Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01303430 ↗ ServiceMax

Lovet Pet Health Care (Formerly Arizona Pet) • Virtual Tech - Field Repair • P3

📍 Lovet Pet Health Care - Norterra Animal Hospital - 8018 — 2005 W. Happy Valley Rd., Suite 180, Phoenix AZ, 85085

Sep 9, 2025 → Feb 9, 2026

✅ Completed
P3
SLA Clock
3 business days from creation · Target: Sep 12, 2025
✗ SLA Missed (26 biz days late)
Active: 29 biz days
Paused: 73 biz days
Budget: 3 biz days
🕐 Clock stopped: Completed (Feb 9, 2026)
SLA Target
▶ Clock Running
Status: Created
Sep 9 → Sep 9, 2025
0 business days (counted)
Running total: 0 of 3 biz days used
▶ Clock Running
Status: Ready for Scheduling
Sep 9 → Sep 9, 2025
0 business days (counted)
Running total: 0 of 3 biz days used
▶ Clock Running
Status: Assigned
Sep 9 → Sep 9, 2025
0 business days (counted)
Running total: 0 of 3 biz days used
▶ Clock Running
Status: Scheduled
Sep 9 → Sep 12, 2025
3 business days (counted)
Running total: 3 of 3 biz days used
▶ Clock Running
Status: Tech On Site
Sep 12 → Sep 12, 2025
0 business days (counted)
Running total: 3 of 3 biz days used
⏸24d
⏸ Clock Paused
Status: Awaiting Parts
Sep 12 → Oct 17, 2025
24 business days (not counted)
▶ Clock Running
Status: Reschedule
Oct 17 → Oct 21, 2025
2 business days (counted)
Running total: 5 of 3 biz days used
▶ Clock Running
Status: Assigned
Oct 21 → Oct 21, 2025
0 business days (counted)
Running total: 5 of 3 biz days used
▶ Clock Running
Status: Scheduled
Oct 21 → Oct 21, 2025
0 business days (counted)
Running total: 5 of 3 biz days used
▶ Clock Running
Status: Tech On Site
Oct 21 → Oct 21, 2025
0 business days (counted)
Running total: 5 of 3 biz days used
▶ Clock Running
Status: Completed
Oct 21 → Oct 21, 2025
0 business days (counted)
Running total: 5 of 3 biz days used
▶ Clock Running
Status: Incomplete
Oct 21 → Oct 27, 2025
4 business days (counted)
Running total: 9 of 3 biz days used
⏸43d
⏸ Clock Paused
Status: Awaiting Parts
Oct 27 → Dec 31, 2025
43 business days (not counted)
▶ Clock Running
Status: Reschedule
Dec 31 → Jan 2, 2026
1 business day (counted)
Running total: 10 of 3 biz days used
▶ Clock Running
Status: Scheduled
Jan 2 → Jan 9, 2026
5 business days (counted)
Running total: 15 of 3 biz days used
▶ Clock Running
Status: Tech On Site
Jan 9 → Jan 9, 2026
0 business days (counted)
Running total: 15 of 3 biz days used
▶ Clock Running
Status: Reschedule
Jan 9 → Jan 9, 2026
0 business days (counted)
Running total: 15 of 3 biz days used
▶ Clock Running
Status: Completed
Jan 9 → Jan 15, 2026
4 business days (counted)
Running total: 19 of 3 biz days used
⏸ Clock Paused
Status: Awaiting Parts
Jan 15 → Jan 26, 2026
6 business days (not counted)
▶ Clock Running
Status: Reschedule
Jan 26 → Feb 5, 2026
8 business days (counted)
Running total: 27 of 3 biz days used
▶ Clock Running
Status: Assigned
Feb 5 → Feb 5, 2026
0 business days (counted)
Running total: 27 of 3 biz days used
▶ Clock Running
Status: Scheduled
Feb 5 → Feb 9, 2026
2 business days (counted)
Running total: 29 of 3 biz days used
▶ Clock Running
Status: Tech On Site
Feb 9 → Feb 9, 2026
0 business days (counted)
Running total: 29 of 3 biz days used
Created: Sep 9, 2025 Completed: Feb 9, 2026
Business Days Used 29 / 3
0 3d budget +26d over
Show SLA Clock Detail (23 periods)
Period Status Clock Biz Days Running Total
Sep 9 → Sep 9 Created ▶ Running 0 0 / 3
Sep 9 → Sep 9 Ready for Scheduling ▶ Running 0 0 / 3
Sep 9 → Sep 9 Assigned ▶ Running 0 0 / 3
Sep 9 → Sep 12 Scheduled ▶ Running 3 3 / 3
Sep 12 → Sep 12 Tech On Site ▶ Running 0 3 / 3
Sep 12 → Oct 17 Awaiting Parts ⏸ Paused 24
Oct 17 → Oct 21 Reschedule ▶ Running 2 5 / 3
Oct 21 → Oct 21 Assigned ▶ Running 0 5 / 3
Oct 21 → Oct 21 Scheduled ▶ Running 0 5 / 3
Oct 21 → Oct 21 Tech On Site ▶ Running 0 5 / 3
Oct 21 → Oct 21 Completed ▶ Running 0 5 / 3
Oct 21 → Oct 27 Incomplete ▶ Running 4 9 / 3
Oct 27 → Dec 31 Awaiting Parts ⏸ Paused 43
Dec 31 → Jan 2 Reschedule ▶ Running 1 10 / 3
Jan 2 → Jan 9 Scheduled ▶ Running 5 15 / 3
Jan 9 → Jan 9 Tech On Site ▶ Running 0 15 / 3
Jan 9 → Jan 9 Reschedule ▶ Running 0 15 / 3
Jan 9 → Jan 15 Completed ▶ Running 4 19 / 3
Jan 15 → Jan 26 Awaiting Parts ⏸ Paused 6
Jan 26 → Feb 5 Reschedule ▶ Running 8 27 / 3
Feb 5 → Feb 5 Assigned ▶ Running 0 27 / 3
Feb 5 → Feb 9 Scheduled ▶ Running 2 29 / 3
Feb 9 → Feb 9 Tech On Site ▶ Running 0 29 / 3
Dispatch 0.0d
Material Management 75.2d
Coordinators 29.4d
Field Work 0.7d
Incomplete 4.1d (excluded)
Billing 0.0d
✗ SLA Missed
Dispatch
0.0 days
Material Management
75.2 days
Over SLA
Coordinators
29.4 days
Over SLA
Field Work
0.7 days
Incomplete (excluded from total)
4.1 days
Billing
0.0 days
Created: Sep 9, 2025 Due: Jan 30, 2026 Completed: Feb 9, 2026 (9 days late)
📅
102.6 days Total Age
⏱️
43.9d in Awaiting Parts Longest Stage
🔄
22 transitions Status Changes
⚠️
83.8d over Total Delay
📦
3 orders, 0 quotes Parts & Quotes
📝
21 lines Work Details
🚩
4 visits On-Site Trips
👤
Self-Scheduled Scheduling
🚩
4 On-Site Visits (4 reschedules)
4 on-site visits — why were multiple trips needed?
👤 Self-scheduled by Tyler Bollman — scheduling delays attributed to technician, not coordinators
Visit 1 Sep 12, 2025
Visit 2 Oct 21, 2025
Visit 3 Jan 9, 2026
Visit 4 Feb 9, 2026

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00525722
<no subject>
Closed
Notes: The drill hand piece on our dental unitis leaking water and the hand scaler does not always turn on or stay on. Model: iM3 - Pro 2000 Model Type: Dental Delivery Unit Asset ID: 13105449 Site: Lovet Pet Health Care (Formerly Arizona Pet) - Lovet Pet Health Care - Norterra Animal Hospital - 8018<https://www.ebiotrack.com/sites.php?sid=21545> Serial #: PRO2022-C1363
Priority
Standard
Origin
Email
Reason
New Case
Contact
Molly Brown
Owner
Virtual Tech
Created
Sep 9, 2025
Work Orders from this Case (1)
WO-01303430 (current) Invoiced
Virtual Tech - Field Repair • Tyler Bollman
Created: Sep 9, 2025 • Closed: Feb 9, 2026
Completed with significant delays
Invoiced • 176 days old
🚨
Primary Delay 43.9 days stuck in "Awaiting Parts"
⏱️
Total Delay 83.8 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
0.0d / 0.5d SLA
Scheduled
12.2d / 2.0d SLA
Tech On Site
0.5d / 1.0d SLA
Awaiting Parts
75.2d / 3.0d SLA
Reschedule
17.3d / 2.0d SLA
Incomplete
4.1d
Completed
0.2d / 1.0d SLA
Closed
3.3d / 1.0d SLA
Ready to Bill
0.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

2/5 KKelch Jess called me back to confirm that they received parts and asked to schedule for 2/9 between 2:30 and 3:30 pm. Customer confirmed. She also mentioned that they've been attempting to put in WOs for additional units that are down but there is an issue as I haven't seen anything in SMX. Advised by RBerry to send an email to dispatch to get those tickets created, I advised the customer that I will add these to Monday. 

2/5 KKelch called Molly to see if they ever located the water line needed for this repair. I left my phone number for her to call me back as she let me know that they are having issues with the post office so she is going to track down the part and call me back.

1/9 KKelch-site was unable to locate part, will call us back when they locate the part

12/10/25 CDempsey- Escalated to Brad for status of parts order.

11/20/25 CDempsey- sending to Brad so he can obtain update from MM.

0/27/25 TMS emailed IM3 for proper part number


10/21 KKelch added to previously scheduled date with site. Please see logged call on WO-01309905

10/20/2025 Sramen - updated due date based on parts. Removed delay code.

9/9 KKelch called Molly to schedule for 9/12 between 3 and 4 pm. Customer confirmed. 

🔧 Work Performed
9/12/25 Evaluated unit. Drill just needed tightened leak gone. Sputtering will need a new inline filter 10/21/2025 - Tech was given the part that was sent to the customer. The wrong part was sent. The part that was sent was an oil filter for a car. Needs to be a inline filter. Photo included. No charge for this trip. 1/9/2026 - Tech arrived on site and was brought to the back. Tech asked if the part was delivered and front office worker, Rain, stated she would call her manager, Jess. Tech talked to Jess, and she stated she doesn't remember a part coming. Tech looked it up and told Jess that it says it was delivered on December 23rd. Jess had Rain look for part. Rain couldn't find part, and Jess was coming in later. Jess stated that she would look for part and call us back if found. 2/9 Filter Replaced and system tested returned to operation
🔍 Technician Findings
Drill leaking and scaler sputtering
⚠️ Problem Description
Troubleshoot Drill leak and scaler issues. Notes: The drill hand piece on our dental unitis leaking water and the hand scaler does not always turn on or stay on. Model: iM3 - Pro 2000 Model Type: Dental Delivery Unit Asset ID: 13105449 Site: Lovet Pet Health Care (Formerly Arizona Pet) - Lovet Pet Health Care - Norterra Animal Hospital - 8018 Serial #: PRO2022-C1363 https://www.ebiotrack.com/workorder.php?wo=68078

Timeline

📞
Case Linked Sep 9, 2:19 PM
Case Number: 00525722
Subject: <no subject>
Status: Closed
📋
5 Work Order Created Sep 9, 3:10 PM
Work Order Created → Status: Ready for Scheduling → Technician Assigned → Dispatch Scheduled → Status: Scheduled
📅
Status: Ready for Scheduling by Derek Reynolds
From: Entered, Ready for Scheduling
To: Ready for Scheduling, Assigned
Duration in Previous: 0m, 1m
👷
Technician Assigned by Kaitlyn Kelch
Technician: a0h8Y00000JTCJcQAP, Tyler Bollman
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2025-09-12T22:00:00.000+0000
🗓️
Status: Scheduled by Kaitlyn Kelch
From: Assigned
To: Scheduled
Duration in Previous: 3m
4.0 business days
🔧
Status: Tech On Site by Tyler Bollman Sep 12, 4:24 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 3d 1h
🚗
3 3x Travel Added Sep 12, 4:32 PM
3x Travel Added → Parts Requested → Status: Awaiting Parts
📦
Parts Requested
Order: 00081703
Status: Closed
📦
Status: Awaiting Parts by Tyler Bollman
From: Tech On Site
To: Awaiting Parts
Duration in Previous: 9m
🚨 24.9 business days
🔩
2 2x Parts Added Oct 17, 6:43 PM
2x Parts Added → Status: Reschedule
🔄
Status: Reschedule by Keith Fricke
From: Awaiting Parts
To: Reschedule
Duration in Previous: 35d 2h
2.7 business days
👷
3 Technician Assigned Oct 21, 1:02 PM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Kaitlyn Kelch
From: Reschedule, Assigned
To: Assigned, Scheduled
Duration in Previous: 3d 18h, 0m
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2025-10-21T20:00:00.000+0000
🚗
Travel Added Oct 21, 3:53 PM
Type: Travel
Status: Open
Qty: 79
🔧
Status: Tech On Site by Andrew Przybyla Oct 21, 4:08 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 3h 5m
⏱️
3x Labor Added Oct 21, 6:41 PM
Type: Labor, Expenses
Status: Open
Qty: 1, 2
✔️
Status: Completed by Andrew Przybyla Oct 21, 7:30 PM
From: Tech On Site, Completed
To: Completed, Incomplete
Duration in Previous: 3h 22m, 0m
4.6 business days
📦
2 Parts Requested Oct 27, 12:59 PM
Parts Requested → Status: Awaiting Parts
📦
Status: Awaiting Parts by Tonya Santiago
From: Incomplete
To: Awaiting Parts
Duration in Previous: 5d 17h
🚨 44.0 business days
🔩
2 2x Parts Added Dec 31, 12:50 PM
2x Parts Added → Status: Reschedule
🔄
Status: Reschedule by Keith Fricke
From: Awaiting Parts
To: Reschedule
Duration in Previous: 65d 0h
2.0 business days
🗓️
2 Status: Scheduled Jan 2, 9:40 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2026-01-07T18:00:00.000+0000
2.0 business days
📅
Dispatch Scheduled by Kaitlyn Kelch Jan 5, 5:14 PM
Scheduled For: 2026-01-08T21:00:00.000+0000, 2026-01-08T20:00:00.000+0000
📅
Dispatch Scheduled by Kaitlyn Kelch Jan 6, 10:08 AM
Scheduled For: 2026-01-09T15:00:00.000+0000
4.0 business days
🔧
Status: Tech On Site by Andrew Przybyla Jan 9, 10:00 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 7d 0h
⏱️
2x Labor Added Jan 9, 10:05 AM
Type: Labor, Travel
Status: Open
Qty: 2, 79
⏱️
3x Labor Added Jan 9, 10:22 AM
Type: Labor, Travel
Status: Open
Qty: 0.5, 11
🔄
Status: Reschedule by Andrew Przybyla Jan 9, 10:59 AM
From: Completed, Tech On Site
To: Reschedule, Completed
Duration in Previous: 59m, 0m
⚠️ 5.0 business days
📦
2 Parts Requested Jan 15, 11:51 AM
Parts Requested → Status: Awaiting Parts
📦
Status: Awaiting Parts by Wendy Argueta
From: Reschedule
To: Awaiting Parts
Duration in Previous: 6d 0h
⚠️ 7.0 business days
🔩
2 2x Parts Added Jan 26, 4:24 PM
2x Parts Added → Status: Reschedule
🔄
Status: Reschedule by Amy Greene
From: Awaiting Parts
To: Reschedule
Duration in Previous: 11d 4h
⚠️ 8.9 business days
👷
3 Technician Assigned Feb 5, 5:23 PM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Kaitlyn Kelch
From: Reschedule, Assigned
To: Assigned, Scheduled
Duration in Previous: 10d 0h, 0m
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2026-02-09T20:30:00.000+0000
2.8 business days
🔧
Status: Tech On Site by Tyler Bollman Feb 9, 3:39 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 3d 22h
⏱️
3x Labor Added Feb 9, 4:03 PM
Type: Labor, Travel
Status: Open
Qty: 0.5, 1, 19
✔️
Status: Completed by Tyler Bollman Feb 9, 4:18 PM
From: Tech On Site
To: Completed
Duration in Previous: 39m
🏁
Status: Closed by Tyler Bollman Feb 9, 4:35 PM
From: Completed
To: Closed
Duration in Previous: 16m
3.9 business days
📄
4 Status: Ready to Bill Feb 12, 5:59 PM
Status: Ready to Bill → Status: Invoice Pending → Status: Invoiced → Invoice Created
📨
Status: Invoice Pending by Diane Patton
From: Ready to Bill
To: Invoice Pending
Duration in Previous: 1m
💰
Status: Invoiced by Diane Patton
From: Invoice Pending
To: Invoiced
Duration in Previous: 1m
🧾
Invoice Created
Invoice Number: SM-253771

Bottlenecks

Scheduled
Duration: 3.6 business days (threshold: 2.0 business days)
Exceeded by 1.6 business days
Awaiting Parts
Duration: 24.4 business days (threshold: 3.0 business days)
Exceeded by 21.4 business days
Reschedule
Duration: 2.2 business days (threshold: 2.0 business days)
Exceeded by 1.3 business hours
Awaiting Parts
Duration: 43.9 business days (threshold: 3.0 business days)
Exceeded by 40.9 business days
Scheduled
Duration: 6.0 business days (threshold: 2.0 business days)
Exceeded by 4.0 business days
Reschedule
Duration: 5.0 business days (threshold: 2.0 business days)
Exceeded by 3.0 business days
Awaiting Parts
Duration: 6.9 business days (threshold: 3.0 business days)
Exceeded by 3.9 business days
Reschedule
Duration: 8.3 business days (threshold: 2.0 business days)
Exceeded by 6.3 business days
Scheduled
Duration: 2.2 business days (threshold: 2.0 business days)
Exceeded by 1.6 business hours
Closed
Duration: 3.3 business days (threshold: 1.0 business days)
Exceeded by 2.3 business days

🔗 Related Artifacts

📞
Case 00525722
Closed
📦
Parts Order 00081703
Closed
📦
Parts Order 00084219
Closed
📦
Parts Order 00088368
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
P3
Type
Virtual Tech - Field Repair
Branch
N/A
Technician
Tyler Bollman
Scheduled
Feb 9, 3:30 PM
Created
Sep 9, 3:10 PM
Invoice #
SM-253771

Work Details (21)

Name Type Status Qty Amount Date
WL-02934545 Travel Open 20 - Sep 12, 4:32 PM
WL-02934546 Labor Open 0.5 $39.50 Sep 12, 4:32 PM
WL-02934547 Labor Open 1 $149.00 Sep 12, 4:32 PM
WL-02975499 Parts Open 1 $0.00 Oct 17, 6:43 PM
WL-02975500 Expenses Open 1 $18.74 Oct 17, 6:43 PM
WL-02978668 Travel Open 79 - Oct 21, 3:53 PM
WL-02978969 Labor Open 1 $149.00 Oct 21, 6:41 PM
WL-02978970 Labor Open 2 $0.00 Oct 21, 6:41 PM
WL-02978971 Expenses Open 1 $0.00 Oct 21, 6:41 PM
WL-03051559 Parts Open 1 $0.00 Dec 31, 12:50 PM
WL-03051560 Expenses Open 1 $0.00 Dec 31, 12:50 PM
WL-03059274 Labor Open 2 $158.00 Jan 9, 10:05 AM
WL-03059275 Travel Open 79 - Jan 9, 10:05 AM
WL-03059291 Labor Open 0.5 $74.50 Jan 9, 10:22 AM
WL-03059292 Labor Open 0.5 $39.50 Jan 9, 10:22 AM
WL-03059293 Travel Open 11 - Jan 9, 10:22 AM
WL-03079255 Parts Open 1 $12.18 Jan 26, 4:24 PM
WL-03079256 Expenses Open 1 $17.60 Jan 26, 4:24 PM
WL-03097999 Labor Open 0.5 $39.50 Feb 9, 4:03 PM
WL-03098000 Labor Open 1 $149.00 Feb 9, 4:03 PM
WL-03098001 Travel Open 19 - Feb 9, 4:03 PM

Details