Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Oct 31, 2025
✓ SLA Met
🕐 Clock stopped: Completed (Oct 31, 2025)
▶ Clock Running
Status: Created
Sep 18 → Sep 18, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Sep 18 → Sep 18, 2025
0 business days (counted)
Running total: 0 of ? biz days used
4d
▶ Clock Running
Status: Assigned
Sep 18 → Sep 24, 2025
4 business days (counted)
Running total: 4 of ? biz days used
26d
▶ Clock Running
Status: Scheduled
Sep 24 → Oct 31, 2025
26 business days (counted)
Running total: 30 of ? biz days used
▶ Clock Running
Status: Tech On Site
Oct 31 → Oct 31, 2025
0 business days (counted)
Running total: 30 of ? biz days used
Created: Sep 18, 2025
Completed: Oct 31, 2025
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Sep 18 → Sep 18
Created
▶ Running
0
0
Sep 18 → Sep 18
Ready for Scheduling
▶ Running
0
0
Sep 18 → Sep 24
Assigned
▶ Running
4
4
Sep 24 → Oct 31
Scheduled
▶ Running
26
30
Oct 31 → Oct 31
Tech On Site
▶ Running
0
30
Coordinators
31.2 days
Over SLA
Billing
5.3 days
Over SLA
Created: Sep 18, 2025
Due: Oct 31, 2025
Completed: Oct 31, 2025 (on time)
⏱️
26.8d in Scheduled
Longest Stage
🔄
8 transitions
Status Changes
⚠️
33.0d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00528650
6007998765
Closed
15K
SYS-LC-1290
Contract ends 07/31/2026 includes Repair
PM
PM only - customer supplies the UV lamp
G4212A
DE00800908 1290 Infinity Diode-Array Detector
G4220A
DEBAA04313 1290 Infinity Binary Pump
G1316C
DEBAC08295 1290 Thermostatted Column Compartment
G1330B-B
DE60557313 1200 Cooled Thermostatted ALS
G7167B
DEBAQ03795 1290 Infinity II Multisampler
Contact
Diana Hernandez Guerrero
🚨
Primary Delay
26.8 days stuck in "Scheduled"
⏱️
Total Delay
33.0 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
26.8d
/ 2.0d SLA
Tech On Site
0.9d
/ 1.0d SLA
Completed
0.1d
/ 1.0d SLA
Ready to Bill
5.3d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (6)
📅 Events (1)
🔒
Internal CSA Notes
Please assign to Jared Rappaport ARP to site is 17 miles. Zone 1
10/28/2025 JR Per text messages from Diana Hernandez Guerrero, the customer requested to reschedule the service date from October 28 to October 31.
🔧
Work Performed
Agilent HPLC PM completed as per Agilent protocol: HPLC Products Standard Preventative Maintenance Service Checklist
🔍
Technician Findings
As found, intensity test failed. Replaced and calibrated lamp (Agilent p/n 5190-0917, Deuterium Lamp 8-pin with RFID) per site agreement allowing one lamp replacement per year. After which intensity test passed.
JR 31-Oct-2025
Per Agilent IKB, classic pump heads can be upgraded to EM pump heads. System has seal wash. Installed EM pump heads (listed in pump parts section) and 8 new pump head screws (Agilent p/n 0515-6154, Screw-Socket-HD-Cap Hex-Recess M5×0.8×40), which are not included in the standard parts list.
JR 31-Oct-2025
Note that TBD parts listed in service max are G4220-60310 x1 and 0515-6154 x8.
As left, all required tests passed Agilent specifications.
⚠️
Problem Description
15K
SYS-LC-1290
Contract ends 07/31/2026 includes Repair
PM
PM only - customer supplies the UV lamp
G4212A
DE00800908 1290 Infinity Diode-Array Detector
G4220A
DEBAA04313 1290 Infinity Binary Pump
G1316C
DEBAC08295 1290 Thermostatted Column Compartment
G1330B-B
DE60557313 1200 Cooled Thermostatted ALS
G7167B
DEBAQ03795 1290 Infinity II Multisampler
📄
Description
1290 Infinity Binary Pump
📞
Call Description
OCT 2025 LC PM
📅
WO-01305246 - Preventive Maintenance - G4220A - Thousand Oaks - Amgen Inc
Oct 31, 2025 11:00am – 7:00pm
Work Order: WO-01305246
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6007998765
Location: Amgen Inc
Address: 1 Amgen Center Dr, Thousand Oaks, CA 91320
Manufacturer:
Model #: G4220A
Serial #: DEBAA04313
Contact Name: Diana Hernandez Guerrero
Contact Phone: 8055149618
Contact Email: dhe
Timeline
📞
📋
Work Order:
WO-01305246
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
Jared Rappaport
🗓️
📅
Scheduled For:
2025-10-28T15:00:00.000+0000
📅
Scheduled For:
2025-10-31T15:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
36d 21h
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
0.5, 17
🔩
⏱️
Type:
Labor
Status:
Open
Qty:
3.5
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
7h 5m
⏱️
🏁
From:
Completed
To:
Closed
Duration in Previous:
59m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
2d 22h
📨
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
1m
🧾
Invoice Number:
SM-246148
Bottlenecks
Assigned
Duration: 4.4 business days (threshold: 4.0 business hours)
Exceeded by 3.9 business days
Scheduled
Duration: 26.8 business days (threshold: 2.0 business days)
Exceeded by 24.8 business days
Closed
Duration: 1.1 business days (threshold: 1.0 business days)
Exceeded by 0.8 business hours
Ready to Bill
Duration: 5.3 business days (threshold: 1.0 business days)
Exceeded by 4.3 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Technician
Jared Rappaport
Scheduled
Oct 31, 11:00 AM
Work Details (14)
Name
Type
Status
Qty
Amount
Date
WL-02991574
Labor
Open
0.5
$0.00
Oct 31, 11:41 AM
WL-02991575
Travel
Open
17
$0.00
Oct 31, 11:41 AM
WL-02992349
Parts
Open
1
$0.00
Oct 31, 6:10 PM
WL-02992350
Parts
Open
1
$0.00
Oct 31, 6:10 PM
WL-02992351
Parts
Open
1
$0.00
Oct 31, 6:10 PM
WL-02992352
Parts
Open
1
$0.00
Oct 31, 6:10 PM
WL-02992353
Parts
Open
1
$0.00
Oct 31, 6:10 PM
WL-02992354
Parts
Open
8
$0.00
Oct 31, 6:10 PM
WL-02992355
Parts
Open
1
$0.00
Oct 31, 6:10 PM
WL-02992356
Parts
Open
1
$0.00
Oct 31, 6:10 PM
WL-02992360
Labor
Open
3.5
$520.00
Oct 31, 6:12 PM
WL-02992361
Labor
Open
3
$0.00
Oct 31, 6:12 PM
WL-02992502
Labor
Open
0.66666666666667
$0.00
Oct 31, 7:13 PM
WL-02992503
Travel
Open
17
$0.00
Oct 31, 7:13 PM