Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01299793 ↗ ServiceMax

AGILENT TECHNOLOGIES (VPD-FIELD) • Repair/PM • PSM

📍 NucFil LLC — 400 Corporate Cir Ste M, Golden CO, 80401

Aug 26, 2025 → Sep 11, 2025

✅ Completed
PSM
SLA Clock
Last business day of August 2025 · Target: Aug 29, 2025
✗ SLA Missed (8 biz days late)
Active: 12 biz days
🕐 Clock stopped: Completed (Sep 12, 2025)
▶ Clock Running
Status: Created
Aug 26 → Aug 26, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: L2 Screening
Aug 26 → Aug 27, 2025
1 business day (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Aug 27 → Aug 27, 2025
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Assigned
Aug 27 → Aug 28, 2025
1 business day (counted)
Running total: 2 of ? biz days used
7d
▶ Clock Running
Status: Scheduled
Aug 28 → Sep 9, 2025
7 business days (counted)
Running total: 9 of ? biz days used
3d
▶ Clock Running
Status: Tech On Site
Sep 9 → Sep 12, 2025
3 business days (counted)
Running total: 12 of ? biz days used
Created: Aug 26, 2025 Completed: Sep 12, 2025
Show SLA Clock Detail (6 periods)
Period Status Clock Biz Days Running Total
Aug 26 → Aug 26 Created ▶ Running 0 0
Aug 26 → Aug 27 L2 Screening ▶ Running 1 1
Aug 27 → Aug 27 Ready for Scheduling ▶ Running 0 1
Aug 27 → Aug 28 Assigned ▶ Running 1 2
Aug 28 → Sep 9 Scheduled ▶ Running 7 9
Sep 9 → Sep 12 Tech On Site ▶ Running 3 12
Dispatch 1.3d
Coordinators 10.1d
Field Work 3.3d
Billing 0.5d
✗ SLA Missed
Dispatch
1.3 days
Over SLA
Coordinators
10.1 days
Over SLA
Field Work
3.3 days
Over SLA
Billing
0.5 days
Created: Aug 26, 2025 Due: Aug 29, 2025 Completed: Sep 12, 2025 (13 days late)
📅
11.6 days Total Age
⏱️
8.0d in Scheduled Longest Stage
🔄
9 transitions Status Changes
⚠️
11.1d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
17 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00521906
6008030173
Closed
Approval Note 08/25/2025 19:34:02 BRIAMESS Gratis approved. Regards, Brian ____________________ Approval Note 08/25/2025 16:04:23 WIGEORGE brian mess ____________________ Note 08/25/2025 15:57:49 WF-BATCH Agent: WIGEORGE Timestamp: 2025-08-25 15:57:43 Sean O’Brien sean.obrien@agilent.com mobile: 281-352-5334 warr field call following 6007878299; high background
Priority
Standard
Origin
Web
Reason
New Case
Contact
Jorge Iniguez
Owner
Leona Coonrod
Created
Aug 25, 2025
Work Orders from this Case (1)
WO-01299793 (current) Invoiced
Repair/PM • Curtis Sprague
Created: Aug 26, 2025 • Closed: Sep 11, 2025
Completed with significant delays
Invoiced • 190 days old
🚨
Primary Delay 8.0 days stuck in "Scheduled"
⏱️
Total Delay 11.1 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
L2 Screening
1.3d / 1.0d SLA
Ready for Scheduling
0.1d / 1.0d SLA
Assigned
2.0d / 0.5d SLA
Scheduled
8.0d / 2.0d SLA
Tech On Site
3.3d / 1.0d SLA
Closed
2.0d / 1.0d SLA
Ready to Bill
0.4d / 1.0d SLA
Invoice Pending
0.1d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

8/28 KKelch Jorge called me back to schedule for the units we have parts for on 9/9 and 9/10 between 9 and 10 am. Customer confirmed. Call logged on WO-01299793

8/28 KKelch called Jorge to let him know that there is one part on backorder and as soon as it comes in, I'll reach out to schedule. Left VM, sent email. Call and email logged on WO-01299793

8/27/25 CDempsey- Wo was just created, will get assigned and scheduled.

8/26/25 lcoonrod All parts have shipped on way bill 392509209426 Delivered Tuesday, 8/26/25 at 11:35 AM Signed for by: C.Christina

🔧 Work Performed
Arrived onsite. Met with POC Blake. Unboxed all parts for PM. Performed all PM protocols. Also installed new covers. After performing PM and checking the leak detector for functionality, POC told me that it takes a long time for unit to go into fine test and at the threshold for it going from High test to Fine test customer was having an issue with how long unit was taking to go into fine test. I hooked up my gauge to the test port to check on and see why it was taking so long to go into fine test. With the test gauge on and also when I cap the test port, everything functions as it should. It takes aprox 5 seconds to go into fine test. When I would hook up the customers bell that they use to test parts, it would take too long, or it wouldnt go into fine test. I informed the customer that there was a good chance that the reason why it won't go into fine test is because there is probably a leak/leaks in their system. Their system had a minimum of 14 connections after the test port going to their test bell. Informed the customer that the unit was testing as it should, and there really isn't much I can do after the connections leave the leak detector.
⚠️ Problem Description
Approval Note 08/25/2025 19:34:02 BRIAMESS Gratis approved. Regards, Brian ____________________ Approval Note 08/25/2025 16:04:23 WIGEORGE brian mess ____________________ Note 08/25/2025 15:57:49 WF-BATCH Agent: WIGEORGE Timestamp: 2025-08-25 15:57:43 Sean O’Brien sean.obrien@agilent.com mobile: 281-352-5334 warr field call following 6007878299; high background
📄 Description
VS MD30 Mobile Leak Detector
📞 Call Description
VPD Field Repair Trade

Timeline

📞
Case Linked Aug 25, 4:22 PM
Case Number: 00521906
Subject: 6008030173
Status: Closed
2.0 business days
📋
3 Work Order Created Aug 26, 5:20 PM
Work Order Created → 3x Parts Added → Status: L2 Screening
🔩
3x Parts Added
Type: Parts
Status: Open
Qty: 1
🔍
Status: L2 Screening by Leona Coonrod
From: Entered
To: L2 Screening
Duration in Previous: 1m
📅
Status: Ready for Scheduling by Leona Coonrod Aug 27, 10:34 AM
From: L2 Screening
To: Ready for Scheduling
Duration in Previous: 17h 12m
👷
2 Technician Assigned Aug 27, 11:39 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Kaitlyn Kelch
From: Ready for Scheduling
To: Assigned
Duration in Previous: 1h 4m
🗓️
2 Status: Scheduled Aug 28, 11:13 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2025-09-09T15:00:00.000+0000
⚠️ 8.0 business days
🔧
Status: Tech On Site by Curtis Sprague Sep 9, 11:26 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 12d 0h
3.0 business days
⏱️
2 11x Labor Added Sep 11, 9:38 PM
11x Labor Added → 2x Travel Added
🚗
2x Travel Added
Type: Travel
Status: Open
Qty: 8, 50
💵
Expenses Added Sep 11, 10:06 PM
Type: Expenses
Status: Open
Qty: 1
✔️
Status: Completed by Curtis Sprague Sep 11, 10:24 PM
From: Tech On Site, Completed
To: Completed, Closed
Duration in Previous: 2d 10h, 0m
2.2 business days
📄
Status: Ready to Bill by MICHAEL MCNAMARA Sep 15, 9:45 AM
From: Closed
To: Ready to Bill
Duration in Previous: 3d 11h
📨
Status: Invoice Pending by Hannah Shaw Sep 15, 12:57 PM
From: Ready to Bill
To: Invoice Pending
Duration in Previous: 3h 11m
💰
Status: Invoiced by Hannah Shaw Sep 15, 1:25 PM
From: Invoice Pending
To: Invoiced
Duration in Previous: 27m
3.0 business days
🧾
Invoice Created Sep 17, 9:27 PM
Invoice Number: SM-240958

Bottlenecks

L2 Screening
Duration: 1.3 business days (threshold: 1.0 business days)
Exceeded by 2.6 business hours
Assigned
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Scheduled
Duration: 8.0 business days (threshold: 2.0 business days)
Exceeded by 6.0 business days
Tech On Site
Duration: 3.3 business days (threshold: 1.0 business days)
Exceeded by 2.3 business days
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days

🔗 Related Artifacts

📞
Case 00521906
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Repair/PM
Branch
ERLA - PROD
Technician
Curtis Sprague
Scheduled
Sep 9, 11:00 AM
Created
Aug 26, 5:20 PM
Invoice #
SM-240958

Work Details (17)

Name Type Status Qty Amount Date
WL-02915536 Parts Open 1 $0.00 Aug 26, 5:21 PM
WL-02915537 Parts Open 1 $0.00 Aug 26, 5:21 PM
WL-02915538 Parts Open 1 $0.00 Aug 26, 5:21 PM
WL-02933334 Labor Open 0.5 $0.00 Sep 11, 9:38 PM
WL-02933335 Labor Open 3 $541.00 Sep 11, 9:38 PM
WL-02933336 Labor Open 1.5 $0.00 Sep 11, 9:38 PM
WL-02933337 Labor Open 11 $0.00 Sep 11, 9:38 PM
WL-02933338 Expenses Open 1 $13.41 Sep 11, 9:38 PM
WL-02933339 Expenses Open 1 $46.99 Sep 11, 9:38 PM
WL-02933340 Expenses Open 1 $30.00 Sep 11, 9:38 PM
WL-02933341 Expenses Open 1 $85.00 Sep 11, 9:38 PM
WL-02933342 Expenses Open 1 $85.00 Sep 11, 9:38 PM
WL-02933343 Expenses Open 1 $85.00 Sep 11, 9:38 PM
WL-02933344 Expenses Open 1 $85.00 Sep 11, 9:38 PM
WL-02933346 Travel Open 8 $0.00 Sep 11, 9:39 PM
WL-02933347 Travel Open 50 $300.00 Sep 11, 9:39 PM
WL-02933390 Expenses Open 1 $45.24 Sep 11, 10:06 PM

Details