Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Dec 31, 2025
✓ SLA Met (14 biz days early)
🕐 Clock stopped: Tech Off Site (Dec 10, 2025)
▶ Clock Running
Status: Created
Sep 23 → Sep 23, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Sep 23 → Sep 23, 2025
0 business days (counted)
Running total: 0 of ? biz days used
45d
▶ Clock Running
Status: Assigned
Sep 23 → Dec 1, 2025
45 business days (counted)
Running total: 45 of ? biz days used
6d
▶ Clock Running
Status: Scheduled
Dec 1 → Dec 9, 2025
6 business days (counted)
Running total: 51 of ? biz days used
▶ Clock Running
Status: Tech On Site
Dec 9 → Dec 10, 2025
1 business day (counted)
Running total: 52 of ? biz days used
Created: Sep 23, 2025
Tech Off Site: Dec 10, 2025
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Sep 23 → Sep 23
Created
▶ Running
0
0
Sep 23 → Sep 23
Ready for Scheduling
▶ Running
0
0
Sep 23 → Dec 1
Assigned
▶ Running
45
45
Dec 1 → Dec 9
Scheduled
▶ Running
6
51
Dec 9 → Dec 10
Tech On Site
▶ Running
1
52
Coordinators
52.4 days
Over SLA
Field Work
4.4 days
Over SLA
Billing
6.6 days
Over SLA
Created: Sep 23, 2025
Due: Dec 31, 2025
Completed: Dec 12, 2025 (19 days early)
⏱️
45.4d in Assigned
Longest Stage
🔄
9 transitions
Status Changes
⚠️
56.9d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00529830
6008016201
Closed
14W
SYS-LC-1260II
Contract ends 01/31/2026 includes Repair
ENHPM / EOQ
Enhance PM -, the lamp is automatically changed at time of PM service with no questions. Have techs just order a lamp for an Enhanced PM.
G7111B
DEAET03460 1260 Infinity II Quaternary Pump
G7116A
DEAEM09362 1260 Infinity II Multicolumn Thermostat
G7114A
DEACX26188 1260 Infinity II VW Detector
G7129A
DEAEQ47099 1260 Infinity II Vialsampler
🚨
Primary Delay
45.4 days stuck in "Assigned"
⏱️
Total Delay
56.9 business days over SLA thresholds
SLA vs Actual Time by Status
Assigned
45.4d
/ 0.5d SLA
Scheduled
7.0d
/ 2.0d SLA
Tech On Site
2.0d
/ 1.0d SLA
Tech Off Site
2.4d
/ 2.0d SLA
Completed
0.0d
/ 1.0d SLA
Ready to Bill
6.6d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📅 Events (1)
📎 Files (1)
🔒
Internal CSA Notes
12/11 Part still can't be added, WO will be closed is SM and SO will be closed in mService. MD
12/09/2025 Google map was used to calculate zone. An email was sent to add parts G1314-67188 in SM. A repair SO 6008276703. was opened. MD
Please assign to Maria Davis ARP to site is 42 miles. Zone 1
🔧
Work Performed
12/09/2025 ACE Enhance PM session was created. Pm was completed per Agilent. System was flushed thoroughly with H2O. New lamp was installed and calibrated, stabilized for some time. Intensity, dark current, filter, cell test but Holmium passed.
⚠️
Problem Description
14W
SYS-LC-1260II
Contract ends 01/31/2026 includes Repair
ENHPM / EOQ
Enhance PM -, the lamp is automatically changed at time of PM service with no questions. Have techs just order a lamp for an Enhanced PM.
G7111B
DEAET03460 1260 Infinity II Quaternary Pump
G7116A
DEAEM09362 1260 Infinity II Multicolumn Thermostat
G7114A
DEACX26188 1260 Infinity II VW Detector
G7129A
DEAEQ47099 1260 Infinity II Vialsampler
📄
Description
1260 Infinity II Quaternary Pump
📞
Call Description
DEC 2025 LC EHNPM
📅
WO-01305894 - Preventive Maintenance - G7111B - Garland - Ecolab Inc
Dec 9, 2025 11:00am – 4:00pm
Work Order: WO-01305894
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008016201
Location: Ecolab Inc
Address: 2305 Sherwin St, Garland, TX 75041
Manufacturer:
Model #: G7111B
Serial #: DEAET03460
Contact Name: Jorge Zablah
Contact Phone: 972-864-3842
Contact Email: jorge.zablah@ecolab.
MSG
Please add part in SM - SO 6008016201
Dec 10, 2025
Timeline
📞
📋
Work Order:
WO-01305894
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
1m, 0m
👷
Technician:
a0hF00000028i6gIAA, Maria Davis
🗓️
📅
Scheduled For:
2025-12-16T16:00:00.000+0000
📅
Scheduled For:
2025-12-09T16:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
8d 4h
🚗
From:
Tech On Site
To:
Tech Off Site
Duration in Previous:
23h 43m
⏱️
Type:
Labor, Travel, Parts
Status:
Open
Qty:
2, 41, 42
⏱️
Type:
Labor
Status:
Open
Qty:
5
✔️
From:
Tech Off Site
To:
Completed
Duration in Previous:
1d 12h
🏁
From:
Completed
To:
Closed
Duration in Previous:
10m
🔩
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
15h 54m
📨
🧾
Invoice Number:
SM-249754
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
3m
Bottlenecks
Assigned
Duration: 45.4 business days (threshold: 4.0 business hours)
Exceeded by 44.9 business days
Scheduled
Duration: 7.0 business days (threshold: 2.0 business days)
Exceeded by 5.0 business days
Tech On Site
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Tech Off Site
Duration: 2.4 business days (threshold: 2.0 business days)
Exceeded by 3.3 business hours
Ready to Bill
Duration: 6.6 business days (threshold: 1.0 business days)
Exceeded by 5.6 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Dec 9, 11:00 AM
Work Details (15)
Name
Type
Status
Qty
Amount
Date
WL-03033756
Labor
Open
2
$0.00
Dec 10, 10:58 PM
WL-03033758
Labor
Open
2
$0.00
Dec 10, 10:58 PM
WL-03033759
Travel
Open
41
$180.00
Dec 10, 10:58 PM
WL-03033760
Travel
Open
42
$0.00
Dec 10, 10:58 PM
WL-03033761
Parts
Open
1
$0.00
Dec 10, 10:58 PM
WL-03033762
Parts
Open
1
$0.00
Dec 10, 10:58 PM
WL-03033763
Parts
Open
4
$0.00
Dec 10, 10:58 PM
WL-03033764
Parts
Open
4
$0.00
Dec 10, 10:58 PM
WL-03033765
Parts
Open
2
$0.00
Dec 10, 10:58 PM
WL-03033766
Parts
Open
1
$0.00
Dec 10, 10:58 PM
WL-03033767
Parts
Open
1
$0.00
Dec 10, 10:58 PM
WL-03033768
Parts
Open
1
$0.00
Dec 10, 10:58 PM
WL-03033769
Parts
Open
1
$0.00
Dec 10, 10:58 PM
WL-03035193
Labor
Open
5
$570.00
Dec 11, 9:32 PM
WL-03036056
Parts
Open
1
$0.00
Dec 12, 2:18 PM