Primary Delay3.0 days stuck in "07e-Partial Project"
⏱️
Total Delay2.3 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
1.4d / 0.5d SLA
Scheduled
1.0d / 2.0d SLA
Tech On Site
0.3d / 1.0d SLA
Closed
2.0d / 1.0d SLA
07e-Partial Project
3.0d
Ready to Bill
1.4d / 1.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
V60/V60 Plus Ventilator - NRTL Labeling Change to Remove CSA Mark (US, US Territories and Canada)
🔍Technician Findings
V60/V60 Plus Ventilator - NRTL Labeling Change to Remove CSA Mark (US, US Territories and Canada)
⚠️Problem Description
V60/V60 Plus Ventilator - NRTL Labeling Change to Remove CSA Mark (US, US Territories and Canada)
📄Description
V60 Ventilator
📞Call Description
FCO86600069
📋
0-0-0
Completed Nov 13, 2025
ANR ONLY
Tech Supervisor Spot Check
# of Critical Defects: 0
# of Major Defects: 0
# of Minor Defects: 0
# of EMSAR Defects: 0
FCO 69
i. Tools: Multimeter, electrical safety analyzer & Torque Screwdriver. -YES
ii. Prontoforms – uploaded and correct template -YES
iii. DRPTA – uploaded -YES
iv. CSR – signed and uploaded to ServiceMax- YES
v. Part- Appropriate parts per device and quantity (each IP debriefed should have a part consumed) -YES
vi. EMSAR Requirements (do not inclu
Sep 25, 2025 4:55pm
Hi, @Erin Martin. This is the FCO69 work order requested per the below.