38R
SYS-LC-1290II
Contract ends 06/14/2026 includes repair
PMPLUS
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G7167B
DEBAS01615 1290 Infinity II Multisampler
G7120A
DEBAY05177 1290 Infinity II High Speed Pump
G7116B
DEBA412100 1290 Infinity II Multicolumn Thermostat
G7117A
DEBAV04897 1290 Infinity II Diode Array Detector FS
Please assign to Larry Alberty ARP to site is 18 miles. Zone 1
🔧Work Performed
Completed LC PM.
⚠️Problem Description
38R
SYS-LC-1290II
Contract ends 06/14/2026 includes repair
PMPLUS
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G7167B
DEBAS01615 1290 Infinity II Multisampler
G7120A
DEBAY05177 1290 Infinity II High Speed Pump
G7116B
DEBA412100 1290 Infinity II Multicolumn Thermostat
G7117A
DEBAV04897 1290 Infinity II Diode Array Detector FS
📄Description
1290 Infinity II High Speed Pump
📞Call Description
SEP 2025 LC PMPLUS
📞
Call
Completed Sep 15, 2025
15 SEP 2025 Larry Alberty
other travel on WO-01304053
📞
Call
Completed Aug 29, 2025
29 Aug 2025 Larry Alberty
Reached out for scheduling the onsite visit.