Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01300389 ↗ ServiceMax

AGILENT TECHNOLOGIES (ASP) • Relocation • PC

📍 Cerilliant Corp — 811 Paloma Dr Ste A, Round Rock TX, 78665

Aug 29, 2025 → Sep 8, 2025

✅ Completed
PC
SLA Clock
Per client agreement · Target: Sep 30, 2025
✓ SLA Met (16 biz days early)
Active: 5 biz days
🕐 Clock stopped: Tech Off Site (Sep 8, 2025)
▶ Clock Running
Status: Created
Aug 29 → Aug 29, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Aug 29 → Aug 29, 2025
0 business days (counted)
Running total: 0 of ? biz days used
2d
▶ Clock Running
Status: Assigned
Aug 29 → Sep 3, 2025
2 business days (counted)
Running total: 2 of ? biz days used
3d
▶ Clock Running
Status: Scheduled
Sep 3 → Sep 8, 2025
3 business days (counted)
Running total: 5 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 8 → Sep 8, 2025
0 business days (counted)
Running total: 5 of ? biz days used
Created: Aug 29, 2025 Tech Off Site: Sep 8, 2025
Show SLA Clock Detail (5 periods)
Period Status Clock Biz Days Running Total
Aug 29 → Aug 29 Created ▶ Running 0 0
Aug 29 → Aug 29 Ready for Scheduling ▶ Running 0 0
Aug 29 → Sep 3 Assigned ▶ Running 2 2
Sep 3 → Sep 8 Scheduled ▶ Running 3 5
Sep 8 → Sep 8 Tech On Site ▶ Running 0 5
Dispatch 0.0d
Coordinators 5.7d
Field Work 0.9d
Billing 10.6d
✓ SLA Met
Dispatch
0.0 days
Coordinators
5.7 days
Over SLA
Field Work
0.9 days
Billing
10.6 days
Over SLA
Created: Aug 29, 2025 Due: Sep 30, 2025 Completed: Sep 8, 2025 (22 days early)
📅
5.7 days Total Age
⏱️
10.6d in Ready to Bill Longest Stage
🔄
8 transitions Status Changes
⚠️
13.0d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
5 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00523355
6007536378
Closed
SYS-GC-7890A Relocation / EIQ / EOQ 313495190; RELO; Greg Faxon
Priority
High
Origin
Web
Reason
New Case
Contact
Andy Ommen
Owner
Leona Coonrod
Created
Aug 29, 2025
Work Orders from this Case (3)
WO-01300389 (current) Invoiced
Relocation • Jose Gutierrez
Created: Aug 29, 2025 • Closed: Sep 8, 2025
WO-01300390 Invoiced
EIQ • Jose Gutierrez
Created: Aug 29, 2025 • Closed: Sep 9, 2025
WO-01300393 Invoiced
EOQ • Jose Gutierrez
Created: Aug 29, 2025 • Closed: Sep 10, 2025
Completed with significant delays
Invoiced • 187 days old
🚨
Primary Delay 10.6 days stuck in "Ready to Bill"
⏱️
Total Delay 13.0 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
2.7d / 0.5d SLA
Scheduled
3.0d / 2.0d SLA
Tech On Site
0.6d / 1.0d SLA
Tech Off Site
0.3d / 2.0d SLA
Closed
1.2d / 1.0d SLA
Ready to Bill
10.6d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes
Please assign to Jose Gutierrez ARP to site is 101 miles. Zone 3
🔧 Work Performed
Plumbed GC gas lines and installed sampler components once instrument was placed in its correct location on lab bench. Verified GC was able to initialize without error and that EPC modules were supplying inlets and detectors with gas flow.
⚠️ Problem Description
SYS-GC-7890A Relocation / EIQ / EOQ 313495190; RELO; Greg Faxon
📄 Description
Agilent 7890A Series GC
📞 Call Description
SEP 2025 GC RELOCATION

Timeline

📞
4 Case Linked Aug 29, 2:26 PM
Case Linked → Work Order Created → Status: Ready for Scheduling → Technician Assigned
📋
Work Order Created
Work Order: WO-01300389
Type: Relocation
Priority: PC
📅
Status: Ready for Scheduling by Leona Coonrod
From: Entered, Ready for Scheduling
To: Ready for Scheduling, Assigned
Duration in Previous: 1m, 0m
👷
Technician Assigned by Leona Coonrod
Technician: Jose Gutierrez
3.0 business days
🗓️
2 Status: Scheduled Sep 3, 7:53 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Jose Gutierrez
Scheduled For: 2025-09-08T14:00:00.000+0000
3.5 business days
🔧
Status: Tech On Site by Jose Gutierrez Sep 8, 11:07 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 4d 15h
🚗
Status: Tech Off Site by Jose Gutierrez Sep 8, 3:32 PM
From: Tech On Site
To: Tech Off Site
Duration in Previous: 4h 24m
⏱️
5x Labor Added Sep 8, 5:50 PM
Type: Labor, Travel
Status: Open
Qty: 2.5, 1.5, 0.5, 108
✔️
Status: Completed by Jose Gutierrez Sep 8, 6:08 PM
From: Tech Off Site, Completed
To: Completed, Closed
Duration in Previous: 2h 36m, 0m
📄
Status: Ready to Bill by Hannah Shaw Sep 9, 3:34 PM
From: Closed
To: Ready to Bill
Duration in Previous: 21h 25m
🚨 11.0 business days
📨
Status: Invoice Pending by Hannah Shaw Sep 23, 9:21 AM
From: Ready to Bill
To: Invoice Pending
Duration in Previous: 13d 17h
💰
Status: Invoiced by Hannah Shaw Sep 23, 9:26 AM
From: Invoice Pending
To: Invoiced
Duration in Previous: 5m
2.0 business days
🧾
Invoice Created Sep 24, 10:39 AM
Invoice Number: SM-241753

Bottlenecks

Assigned
Duration: 2.7 business days (threshold: 4.0 business hours)
Exceeded by 2.2 business days
Scheduled
Duration: 3.0 business days (threshold: 2.0 business days)
Exceeded by 1.0 business days
Closed
Duration: 1.2 business days (threshold: 1.0 business days)
Exceeded by 1.8 business hours
Ready to Bill
Duration: 10.6 business days (threshold: 1.0 business days)
Exceeded by 9.6 business days

🔗 Related Artifacts

📞
Case 00523355
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
PC
Type
Relocation
Branch
N/A
Technician
Jose Gutierrez
Scheduled
Sep 8, 10:00 AM
Created
Aug 29, 2:26 PM
Invoice #
SM-241753

Work Details (5)

Name Type Status Qty Amount Date
WL-02928952 Labor Open 2.5 $0.00 Sep 8, 5:50 PM
WL-02928953 Labor Open 1.5 $171.00 Sep 8, 5:50 PM
WL-02928954 Labor Open 0.5 $0.00 Sep 8, 5:50 PM
WL-02928955 Travel Open 108 $539.00 Sep 8, 5:50 PM
WL-02928956 Travel Open 2 $0.00 Sep 8, 5:50 PM

Details