WO-01304049 ↗ ServiceMax

AGILENT TECHNOLOGIES (ASP) • Repair • PC

📍 Amgen Inc — 1 Amgen Center Dr, Thousand Oaks CA, 91320

Sep 11, 2025 → Sep 16, 2025

✅ Completed
PC
SLA Clock
Per client agreement · Target: Sep 18, 2025
✓ SLA Met (2 biz days early)
Active: 3 biz days
🕐 Clock stopped: Completed (Sep 16, 2025)
▶ Clock Running
Status: Created
Sep 11 → Sep 11, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Sep 11 → Sep 11, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Sep 11 → Sep 11, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 11 → Sep 11, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Tech Off Site
Sep 11 → Sep 11, 2025
0 business days (counted)
Running total: 0 of ? biz days used
1d
▶ Clock Running
Status: Scheduled
Sep 11 → Sep 12, 2025
1 business day (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 12 → Sep 13, 2025
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Tech Off Site
Sep 13 → Sep 13, 2025
0 business days (counted)
Running total: 1 of ? biz days used
1d
▶ Clock Running
Status: Reschedule
Sep 13 → Sep 15, 2025
1 business day (counted)
Running total: 2 of ? biz days used
1d
▶ Clock Running
Status: Assigned
Sep 15 → Sep 16, 2025
1 business day (counted)
Running total: 3 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 16 → Sep 16, 2025
0 business days (counted)
Running total: 3 of ? biz days used
Created: Sep 11, 2025 Completed: Sep 16, 2025
Show SLA Clock Detail (11 periods)
Period Status Clock Biz Days Running Total
Sep 11 → Sep 11 Created ▶ Running 0 0
Sep 11 → Sep 11 Ready for Scheduling ▶ Running 0 0
Sep 11 → Sep 11 Assigned ▶ Running 0 0
Sep 11 → Sep 11 Tech On Site ▶ Running 0 0
Sep 11 → Sep 11 Tech Off Site ▶ Running 0 0
Sep 11 → Sep 12 Scheduled ▶ Running 1 1
Sep 12 → Sep 13 Tech On Site ▶ Running 0 1
Sep 13 → Sep 13 Tech Off Site ▶ Running 0 1
Sep 13 → Sep 15 Reschedule ▶ Running 1 2
Sep 15 → Sep 16 Assigned ▶ Running 1 3
Sep 16 → Sep 16 Tech On Site ▶ Running 0 3
Dispatch 0.0d
Coordinators 4.1d
Field Work 1.6d
Billing 14.8d
✓ SLA Met
Dispatch
0.0 days
Coordinators
4.1 days
Over SLA
Field Work
1.6 days
Billing
14.8 days
Over SLA
Created: Sep 11, 2025 Due: Sep 18, 2025 Completed: Sep 16, 2025 (2 days early)
📅
3.4 days Total Age
⏱️
13.5d in Ready to Bill Longest Stage
🔄
14 transitions Status Changes
⚠️
14.4d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
14 lines Work Details
🚩
3 visits On-Site Trips
👤
Self-Scheduled Scheduling
🚩
3 On-Site Visits (1 reschedule)
3 on-site visits — why were multiple trips needed?
👤 Self-scheduled by Jared Rappaport — scheduling delays attributed to technician, not coordinators
Visit 1 Sep 11, 2025
Visit 2 Sep 12, 2025
Visit 3 Sep 16, 2025

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00526572
6008061382
Closed
15K SYS-LC-1260 Repair WO80813339:MOTOR POWER TOO HIGH
Priority
High
Origin
Web
Reason
New Case
Contact
Diana Hernandez Guerrero
Owner
Leona Coonrod
Created
Sep 11, 2025
Work Orders from this Case (1)
WO-01304049 (current) Invoiced
Repair • Jared Rappaport
Created: Sep 11, 2025 • Closed: Sep 16, 2025
Completed with significant delays
Invoiced • 174 days old
🚨
Primary Delay 13.5 days stuck in "Ready to Bill"
⏱️
Total Delay 14.4 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
2.0d / 0.5d SLA
Tech On Site
1.2d / 1.0d SLA
Tech Off Site
0.2d / 2.0d SLA
Scheduled
1.1d / 2.0d SLA
Reschedule
1.0d / 2.0d SLA
Completed
0.2d / 1.0d SLA
Closed
1.4d / 1.0d SLA
Ready to Bill
13.5d / 1.0d SLA
Invoice Pending
1.2d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

Please assign to Jared Rappaport ARP to site is 17 miles. Zone 1


09-11-2025 JR Awaiting parts - part required to complete repair.


9-12-2025 JR – Original issues (motor high power and active inlet valve leaks) were resolved, but new leaks developed. Additional parts order required; status changed to reschedule pending parts.

🔧 Work Performed
Repaired Agilent G1312 Binary Pump.
🔍 Technician Findings
During PM pump seal replacement, reassembling Channel A pump head revealed damaged mounting posts causing misalignment and triggering a pump drive "motor power high” error. Unstacked solvent tray, degasser, and pump modules, opened pump module top, replaced pump drive assembly with refurbished exchange unit, verified proper alignment, and restacked modules. Additional issues: Active Inlet Valve leaking — attempted cartridge replacement, replaced complete AIV assembly. Restriction capillary (mixing capillary to pressure sensor) leaking — replaced capillary. Outlet ball valve leaking — replaced valve and adsorber capillary. Performed leak test, system pressure test, valve test, and pump elasticity calibration; all tests passed (as documented in PM work order SO 6007983923). Pump operated normally under load.
⚠️ Problem Description
15K SYS-LC-1260 Repair WO80813339:MOTOR POWER TOO HIGH
📄 Description
1260 Binary Pump
📞 Call Description
SEP 2025 LC REPAIR

Timeline

📞
4 Case Linked Sep 11, 4:33 PM
Case Linked → Work Order Created → Status: Ready for Scheduling → Technician Assigned
📋
Work Order Created
Work Order: WO-01304049
Type: Repair
Priority: PC
📅
Status: Ready for Scheduling by Leona Coonrod
From: Entered, Ready for Scheduling
To: Ready for Scheduling, Assigned
Duration in Previous: 0m
👷
Technician Assigned by Leona Coonrod
Technician: Jared Rappaport
🔧
Status: Tech On Site by Jared Rappaport Sep 11, 4:54 PM
From: Assigned
To: Tech On Site
Duration in Previous: 19m
⏱️
2 Labor Added Sep 11, 5:37 PM
Labor Added → Status: Tech Off Site
🚗
Status: Tech Off Site by Jared Rappaport
From: Tech On Site
To: Tech Off Site
Duration in Previous: 43m
🗓️
2 Status: Scheduled Sep 11, 7:13 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Jared Rappaport
Scheduled For: 2025-09-12T20:30:00.000+0000
🔧
Status: Tech On Site by Jared Rappaport Sep 12, 3:28 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 20h 15m
⏱️
2 Labor Added Sep 12, 8:33 PM
Labor Added → Status: Tech Off Site
🚗
Status: Tech Off Site by Jared Rappaport
From: Tech On Site
To: Tech Off Site
Duration in Previous: 5h 5m
⏱️
2 2x Labor Added Sep 12, 9:09 PM
2x Labor Added → Status: Reschedule
🔄
Status: Reschedule by Jared Rappaport
From: Tech Off Site
To: Reschedule
Duration in Previous: 39m
1.3 business days
👷
2 Technician Assigned Sep 15, 10:26 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Michael Burris
From: Reschedule
To: Assigned
Duration in Previous: 2d 13h
2.0 business days
🔧
2 Status: Tech On Site Sep 16, 11:18 AM
Status: Tech On Site → 2x Labor Added
⏱️
2x Labor Added
Type: Labor, Travel
Status: Open
Qty: 0.66666666666667, 17
🔩
5x Parts Added Sep 16, 2:47 PM
Type: Parts
Status: Open
Qty: 1, 2
🔩
2 Parts Added Sep 16, 3:11 PM
Parts Added → 2x Labor Added
⏱️
2x Labor Added
Type: Labor
Status: Open
Qty: 2.75, 0.75
✔️
Status: Completed by Jared Rappaport Sep 16, 3:21 PM
From: Tech On Site
To: Completed
Duration in Previous: 4h 2m
🏁
Status: Closed by Jared Rappaport Sep 16, 5:04 PM
From: Completed
To: Closed
Duration in Previous: 1h 43m
📄
Status: Ready to Bill by Hannah Shaw Sep 17, 3:51 PM
From: Closed
To: Ready to Bill
Duration in Previous: 22h 46m
🚨 14.0 business days
📨
Status: Invoice Pending by Hannah Shaw Oct 6, 6:06 PM
From: Ready to Bill
To: Invoice Pending
Duration in Previous: 19d 2h
💰
Status: Invoiced by Hannah Shaw Oct 7, 1:54 PM
From: Invoice Pending
To: Invoiced
Duration in Previous: 19h 47m
🧾
Invoice Created Oct 7, 3:31 PM
Invoice Number: SM-243053

Bottlenecks

Assigned
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Closed
Duration: 1.4 business days (threshold: 1.0 business days)
Exceeded by 2.9 business hours
Ready to Bill
Duration: 13.5 business days (threshold: 1.0 business days)
Exceeded by 12.5 business days

🔗 Related Artifacts

📞
Case 00526572
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
PC
Type
Repair
Branch
N/A
Technician
Jared Rappaport
Scheduled
N/A
Created
Sep 11, 4:34 PM
Invoice #
SM-243053

Work Details (14)

Name Type Status Qty Amount Date
WL-02932880 Labor Open 1.2 $156.00 Sep 11, 5:37 PM
WL-02934883 Labor Open 5 $650.00 Sep 12, 8:33 PM
WL-02934895 Labor Open 0.66666666666667 $0.00 Sep 12, 9:09 PM
WL-02934896 Travel Open 17 $0.00 Sep 12, 9:09 PM
WL-02937150 Labor Open 0.66666666666667 $0.00 Sep 16, 11:19 AM
WL-02937151 Travel Open 17 $0.00 Sep 16, 11:19 AM
WL-02937395 Parts Open 1 $0.00 Sep 16, 2:47 PM
WL-02937397 Parts Open 1 $0.00 Sep 16, 2:47 PM
WL-02937398 Parts Open 1 $0.00 Sep 16, 2:47 PM
WL-02937399 Parts Open 2 $0.00 Sep 16, 2:47 PM
WL-02937396 Parts Open 1 $0.00 Sep 16, 2:47 PM
WL-02937443 Parts Open 1 $0.00 Sep 16, 3:11 PM
WL-02937448 Labor Open 2.75 $357.50 Sep 16, 3:14 PM
WL-02937449 Labor Open 0.75 $97.50 Sep 16, 3:14 PM

Details