Primary Delay4.0 days stuck in "07e-Partial Project"
⏱️
Total Delay0.7 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
0.0d / 0.5d SLA
Scheduled
1.0d / 2.0d SLA
Closed
2.0d / 1.0d SLA
07e-Partial Project
6.9d
WO Correction Needed
1.6d
Ready to Bill
1.7d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
FMessak- 10-18-2025- this is a corrective maintenance WO , nothing is wrong with the WO.
10/10/2025 Cever dispatched to FSE per Request
🔧Work Performed
The FSE installed a new RP-Trilogy Evo 3 Way Solenoid Valve and RP-Trilogy Evo Proportional Valve (AECM), Performed a complete PVT as per the MFG's specifications. All tests and calibrations were found to be in spec or passed tests.Device placed back into full clinical service; ready for patient use.
🔍Technician Findings
Repair.
⚠️Problem Description
FCO86600081 Follow-up Repair – ASP EMSAR to handle.