Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Nov 4, 2025
✗ SLA Missed (29 biz days late)
🕐 Clock stopped: Completed (Dec 18, 2025)
▶ Clock Running
Status: Created
Oct 21 → Oct 22, 2025
1 business day (counted)
Running total: 1 of ? biz days used
4d
▶ Clock Running
Status: Assigned
Oct 22 → Oct 28, 2025
4 business days (counted)
Running total: 5 of ? biz days used
34d
▶ Clock Running
Status: Scheduled
Oct 28 → Dec 18, 2025
34 business days (counted)
Running total: 39 of ? biz days used
Created: Oct 21, 2025
Completed: Dec 18, 2025
Show SLA Clock Detail (3 periods)
Period
Status
Clock
Biz Days
Running Total
Oct 21 → Oct 22
Created
▶ Running
1
1
Oct 22 → Oct 28
Assigned
▶ Running
4
5
Oct 28 → Dec 18
Scheduled
▶ Running
34
39
Dispatch
1.4 days
Over SLA
Coordinators
39.5 days
Over SLA
Billing
1.5 days
Over SLA
Created: Oct 21, 2025
Due: Nov 4, 2025
Completed: Dec 18, 2025 (43 days late)
⏱️
34.5d in Scheduled
Longest Stage
🔄
7 transitions
Status Changes
⚠️
38.3d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
Visit 1
Dec 16, 2025
Visit 2
Dec 17, 2025
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00537267
URGENT Philips WO Request
Closed
Device failed preliminary Tests (System Setup) SN: H2834921638CC
AECM Verification: Reading 30.15 cmH2O LSL 25.50 USL 28.50 FAIL
AECM Verification: Reading 20.05 cmH2O LSL -1.50 USL 1.50 FAIL
🚨
Primary Delay
34.5 days stuck in "Scheduled"
⏱️
Total Delay
38.3 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
34.5d
/ 2.0d SLA
Completed
1.0d
/ 1.0d SLA
Ready to Bill
1.5d
/ 1.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (6)
💬 Chatter (1)
📅 Events (1)
🔒
Internal CSA Notes
12/15/2025 RArnold - 12152025_BOUPDATE_ RP-Trilogy Evo Proportional Valve (AECM) on BO. ETA 12/19
12/08/2025 EMartin updating scheduled date per FSE request
12/04/2025 Cever moved to Dec 11th per FSE
10/28/2025 EMartin dispatching to FSE for continuation of repairs and FCO
INTERNAL NOTE: Quote has been accepted.
10/22/2025 EMartin FSE onsite working with Caleb on quotes and hard copy PO
🔧
Work Performed
12/16 - Travel to site. Met with POC. One of parts ordered had not yet been delivered. Waited a while for delivery, which did not happen by time Biomed closing the shop for the day. Travel from site to hotel. Will return 12/17. Weekly meeting with Fady & team.
12/17 - returned to site. Part had arrived. Replaced 3 way solenoid & Proportional Valve, Completed repair successfully.
🔍
Technician Findings
EV300 Repair
⚠️
Problem Description
Device failed preliminary Tests (System Setup) SN: H2834921638CC
AECM Verification: Reading 30.15 cmH2O LSL 25.50 USL 28.50 FAIL
AECM Verification: Reading 20.05 cmH2O LSL -1.50 USL 1.50 FAIL
📄
Description
Philips Trilogy EV300 Hospital Ventilator (DS2200X11B / 989805661881)
📞
Call Description
Repair - Trade
Oct 21, 2025 5:05pm
@Erin Martin Repair - Trade EV300
📅
WO-01310662 - Repair - Trilogy EV300 Vent - Kinston - UNC Lenoir Health Care, Kinston, NC
Dec 16, 2025 8:00am – 5:00pm
Work Order: WO-01310662
Account: PHILIPS HEALTHCARE
Customer Case Number: WO-13760594
Location: UNC Lenoir Health Care, Kinston, NC
Address: 100 Airport Rd, Kinston, NC 28501
Manufacturer: Philips Healthcare
Model #: Trilogy EV300 Vent
Serial #: H2834921638CC
Contact Name: Caleb Duranceau
Contact Ph
Timeline
📞
Case Number:
00537267
Subject:
URGENT Philips WO Request
Status:
Closed
📋
Work Order:
WO-01310662
Type:
Repair
Priority:
PC
👷
👷
From:
Entered
To:
Assigned
Duration in Previous:
16h 34m
🗓️
📅
Scheduled For:
2025-11-24T13:00:00.000+0000
📅
Scheduled For:
2025-12-03T13:00:00.000+0000
📅
Scheduled For:
2025-12-11T13:00:00.000+0000
📅
Scheduled For:
2025-12-17T13:00:00.000+0000
📅
Scheduled For:
2025-12-16T13:00:00.000+0000
⏱️
Type:
Labor
Status:
Open
Qty:
2.5, 1.5
⏱️
Type:
Labor
Status:
Open
Qty:
0.5, 1.5
✔️
From:
Scheduled
To:
Completed
Duration in Previous:
50d 12h
🚗
Type:
Travel
Status:
Open
Qty:
59
🏁
From:
Completed
To:
Closed
Duration in Previous:
10h 49m
⏱️
📋
From:
Closed
To:
07e-Partial Project
Duration in Previous:
50m
📄
From:
07e-Partial Project
To:
Ready to Bill
Duration in Previous:
4h 46m
💰
From:
Ready to Bill
To:
Invoiced
Duration in Previous:
12h 48m
Bottlenecks
Entered
Duration: 1.4 business days (threshold: 4.0 business hours)
Exceeded by 6.9 business hours
Assigned
Duration: 5.0 business days (threshold: 4.0 business hours)
Exceeded by 4.5 business days
Scheduled
Duration: 34.5 business days (threshold: 2.0 business days)
Exceeded by 32.5 business days
Ready to Bill
Duration: 1.5 business days (threshold: 1.0 business days)
Exceeded by 3.8 business hours
ℹ️ Work Order Details
Technician
Patricia Gordon
Scheduled
Dec 16, 8:00 AM
Work Details (8)
Name
Type
Status
Qty
Amount
Date
WL-03040365
Labor
Open
2.5
$0.00
Dec 17, 9:23 AM
WL-03040366
Labor
Open
1.5
$0.00
Dec 17, 9:23 AM
WL-03040367
Labor
Open
1
$0.00
Dec 17, 9:23 AM
WL-03040368
Labor
Open
2
$0.00
Dec 17, 9:23 AM
WL-03041312
Labor
Open
0.5
$155.00
Dec 17, 8:14 PM
WL-03041313
Labor
Open
1.5
$142.50
Dec 17, 8:14 PM
WL-03041674
Travel
Open
59
$0.00
Dec 18, 9:21 AM
WL-03041750
Labor
Open
0.016666666666667
$38.00
Dec 18, 10:22 AM