Primary Delay12.0 days stuck in "Ready for Scheduling"
⏱️
Total Delay21.8 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
12.0d / 1.0d SLA
Assigned
5.0d / 0.5d SLA
Scheduled
0.0d / 2.0d SLA
Tech On Site
2.3d / 1.0d SLA
Completed
0.1d / 1.0d SLA
Closed
5.9d / 1.0d SLA
WO Correction Needed
0.1d
Ready to Bill
2.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
9/14/2025 Sramen - the due date on this should have been reflective of PSM. WO created on 8/27 so pushed due date to 9/26.
9-12 Mburris email sent to POC
9/12/2025 Sramen - found that the incorrect Account was used on the WO preventing the field from getting this on our reports. Worked with RMoore and she sent JFoley an email regarding this issue. I sent a chatter to ASC MBurris to work this today. Corrected account on the WO as well. Added delay code released past due date.
8/27/25 lcoonrod parts have not shipped yet
🔧Work Performed
The following items were completed.
# Complete inspection and cleaning of spectrometer, valve block and manifold
# Replacement of ion source and filaments
# New O-rings and seals if needed
# Verification of vacuum system integrity, helium sensitivity and system calibration
# Replacement of calibrated leak
# Provide ISO traceable certificate for calibrated leak.
Email: EMSAR Request for service at Aerojet Rocketdyne Inc (Email to schedule service)
Completed Sep 12, 2025
To: joshua.lundgren@l3harris.com
CC:
BCC: michael.burris@emsar.com
Attachment: --none--
Subject: EMSAR Request for service at Aerojet Rocketdyne Inc (Email to schedule service)
Body:
Hi Josh Lundgren,
I hope you’re doing well. I’m reaching out to schedule a service appointment for VS MD30 Mobile Leak Detector.
Here’s the location information we have on file:
Location:
Aerojet Rocketdyne Inc
11650 137th Place NE
Redmond, WA 98052
Contact:
Josh Lundgren
We currently have availability on