Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Nov 30, 2025
✓ SLA Met (3 biz days early)
🕐 Clock stopped: Tech Off Site (Nov 21, 2025)
▶ Clock Running
Status: Created
Sep 15 → Sep 15, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Sep 15 → Sep 15, 2025
0 business days (counted)
Running total: 0 of ? biz days used
17d
▶ Clock Running
Status: Assigned
Sep 15 → Oct 8, 2025
17 business days (counted)
Running total: 17 of ? biz days used
13d
▶ Clock Running
Status: Scheduled
Oct 8 → Oct 28, 2025
13 business days (counted)
Running total: 30 of ? biz days used
▶ Clock Running
Status: Reschedule
Oct 28 → Nov 2, 2025
3 business days (counted)
Running total: 33 of ? biz days used
12d
▶ Clock Running
Status: Scheduled
Nov 2 → Nov 19, 2025
12 business days (counted)
Running total: 45 of ? biz days used
▶ Clock Running
Status: Tech On Site
Nov 19 → Nov 21, 2025
2 business days (counted)
Running total: 47 of ? biz days used
Created: Sep 15, 2025
Tech Off Site: Nov 21, 2025
Show SLA Clock Detail (7 periods)
Period
Status
Clock
Biz Days
Running Total
Sep 15 → Sep 15
Created
▶ Running
0
0
Sep 15 → Sep 15
Ready for Scheduling
▶ Running
0
0
Sep 15 → Oct 8
Assigned
▶ Running
17
17
Oct 8 → Oct 28
Scheduled
▶ Running
13
30
Oct 28 → Nov 2
Reschedule
▶ Running
3
33
Nov 2 → Nov 19
Scheduled
▶ Running
12
45
Nov 19 → Nov 21
Tech On Site
▶ Running
2
47
Coordinators
47.6 days
Over SLA
Field Work
3.0 days
Over SLA
Billing
8.2 days
Over SLA
Created: Sep 15, 2025
Due: Nov 30, 2025
Completed: Nov 23, 2025 (7 days early)
⏱️
17.8d in Assigned
Longest Stage
🔄
10 transitions
Status Changes
⚠️
49.3d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
🔄
2 On-Site Visits
(1 reschedule)
2 on-site visits — follow-up trip required
👤 Self-scheduled by Maria Davis — scheduling delays attributed to technician, not coordinators
Visit 1
Nov 19, 2025
Visit 2
Nov 20, 2025
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00527258
6008019669
Closed
28U
SYS-GC-6890N
Contract ends 12/31/2025 includes Repair
PM / EOQ
G1530N
CN10636087 6890N Network GC System
G2913A
CN61632521 7683B Autoinjector Module
G2614A
CN41528592 7683 Autosampler tray module
🚨
Primary Delay
17.8 days stuck in "Assigned"
⏱️
Total Delay
49.3 business days over SLA thresholds
SLA vs Actual Time by Status
Assigned
17.8d
/ 0.5d SLA
Scheduled
26.0d
/ 2.0d SLA
Reschedule
3.8d
/ 2.0d SLA
Tech On Site
2.0d
/ 1.0d SLA
Tech Off Site
1.0d
/ 2.0d SLA
Ready to Bill
8.2d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📅 Events (1)
🔒
Internal CSA Notes
11/20 Travel, mileage and zone are on WO-01305709 . MD
11/19 Travel, mileage and zone are on WO-01304413 . MD
Please assign to Maria Davis ARP to site is 151 miles. Zone 4
🔧
Work Performed
1120/2025 EEOQ was completed per Agilent checklist. GC was off for weeks and take longer to get the FIDs base line to stabilized. ALL tests passed.
11/19/2025 EEOQ GC session ACE 3.x was created, columns were installed and started.
⚠️
Problem Description
28U
SYS-GC-6890N
Contract ends 12/31/2025 includes Repair
PM / EOQ
G1530N
CN10636087 6890N Network GC System
G2913A
CN61632521 7683B Autoinjector Module
G2614A
CN41528592 7683 Autosampler tray module
📄
Description
GC 6890N System
📞
Call Description
NOV 2025 GC EOQ
📅
WO-01304414 - EOQ - SYS-GC-6890N - Waco - Allergan Inc
Nov 19, 2025 3:00pm – 3:00pm
Work Order: WO-01304414
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008019669
Location: Allergan Inc
Address: 8301 Mars Dr, Waco, TX 76712
Manufacturer:
Model #: SYS-GC-6890N
Serial #: S-ALLE-GC-26484776479
Contact Name: Rene Palacios
Contact Phone: 254-666-8743
Contact Email: rene.p
Timeline
📞
📋
Work Order:
WO-01304414
Type:
EOQ
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
🗓️
📅
Scheduled For:
2025-11-19T20:00:00.000+0000
🔄
From:
Scheduled
To:
Reschedule
Duration in Previous:
20d 4h
🗓️
📅
Scheduled For:
2025-11-19T09:00:00.000+0000
📅
Scheduled For:
2025-11-19T20:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
16d 23h
🚗
From:
Tech On Site
To:
Tech Off Site
Duration in Previous:
1d 8h
⏱️
Type:
Labor
Status:
Open
Qty:
3, 5
✔️
From:
Tech Off Site, Completed
To:
Completed, Closed
Duration in Previous:
2d 14h, 0m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
1d 5h
📨
🧾
Invoice Number:
SM-248486
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
3m
Bottlenecks
Assigned
Duration: 17.8 business days (threshold: 4.0 business hours)
Exceeded by 17.3 business days
Scheduled
Duration: 14.0 business days (threshold: 2.0 business days)
Exceeded by 12.0 business days
Reschedule
Duration: 3.8 business days (threshold: 2.0 business days)
Exceeded by 1.8 business days
Scheduled
Duration: 12.0 business days (threshold: 2.0 business days)
Exceeded by 10.0 business days
Tech On Site
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Ready to Bill
Duration: 8.2 business days (threshold: 1.0 business days)
Exceeded by 7.2 business days
ℹ️ Work Order Details
Scheduled
Nov 19, 3:00 PM
Work Details (2)
Name
Type
Status
Qty
Amount
Date
WL-03017588
Labor
Open
3
$0.00
Nov 23, 10:52 AM
WL-03017589
Labor
Open
5
$684.00
Nov 23, 10:52 AM