Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Dec 31, 2025
✓ SLA Met (15 biz days early)
🕐 Clock stopped: Tech Off Site (Dec 9, 2025)
▶ Clock Running
Status: Created
Sep 29 → Sep 29, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Sep 29 → Sep 29, 2025
0 business days (counted)
Running total: 0 of ? biz days used
39d
▶ Clock Running
Status: Assigned
Sep 29 → Nov 25, 2025
39 business days (counted)
Running total: 39 of ? biz days used
7d
▶ Clock Running
Status: Scheduled
Nov 25 → Dec 8, 2025
7 business days (counted)
Running total: 46 of ? biz days used
▶ Clock Running
Status: Tech On Site
Dec 8 → Dec 9, 2025
1 business day (counted)
Running total: 47 of ? biz days used
Created: Sep 29, 2025
Tech Off Site: Dec 9, 2025
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Sep 29 → Sep 29
Created
▶ Running
0
0
Sep 29 → Sep 29
Ready for Scheduling
▶ Running
0
0
Sep 29 → Nov 25
Assigned
▶ Running
39
39
Nov 25 → Dec 8
Scheduled
▶ Running
7
46
Dec 8 → Dec 9
Tech On Site
▶ Running
1
47
Coordinators
47.4 days
Over SLA
Billing
9.4 days
Over SLA
Created: Sep 29, 2025
Due: Dec 31, 2025
Completed: Dec 9, 2025 (22 days early)
⏱️
39.4d in Assigned
Longest Stage
🔄
9 transitions
Status Changes
⚠️
53.3d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00529979
waiting on product to be built - 6007988790
Closed
28R
SYS-GC-6890N
Contract ends 04/30/2026 includes Repair
PM
G1530NR
CN10745025 Agilent Cert. Pre-owned 6890N GC
G1562A
23MJY FID w/EPC, for capillary only
G2613A
US10117019 7683 Autoinjector module
🚨
Primary Delay
39.4 days stuck in "Assigned"
⏱️
Total Delay
53.3 business days over SLA thresholds
SLA vs Actual Time by Status
Assigned
39.4d
/ 0.5d SLA
Scheduled
8.0d
/ 2.0d SLA
Tech On Site
0.9d
/ 1.0d SLA
Tech Off Site
0.2d
/ 2.0d SLA
Completed
0.0d
/ 1.0d SLA
Ready to Bill
9.4d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📅 Events (1)
🔒
Internal CSA Notes
12/08 Google map was used to calculate zone. MD
Please assign to Maria Davis ARP to site is 73 miles. Zone 2
🔧
Work Performed
12/08/2025 GC temperatures were cool down. PM was completed per Agilent. At arrival the FID back signal was high and stay there. Parts were replaced, columns re-installed, inlet and detectors were turned on. Front FID signal lighted on and stabilized, Back FID tried to light on but due signal to high stay off. A repair SO 6008274082 was logging.
⚠️
Problem Description
28R
SYS-GC-6890N
Contract ends 04/30/2026 includes Repair
PM
G1530NR
CN10745025 Agilent Cert. Pre-owned 6890N GC
G1562A
23MJY FID w/EPC, for capillary only
G2613A
US10117019 7683 Autoinjector module
📄
Description
Agilent - G1530NR - Certified Pre-owned 6890N GC
📞
Call Description
DEC 2025 GC PM
📅
WO-01306753 - Preventive Maintenance - G1530NR - Arlington - Armstrong Forensic Laboratory Inc
Dec 8, 2025 12:00pm – 3:00pm
Work Order: WO-01306753
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6007988790
Location: Armstrong Forensic Laboratory Inc
Address: 330 Loch N Green Trl, Arlington, TX 76012
Manufacturer: Agilent
Model #: G1530NR
Serial #: CN10745025
Contact Name: Ben Armstrong
Contact Phone: 817275269
Timeline
📞
Case Number:
00529979
Subject:
waiting on product to be built - 6007988790
Status:
Closed
📋
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
🗓️
📅
Scheduled For:
2025-12-15T17:00:00.000+0000
📅
Scheduled For:
2025-12-08T17:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
13d 3h
🚗
From:
Tech On Site
To:
Tech Off Site
Duration in Previous:
7h 3m
⏱️
Type:
Labor, Travel, Parts
Status:
Open
Qty:
2.5, 3, 83
✔️
From:
Tech Off Site
To:
Completed
Duration in Previous:
1h 27m
🏁
From:
Completed
To:
Closed
Duration in Previous:
5m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
18h 43m
📨
🧾
Invoice Number:
SM-249754
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
3m
Bottlenecks
Assigned
Duration: 39.4 business days (threshold: 4.0 business hours)
Exceeded by 38.9 business days
Scheduled
Duration: 8.0 business days (threshold: 2.0 business days)
Exceeded by 6.0 business days
Ready to Bill
Duration: 9.4 business days (threshold: 1.0 business days)
Exceeded by 8.4 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Dec 8, 12:00 PM
Work Details (8)
Name
Type
Status
Qty
Amount
Date
WL-03030745
Labor
Open
2.5
$0.00
Dec 8, 7:32 PM
WL-03030746
Labor
Open
3
$285.00
Dec 8, 7:32 PM
WL-03030747
Labor
Open
2.5
$0.00
Dec 8, 7:32 PM
WL-03030748
Travel
Open
83
$359.00
Dec 8, 7:32 PM
WL-03030749
Travel
Open
83
$0.00
Dec 8, 7:32 PM
WL-03030750
Parts
Open
2
$0.00
Dec 8, 7:32 PM
WL-03030751
Parts
Open
2
$0.00
Dec 8, 7:32 PM
WL-03030752
Parts
Open
2
$0.00
Dec 8, 7:32 PM