Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Dec 31, 2025
✓ SLA Met (25 biz days early)
🕐 Clock stopped: Completed (Nov 23, 2025)
▶ Clock Running
Status: Created
Sep 23 → Sep 23, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Sep 23 → Sep 23, 2025
0 business days (counted)
Running total: 0 of ? biz days used
39d
▶ Clock Running
Status: Assigned
Sep 23 → Nov 19, 2025
39 business days (counted)
Running total: 39 of ? biz days used
▶ Clock Running
Status: Scheduled
Nov 19 → Nov 21, 2025
2 business days (counted)
Running total: 41 of ? biz days used
▶ Clock Running
Status: Tech On Site
Nov 21 → Nov 23, 2025
0 business days (counted)
Running total: 41 of ? biz days used
Created: Sep 23, 2025
Completed: Nov 23, 2025
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Sep 23 → Sep 23
Created
▶ Running
0
0
Sep 23 → Sep 23
Ready for Scheduling
▶ Running
0
0
Sep 23 → Nov 19
Assigned
▶ Running
39
39
Nov 19 → Nov 21
Scheduled
▶ Running
2
41
Nov 21 → Nov 23
Tech On Site
▶ Running
0
41
Coordinators
41.3 days
Over SLA
Billing
8.2 days
Over SLA
Created: Sep 23, 2025
Due: Dec 31, 2025
Completed: Nov 23, 2025 (38 days early)
⏱️
39.1d in Assigned
Longest Stage
🔄
7 transitions
Status Changes
⚠️
46.0d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00529563
6008058252
Closed
28U
SYS-GC-6890N
Contract ends 12/31/2025 includes Repair
PM / EOQ
G2614A
CN51632890 7683 Autosampler tray module
G1530N
US10249083 6890N Network GC System
G2613A
CN13621939 7683 Autoinjector module
🚨
Primary Delay
39.1 days stuck in "Assigned"
⏱️
Total Delay
46.0 business days over SLA thresholds
SLA vs Actual Time by Status
Assigned
39.1d
/ 0.5d SLA
Scheduled
2.3d
/ 2.0d SLA
Tech On Site
1.0d
/ 1.0d SLA
Ready to Bill
8.2d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📅 Events (1)
🔒
Internal CSA Notes
11/20 Google map was used to calculate zone and travel returning to home. MD
Please assign to Maria Davis ARP to site is 151 miles. Zone 4
🔧
Work Performed
11/20/2025 EEOQ GC session ACE 3.x was created, columns were installed and started. Data acquisition is Empower, Work laptop with OpenLAB CDS Chemmstaion C.01.10 was used to run the tests. EEOQ was completed per Agilent checklist. GC was off for weeks and take longer to get the FIDs base line to stabilized. Data was reviewed with customer and GC is working with Empower. after EEOQ ALL tests passed.
⚠️
Problem Description
28U
SYS-GC-6890N
Contract ends 12/31/2025 includes Repair
PM / EOQ
G2614A
CN51632890 7683 Autosampler tray module
G1530N
US10249083 6890N Network GC System
G2613A
CN13621939 7683 Autoinjector module
📄
Description
GC 6890N System
📞
Call Description
DEC 2025 GC EOQ
📅
WO-01305710 - EOQ - SYS-GC-6890N - Waco - Allergan Inc
Nov 21, 2025 9:00am – 6:00pm
Work Order: WO-01305710
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008058252
Location: Allergan Inc
Address: 8301 Mars Dr, Waco, TX 76712
Manufacturer:
Model #: SYS-GC-6890N
Serial #: S-ALLE-GC-26484717404
Contact Name: Erika Moya
Contact Phone: 254-666-8621
Contact Email: erika.moy
Timeline
📞
📋
Work Order:
WO-01305710
Type:
EOQ
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
🗓️
📅
Scheduled For:
2025-11-21T14:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
2d 1h
⏱️
💵
Type:
Expenses
Status:
Open
Qty:
1
✔️
From:
Tech On Site, Completed
To:
Completed, Closed
Duration in Previous:
2d 16h, 0m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
1d 4h
📨
🧾
Invoice Number:
SM-248486
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
3m
Bottlenecks
Assigned
Duration: 39.1 business days (threshold: 4.0 business hours)
Exceeded by 38.6 business days
Scheduled
Duration: 2.3 business days (threshold: 2.0 business days)
Exceeded by 2.0 business hours
Ready to Bill
Duration: 8.2 business days (threshold: 1.0 business days)
Exceeded by 7.2 business days
ℹ️ Work Order Details
Scheduled
Nov 21, 9:00 AM
Work Details (6)
Name
Type
Status
Qty
Amount
Date
WL-03017679
Labor
Open
1
$0.00
Nov 23, 1:23 PM
WL-03017680
Labor
Open
9
$684.00
Nov 23, 1:23 PM
WL-03017681
Labor
Open
5
$0.00
Nov 23, 1:23 PM
WL-03017682
Travel
Open
5
$180.00
Nov 23, 1:23 PM
WL-03017683
Travel
Open
151
$0.00
Nov 23, 1:23 PM
WL-03017684
Expenses
Open
1
$0.00
Nov 23, 1:26 PM