Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Sep 30, 2025
✓ SLA Met (13 biz days early)
🕐 Clock stopped: Completed (Sep 11, 2025)
▶ Clock Running
Status: Created
Aug 22 → Aug 22, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Aug 22 → Aug 22, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Aug 22 → Aug 22, 2025
0 business days (counted)
Running total: 0 of ? biz days used
13d
▶ Clock Running
Status: Scheduled
Aug 22 → Sep 11, 2025
13 business days (counted)
Running total: 13 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 11 → Sep 11, 2025
0 business days (counted)
Running total: 13 of ? biz days used
Created: Aug 22, 2025
Completed: Sep 11, 2025
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Aug 22 → Aug 22
Created
▶ Running
0
0
Aug 22 → Aug 22
Ready for Scheduling
▶ Running
0
0
Aug 22 → Aug 22
Assigned
▶ Running
0
0
Aug 22 → Sep 11
Scheduled
▶ Running
13
13
Sep 11 → Sep 11
Tech On Site
▶ Running
0
13
Coordinators
14.1 days
Over SLA
Billing
7.8 days
Over SLA
Created: Aug 22, 2025
Due: Sep 30, 2025
Completed: Sep 11, 2025 (19 days early)
⏱️
14.0d in Scheduled
Longest Stage
🔄
8 transitions
Status Changes
⚠️
18.9d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00521218
6007983922
Closed
20L
SYS-LC-1200
Contract ends 07/31/2026 repair included
PM
G1379B
JP60801726 1260 Infinity Micro Degasser.
G1315B
DE63057024 1200 Diode-array Detector
G1330B-B
DE60557516 1200 Cooled Thermostatted ALS
G1312A
DE63056493 1200 Series Binary Pump
G1367B
DE63055714 1200 Series High Performance Autosampler
G1316A-B
DE63059161 1200 Thermostatted Column Compartment
G1160A
DE605555418 1200 Series 12-position/13-port valve
Contact
Diana Hernandez Guerrero
🚨
Primary Delay
14.0 days stuck in "Scheduled"
⏱️
Total Delay
18.9 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
14.0d
/ 2.0d SLA
Tech On Site
0.6d
/ 1.0d SLA
Completed
0.3d
/ 1.0d SLA
Ready to Bill
7.8d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (6)
📅 Events (1)
🔒
Internal CSA Notes
Please assign to Jared Rappaport
ARP to site is 17 miles. Zone 1
🔧
Work Performed
Agilent HPLC PM completed as per Agilent protocol: HPLC Products - Standard Preventative Maintenance Service Checklist.
🔍
Technician Findings
As found, DAD intensity test failed. Per site agreement, lamp was replaced. Lamp was calibrated and intensity test passed. All parts replaced with like for like parts. As left, all required tests passed Agilent specifications.
⚠️
Problem Description
20L
SYS-LC-1200
Contract ends 07/31/2026 repair included
PM
G1379B
JP60801726 1260 Infinity Micro Degasser.
G1315B
DE63057024 1200 Diode-array Detector
G1330B-B
DE60557516 1200 Cooled Thermostatted ALS
G1312A
DE63056493 1200 Series Binary Pump
G1367B
DE63055714 1200 Series High Performance Autosampler
G1316A-B
DE63059161 1200 Thermostatted Column Compartment
G1160A
DE605555418 1200 Series 12-position/13-port valve
📄
Description
1200 Series Binary Pump
📞
Call Description
SEP 2025 LC PM
📅
WO-01299107 - Preventive Maintenance - G1312A - Thousand Oaks - Amgen Inc
Sep 11, 2025 11:00am – 4:30pm
Work Order: WO-01299107
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6007983922
Location: Amgen Inc
Address: 1 Amgen Center Dr, Thousand Oaks, CA 91320
Manufacturer: Agilent Technologies
Model #: G1312A
Serial #: DE63056493
Contact Name: Diana Hernandez Guerrero
Contact Phone: 805514961
Timeline
📞
📋
Work Order:
WO-01299107
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
Jared Rappaport
🗓️
📅
Scheduled For:
2025-09-11T15:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
19d 23h
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
0.66666666666667, 17
⏱️
Type:
Labor, Parts
Status:
Open
Qty:
3, 1, 4
⏱️
Type:
Labor
Status:
Open
Qty:
1.5
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
4h 59m
🚗
⏱️
Type:
Labor
Status:
Open
Qty:
0.8
🏁
From:
Completed
To:
Closed
Duration in Previous:
2h 44m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
18h 42m
📨
From:
Ready to Bill
To:
Invoice Pending
Duration in Previous:
10d 19h
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
5m
🧾
Invoice Number:
SM-241753
Bottlenecks
Scheduled
Duration: 14.0 business days (threshold: 2.0 business days)
Exceeded by 12.0 business days
Closed
Duration: 1.1 business days (threshold: 1.0 business days)
Exceeded by 0.8 business hours
Ready to Bill
Duration: 7.8 business days (threshold: 1.0 business days)
Exceeded by 6.8 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Technician
Jared Rappaport
Scheduled
Sep 11, 11:00 AM
Work Details (12)
Name
Type
Status
Qty
Amount
Date
WL-02932345
Labor
Open
0.66666666666667
$0.00
Sep 11, 11:35 AM
WL-02932346
Travel
Open
17
$0.00
Sep 11, 11:35 AM
WL-02932691
Labor
Open
3
$520.00
Sep 11, 3:58 PM
WL-02932692
Parts
Open
1
$0.00
Sep 11, 3:58 PM
WL-02932693
Parts
Open
1
$0.00
Sep 11, 3:58 PM
WL-02932694
Parts
Open
4
$0.00
Sep 11, 3:58 PM
WL-02932695
Parts
Open
1
$0.00
Sep 11, 3:58 PM
WL-02932696
Parts
Open
1
$0.00
Sep 11, 3:58 PM
WL-02932697
Parts
Open
1
$0.00
Sep 11, 3:58 PM
WL-02932733
Labor
Open
1.5
$0.00
Sep 11, 4:17 PM
WL-02933037
Travel
Open
17
$0.00
Sep 11, 7:07 PM
WL-02933038
Labor
Open
0.8
$0.00
Sep 11, 7:09 PM