Annual Equipment Electrical Safety Test And Calibration Service
Equipment: 22
https://www.ebiotrack.com/inspection.php?iid=30157
Inspection Flag: ATTENTION TECHS, ASC'S AND MATERIALS MANAGEMENT.
DO NOT SHIP PARTS TO ANY CROSSOVER SITES. ALL PARTS FOR THIS ACCOUNT MUST BE SHIPPED DIRECTLY TO THE TECH. THE SITE WILL LOSE THE SHIPMENT IF SENT TO THEM.
9/18/2025 Sramen - Due date entered incorrectly. This is a November inspection.
9/18/2025 CRamen assign to Jon per LYoder
🔧Work Performed
Performed annual inspection.
🔍Technician Findings
All units working upon arrival.
⚠️Problem Description
Annual Equipment Electrical Safety Test And Calibration Service
Equipment: 22
https://www.ebiotrack.com/inspection.php?iid=30157
Inspection Flag: ATTENTION TECHS, ASC'S AND MATERIALS MANAGEMENT.
DO NOT SHIP PARTS TO ANY CROSSOVER SITES. ALL PARTS FOR THIS ACCOUNT MUST BE SHIPPED DIRECTLY TO THE TECH. THE SITE WILL LOSE THE SHIPMENT IF SENT TO THEM.
📅
WO-01304886 - Inspection - Minot - Crossover Health Medical Group - Minot clinic
Nov 19, 2025 8:30am – 4:30pm
Work Order: WO-01304886
Account: Crossover Health Management Services
Customer Case Number:
Location: Crossover Health Medical Group - Minot clinic
Address: 2305 37th Ave SW, Minot, ND 58701
Manufacturer:
Model #:
Serial #:
Contact Name: Practice Manager
Contact Phone:
Contact Email: facilities
Timeline
📞
Case Linked Sep 17, 7:01 AM
Case Number:00527847
Subject:eBiotrack - Automated New Inspection Created
Status:Closed
📋
▶
2
Work Order Created Sep 17, 11:24 AM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Shelby Robinson
From:Entered
To:Ready for Scheduling
Duration in Previous:0m
⏳2.0 business days
👷
▶
2
Technician Assigned Sep 18, 2:31 PM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Charles Ramen
From:Ready for Scheduling
To:Assigned
Duration in Previous:1d 3h
🚨33.0 business days
🗓️
▶
2
Status: Scheduled Nov 4, 5:48 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Jonathan Kuehl
Scheduled For:2025-11-25T15:00:00.000+0000
📅
Dispatch Scheduled by Jonathan KuehlNov 5, 5:03 PM
Scheduled For:2025-11-19T13:00:00.000+0000
⚠️5.9 business days
📅
Dispatch Scheduled by Charles RamenNov 13, 3:54 PM
Scheduled For:2025-11-19T13:30:00.000+0000
⚠️5.0 business days
🔧
Status: Tech On Site by Jonathan KuehlNov 19, 9:04 AM
From:Scheduled
To:Tech On Site
Duration in Previous:14d 15h
🚗
Status: Tech Off Site by Jonathan KuehlNov 19, 11:39 AM