.0 business days)
Exceeded by 2.3 business hours
Ready to Bill
Duration: 7.4 business days (threshold: 1.0 business days)
Exceeded by 6.4 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Nov 12, 8:00 AM
Work Details (8)
Name
Type
Status
Qty
Amount
Date
WL-03005563
Travel
Open
80
$359.00
Nov 12, 9:13 PM
WL-03005564
Travel
Open
80
$0.00
Nov 12, 9:13 PM
WL-03005565
Parts
Open
1
$0.00
Nov 12, 9:13 PM
WL-03005566
Parts
Open
1
$0.00
Nov 12, 9:13 PM
WL-03005567
Parts
Open
1
$0.00
Nov 12, 9:13 PM
WL-03005568
Labor
Open
1.5
$0.00
Nov 12, 9:17 PM
WL-03005569
Labor
Open
3
$456.00
Nov 12, 9:17 PM
WL-03005570
Labor
Open
1.5
$0.00
Nov 12, 9:17 PM