Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Sep 30, 2025
✓ SLA Met (1 biz days early)
🕐 Clock stopped: Tech Off Site (Sep 29, 2025)
▶ Clock Running
Status: Created
Sep 26 → Sep 26, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Sep 26 → Sep 26, 2025
0 business days (counted)
Running total: 0 of ? biz days used
0d
▶ Clock Running
Status: Assigned
Sep 26 → Sep 28, 2025
0 business days (counted)
Running total: 0 of ? biz days used
1d
▶ Clock Running
Status: Scheduled
Sep 28 → Sep 29, 2025
1 business day (counted)
Running total: 1 of ? biz days used
Created: Sep 26, 2025
Tech Off Site: Sep 29, 2025
Show SLA Clock Detail (4 periods)
Period
Status
Clock
Biz Days
Running Total
Sep 26 → Sep 26
Created
▶ Running
0
0
Sep 26 → Sep 26
Ready for Scheduling
▶ Running
0
0
Sep 26 → Sep 28
Assigned
▶ Running
0
0
Sep 28 → Sep 29
Scheduled
▶ Running
1
1
Billing
6.8 days
Over SLA
Created: Sep 26, 2025
Due: Sep 30, 2025
Completed: Sep 30, 2025 (on time)
⏱️
3.5d in Ready to Bill
Longest Stage
🔄
10 transitions
Status Changes
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
👤 Self-scheduled by Jose Gutierrez — scheduling delays attributed to technician, not coordinators
Visit 1
Sep 28, 2025
Visit 2
Sep 29, 2025
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00530876
6008105843
Closed
28U
SYS-GC-8890-E
Repair
issues with the 7697A headspace
🚨
Primary Delay
3.5 days stuck in "Ready to Bill"
⏱️
Total Delay
3.5 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
1.0d
/ 2.0d SLA
Tech Off Site
1.1d
/ 2.0d SLA
Completed
0.0d
/ 1.0d SLA
Ready to Bill
5.5d
/ 1.0d SLA
Billing Review
0.0d
/ 2.0d SLA
Invoice Pending
1.2d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📅 Events (1)
🔒
Internal CSA Notes
Please assign to Jose Gutierrez
ARP to site is 200 miles. Zone 4
🔧
Work Performed
Customer described issues with the headspace gripper, tray error code #334. Attempted to run both normal and factory tray calibrations. However, both failed and gave the same error code. Upon removing gripper assembly, did not notice any visible issues in the cabling or on the hardware itself. Replaced the gripper assembly and executed both factory and normal tray calibrations. Afterward, used the manual tray operations under tray diagnostics to manually move vials to different tray positions. Tray gripper was now operating as expected.
⚠️
Problem Description
28U
SYS-GC-8890-E
Repair
issues with the 7697A headspace
📄
Description
7697A Headspace Sampler, 111
📞
Call Description
SEP 2025 GC REPAIR
📅
WO-01306529 - Repair - G4557A - San Angelo - Ethicon Inc
Sep 29, 2025 10:00am – 1:00pm
Work Order: WO-01306529
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008105843
Location: Ethicon Inc
Address: 3348 Pulliam St, San Angelo, TX 76905
Manufacturer:
Model #: G4557A
Serial #: US20420005
Contact Name:
Contact Phone:
Contact Email:
Due Date: 9/30/2025
Scheduled Date/Time
Timeline
📞
📋
Work Order:
WO-01306529
Type:
Repair
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
Jose Gutierrez
🗓️
📅
Scheduled For:
2025-09-29T14:00:00.000+0000
💵
⏱️
Type:
Labor
Status:
Open
Qty:
3
🚗
From:
Scheduled
To:
Tech Off Site
Duration in Previous:
1d 12h
⏱️
💵
Type:
Expenses, Travel
Status:
Open
Qty:
1, 209, 5
🔩
Type:
Parts
Status:
Open
Qty:
1
✔️
From:
Tech Off Site
To:
Completed
Duration in Previous:
8h 28m
🏁
From:
Completed
To:
Closed
Duration in Previous:
3m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
17h 54m
💵
📄
From:
Billing Review
To:
Ready to Bill
Duration in Previous:
1m
📨
From:
Ready to Bill
To:
Invoice Pending
Duration in Previous:
3d 8h
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
19h 47m
🧾
Invoice Number:
SM-243053
Bottlenecks
Ready to Bill
Duration: 3.5 business days (threshold: 1.0 business days)
Exceeded by 2.5 business days
Ready to Bill
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
ℹ️ Work Order Details
Technician
Jose Gutierrez
Scheduled
Sep 29, 10:00 AM
Work Details (12)
Name
Type
Status
Qty
Amount
Date
WL-02952534
Expenses
Open
1
$0.00
Sep 28, 11:55 PM
WL-02952535
Expenses
Open
1
$225.00
Sep 28, 11:55 PM
WL-02952536
Expenses
Open
1
$0.00
Sep 28, 11:55 PM
WL-02952537
Travel
Open
205
$1,077.00
Sep 28, 11:56 PM
WL-02952538
Labor
Open
3
$0.00
Sep 28, 11:57 PM
WL-02953861
Labor
Open
1.75
$193.80
Sep 29, 9:37 PM
WL-02953862
Labor
Open
3.5
$0.00
Sep 29, 9:37 PM
WL-02953860
Labor
Open
0.16666666666667
$0.00
Sep 29, 9:37 PM
WL-02953863
Expenses
Open
1
$0.00
Sep 29, 9:38 PM
WL-02953868
Travel
Open
209
$0.00
Sep 29, 9:38 PM
WL-02953867
Travel
Open
5
$180.00
Sep 29, 9:38 PM
WL-02953869
Parts
Open
1
$0.00
Sep 29, 9:39 PM