Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Sep 2, 2025
✗ SLA Missed (17 biz days late)
🕐 Clock stopped: Completed (Sep 25, 2025)
▶ Clock Running
Status: Created
Aug 19 → Aug 20, 2025
1 business day (counted)
Running total: 1 of ? biz days used
18d
▶ Clock Running
Status: Assigned
Aug 20 → Sep 16, 2025
18 business days (counted)
Running total: 19 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Sep 16 → Sep 17, 2025
1 business day (counted)
Running total: 20 of ? biz days used
5d
▶ Clock Running
Status: Scheduled
Sep 17 → Sep 24, 2025
5 business days (counted)
Running total: 25 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 24 → Sep 25, 2025
1 business day (counted)
Running total: 26 of ? biz days used
Created: Aug 19, 2025
Completed: Sep 25, 2025
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Aug 19 → Aug 20
Created
▶ Running
1
1
Aug 20 → Sep 16
Assigned
▶ Running
18
19
Sep 16 → Sep 17
Ready for Scheduling
▶ Running
1
20
Sep 17 → Sep 24
Scheduled
▶ Running
5
25
Sep 24 → Sep 25
Tech On Site
▶ Running
1
26
Dispatch
1.3 days
Over SLA
Coordinators
27.0 days
Over SLA
Field Work
2.0 days
Over SLA
Billing
1.5 days
Over SLA
Created: Aug 19, 2025
Due: Sep 2, 2025
Completed: Sep 26, 2025 (23 days late)
⏱️
19.0d in Assigned
Longest Stage
🔄
11 transitions
Status Changes
⚠️
26.7d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00520407
URGENT Philips WO Request
Closed
DUT continues to fail FiO2 test.
🚨
Primary Delay
19.0 days stuck in "Assigned"
⏱️
Total Delay
26.7 business days over SLA thresholds
SLA vs Actual Time by Status
Assigned
19.0d
/ 0.5d SLA
Ready for Scheduling
2.0d
/ 1.0d SLA
Scheduled
6.0d
/ 2.0d SLA
Tech On Site
2.0d
/ 1.0d SLA
WO Correction Needed
0.1d
Completed
0.0d
/ 1.0d SLA
Ready to Bill
1.4d
/ 1.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (6)
📅 Events (1)
📎 Files (1)
🔒
Internal CSA Notes
09/22/2025 EMartin 09222025_BOUPDATE_
09/17/2025 EMartin dispatching to FSE per call with Fady to complete 09/24 - 09/26
09/08/2025 MNewman - Quote has been accepted. Work can be scheduled
08/28/2025 Emartin Fady working with Brett Martz and Kent at Baptist to send FSE back onsite to complete devices
08/25/2025 Emartin per Fady working with Brett Martz and Kent at Baptist to get quotes amended and WOs released to send FSE back onsite to complete devices
08/20/2025 Emartin PWO pending entitlement
🔧
Work Performed
Replaced FiO2 housing, OBM subassembly, tubing blower chassis, tubing-FiO2, Tubing-low flow O2, and tubing system PCA. Performed a complete performance verification procedure. All tests passed. Device returned to use.
🔍
Technician Findings
Repairs completed.
⚠️
Problem Description
DUT continues to fail FiO2 test.
📄
Description
Philips Trilogy EV300 Hospital Ventilator (DS2200X11B / 989805661881)
📞
Call Description
Repair - Trade
📅
WO-01298561 - Repair - Trilogy EV300 Vent - Pensacola - Baptist Hospital
Sep 24, 2025 8:00am – 5:00pm
Work Order: WO-01298561
Account: PHILIPS HEALTHCARE
Customer Case Number: WO-13406230
Location: Baptist Hospital
Address: 123 Baptist Way, Pensacola, FL 32503
Manufacturer: Philips Healthcare
Model #: Trilogy EV300 Vent
Serial #: H29311759C2BF
Contact Name: Kent Roberts
Contact Phone: (448) 227-3270
PDF
WO-13406230_Trilogy EV300 Ventilator-H29311759C2BF_SignedCSR_24-Sep-2025
Sep 25, 2025
Timeline
📞
Case Number:
00520407
Subject:
URGENT Philips WO Request
Status:
Closed
📋
Work Order:
WO-01298561
Type:
Repair
Priority:
PC
👷
👷
From:
Entered
To:
Assigned
Duration in Previous:
14h 43m
📅
From:
Assigned
To:
Ready for Scheduling
Duration in Previous:
27d 0h
🗓️
📅
Scheduled For:
2025-09-24T16:00:00.000+0000, 2025-09-24T12:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
7d 0h
⏱️
Type:
Labor
Status:
Open
Qty:
1, 0.25, 0.75
✔️
From:
Tech On Site, Completed
To:
Completed, Closed
Duration in Previous:
1d 0h, 0m
✏️
From:
Closed
To:
WO Correction Needed
Duration in Previous:
1d 0h
✔️
From:
WO Correction Needed
To:
Completed
Duration in Previous:
31m
🏁
From:
Completed
To:
Closed
Duration in Previous:
6m
⏱️
📋
From:
Closed
To:
07e-Partial Project
Duration in Previous:
42m
📄
From:
07e-Partial Project
To:
Ready to Bill
Duration in Previous:
6d 2h
💰
From:
Ready to Bill
To:
Invoiced
Duration in Previous:
11h 35m
🧾
Invoice Number:
SM-242768
Bottlenecks
Entered
Duration: 1.3 business days (threshold: 4.0 business hours)
Exceeded by 6.5 business hours
Assigned
Duration: 19.0 business days (threshold: 4.0 business hours)
Exceeded by 18.5 business days
Ready for Scheduling
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Scheduled
Duration: 6.0 business days (threshold: 2.0 business days)
Exceeded by 4.0 business days
Tech On Site
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Closed
Duration: 1.9 business days (threshold: 1.0 business days)
Exceeded by 7.4 business hours
Ready to Bill
Duration: 1.4 business days (threshold: 1.0 business days)
Exceeded by 3.6 business hours
ℹ️ Work Order Details
Scheduled
Sep 24, 8:00 AM
Work Details (4)
Name
Type
Status
Qty
Amount
Date
WL-02949086
Labor
Open
1
$155.00
Sep 25, 12:24 PM
WL-02949087
Labor
Open
0.25
$23.75
Sep 25, 12:24 PM
WL-02949088
Labor
Open
0.75
$71.25
Sep 25, 12:24 PM
WL-02950928
Labor
Open
0.016666666666667
$38.00
Sep 26, 2:20 PM