Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01311181 ↗ ServiceMax

Modern Animal Hospital • Virtual Tech - Field Repair • P3

📍 Modern Animal Clinic - Berk — 760 Hearst Ave, Berkeley CA, 94710

Oct 24, 2025 → Dec 22, 2025

✅ Completed
P3
SLA Clock
3 business days from creation · Target: Oct 29, 2025
✗ SLA Missed (10 biz days late)
Active: 13 biz days
Paused: 26 biz days
Budget: 3 biz days
🕐 Clock stopped: Completed (Dec 23, 2025)
SLA Target
▶ Clock Running
Status: Created
Oct 24 → Oct 24, 2025
0 business days (counted)
Running total: 0 of 3 biz days used
▶ Clock Running
Status: Ready for Scheduling
Oct 24 → Oct 24, 2025
0 business days (counted)
Running total: 0 of 3 biz days used
▶ Clock Running
Status: Assigned
Oct 24 → Oct 27, 2025
1 business day (counted)
Running total: 1 of 3 biz days used
▶ Clock Running
Status: Scheduled
Oct 27 → Oct 30, 2025
3 business days (counted)
Running total: 4 of 3 biz days used
▶ Clock Running
Status: Tech On Site
Oct 30 → Oct 30, 2025
0 business days (counted)
Running total: 4 of 3 biz days used
⏸26d
⏸ Clock Paused
Status: Awaiting Parts
Oct 30 → Dec 10, 2025
26 business days (not counted)
7d
▶ Clock Running
Status: Ready for Scheduling
Dec 10 → Dec 19, 2025
7 business days (counted)
Running total: 11 of 3 biz days used
▶ Clock Running
Status: Scheduled
Dec 19 → Dec 23, 2025
2 business days (counted)
Running total: 13 of 3 biz days used
▶ Clock Running
Status: Tech On Site
Dec 23 → Dec 23, 2025
0 business days (counted)
Running total: 13 of 3 biz days used
Created: Oct 24, 2025 Completed: Dec 23, 2025
Business Days Used 13 / 3
0 3d budget +10d over
Show SLA Clock Detail (9 periods)
Period Status Clock Biz Days Running Total
Oct 24 → Oct 24 Created ▶ Running 0 0 / 3
Oct 24 → Oct 24 Ready for Scheduling ▶ Running 0 0 / 3
Oct 24 → Oct 27 Assigned ▶ Running 1 1 / 3
Oct 27 → Oct 30 Scheduled ▶ Running 3 4 / 3
Oct 30 → Oct 30 Tech On Site ▶ Running 0 4 / 3
Oct 30 → Dec 10 Awaiting Parts ⏸ Paused 26
Dec 10 → Dec 19 Ready for Scheduling ▶ Running 7 11 / 3
Dec 19 → Dec 23 Scheduled ▶ Running 2 13 / 3
Dec 23 → Dec 23 Tech On Site ▶ Running 0 13 / 3
Dispatch 0.0d
Material Management 25.6d
Coordinators 15.4d
Field Work 0.9d
Billing 7.3d
✗ SLA Missed
Dispatch
0.0 days
Material Management
25.6 days
Over SLA
Coordinators
15.4 days
Over SLA
Field Work
0.9 days
Billing
7.3 days
Over SLA
Created: Oct 24, 2025 Due: Dec 19, 2025 Completed: Dec 23, 2025 (3 days late)
📅
39.6 days Total Age
⏱️
25.6d in Awaiting Parts Longest Stage
🔄
13 transitions Status Changes
⚠️
39.0d over Total Delay
📦
1 orders, 0 quotes Parts & Quotes
📝
13 lines Work Details
🏠
2 visits On-Site Trips
👤
Self-Scheduled Scheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
👤 Self-scheduled by Angel Rios — scheduling delays attributed to technician, not coordinators
Visit 1 Oct 30, 2025
Visit 2 Dec 22, 2025

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00538063
<no subject>
Closed
Anesthetic machine is not functioning. Inspiring CO2 readings were occurring, in addition, the oxygen consistently rises.
Priority
Standard
Origin
Email
Reason
New Case
Contact
Kylee Wong
Owner
Virtual Tech
Created
Oct 24, 2025
Work Orders from this Case (1)
WO-01311181 (current) Invoiced
Virtual Tech - Field Repair • Angel Rios
Created: Oct 24, 2025 • Closed: Dec 22, 2025
Completed with significant delays
Invoiced • 131 days old
🚨
Primary Delay 25.6 days stuck in "Awaiting Parts"
⏱️
Total Delay 39.0 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
8.4d / 1.0d SLA
Assigned
1.9d / 0.5d SLA
Scheduled
5.1d / 2.0d SLA
Tech On Site
0.5d / 1.0d SLA
Awaiting Parts
25.6d / 3.0d SLA
Completed
0.4d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
7.3d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

12-19 Mburris email from POC Kylee 12-22 2:30pm

12-19 Mburris email sent to POC looking for 12-22 2:30pm

12-19 Mburris LM on Vmail

12/16/2025 Sramen - updated due date based on parts.


10-27 Mburris tech is aready set to go to site

10-24 Mburris email sent to POC

🔧 Work Performed
10/30 Repaired the flowmeter control valve by reseating and securing the knob on the valve shaft, restoring proper operation. Performed a pressure leak test and confirmed the unit holds pressure with no leaks. Investigated customer concern regarding patient difficulty exhaling; found play in the APL (pop-off) valve knob and tightened the screw, confirmed valve opens and closes as expected. Consulted EMSAR L2 support, who suspect internal wear to the APL valve affecting proper gas elimination and recommended replacement. Note: Mounted working unit back on and tested for proper operation, verified there are no leaks present. 12/22 Replaced the APL valve and performed a low-pressure leak test. The unit passed with no signs of leaks. Per customer request, the unit was left mounted for testing. Informed the customer that vaporizer testing is not performed.
🔍 Technician Findings
10/30 Vetland - Landmark Asset #: 12945085 SN: 85910 Arrived on site and was directed to the anesthesia unit reported as not functioning. The unit was not mounted and was missing the CO₂ absorber canister. Retrieved a canister from another unit and mounted the machine to perform diagnostic testing and troubleshooting. Customer reported that the flowmeter remains open even when the control valve is fully closed. Customer also noted that the patient was unable to properly exhale and eliminate anesthetic gases and CO₂ through the breathing circuit. 12/22 The customer provided the part that was shipped by us. Mounted the anesthesia machine onto the dental exam table arm to perform the repair.
⚠️ Problem Description
Anesthetic machine is not functioning. Inspiring CO2 readings were occurring, in addition, the oxygen consistently rises. https://www.ebiotrack.com/workorder.php?wo=69219

Timeline

📞
Case Linked Oct 24, 8:40 AM
Case Number: 00538063
Subject: <no subject>
Status: Closed
📋
2 Work Order Created Oct 24, 9:25 AM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Derek Reynolds
From: Entered
To: Ready for Scheduling
Duration in Previous: 1m
👷
2 Technician Assigned Oct 24, 12:34 PM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Michael Burris
From: Ready for Scheduling
To: Assigned
Duration in Previous: 3h 7m
2.0 business days
📅
2 Dispatch Scheduled Oct 27, 2:22 PM
Dispatch Scheduled → Status: Scheduled
🗓️
Status: Scheduled by Michael Burris
From: Assigned
To: Scheduled
Duration in Previous: 3d 1h
4.0 business days
🔧
Status: Tech On Site by Angel Rios Oct 30, 2:26 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 3d 0h
⏱️
4 3x Labor Added Oct 30, 4:53 PM
3x Labor Added → Labor Added → Parts Requested → Status: Awaiting Parts
⏱️
Labor Added
Type: Labor
Status: Open
Qty: 2.75
📦
Parts Requested
Order: 00084514
Status: Closed
📦
Status: Awaiting Parts by Angel Rios
From: Tech On Site
To: Awaiting Parts
Duration in Previous: 2h 31m
⏱️
Labor Added Oct 30, 9:01 PM
Type: Labor
Status: Open
Qty: 2.75
4.4 business days
💵
Expenses Added Nov 5, 9:47 PM
Type: Expenses
Status: Open
Qty: 1
🚨 21.3 business days
📅
Status: Ready for Scheduling by Amy Greene Dec 9, 8:31 PM
From: Awaiting Parts
To: Ready for Scheduling
Duration in Previous: 40d 4h
🔩
2x Parts Added Dec 10, 9:18 AM
Type: Parts, Expenses
Status: Open
Qty: 1
⚠️ 8.0 business days
🗓️
2 Status: Scheduled Dec 19, 4:28 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Michael Burris
Scheduled For: 2025-12-22T22:30:00.000+0000
1.9 business days
🔧
Status: Tech On Site by Angel Rios Dec 22, 7:31 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 3d 3h
⏱️
Labor Added Dec 22, 8:35 PM
Type: Labor
Status: Open
Qty: 1.25
⏱️
2x Labor Added Dec 22, 8:55 PM
Type: Labor, Travel
Status: Open
Qty: 1.5, 26
✔️
Status: Completed by Angel Rios Dec 22, 9:01 PM
From: Tech On Site
To: Completed
Duration in Previous: 1h 29m
⏱️
2 2x Labor Added Dec 22, 11:54 PM
2x Labor Added → Status: Closed
🏁
Status: Closed by Angel Rios
From: Completed
To: Closed
Duration in Previous: 2h 53m
📄
Status: Ready to Bill by Diane Patton Dec 23, 4:54 PM
From: Closed
To: Ready to Bill
Duration in Previous: 16h 58m
⚠️ 7.9 business days
📨
2 Status: Invoice Pending Jan 5, 10:08 AM
Status: Invoice Pending → Status: Invoiced
💰
Status: Invoiced by Diane Patton
From: Invoice Pending
To: Invoiced
Duration in Previous: 2m
🧾
Invoice Created Jan 5, 1:54 PM
Invoice Number: SM-250455

Bottlenecks

Assigned
Duration: 1.9 business days (threshold: 4.0 business hours)
Exceeded by 1.4 business days
Scheduled
Duration: 3.7 business days (threshold: 2.0 business days)
Exceeded by 1.7 business days
Awaiting Parts
Duration: 25.6 business days (threshold: 3.0 business days)
Exceeded by 22.6 business days
Ready for Scheduling
Duration: 8.0 business days (threshold: 1.0 business days)
Exceeded by 7.0 business days
Ready to Bill
Duration: 7.3 business days (threshold: 1.0 business days)
Exceeded by 6.3 business days

🔗 Related Artifacts

📞
Case 00538063
Closed
📦
Parts Order 00084514
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
P3
Type
Virtual Tech - Field Repair
Branch
Edge
Technician
Angel Rios
Scheduled
Dec 22, 5:30 PM
Created
Oct 24, 9:25 AM
Invoice #
SM-250455

Work Details (13)

Name Type Status Qty Amount Date
WL-02990292 Labor Open 2.25 $0.00 Oct 30, 4:53 PM
WL-02990293 Travel Open 85 $275.00 Oct 30, 4:53 PM
WL-02990294 Travel Open 85 $0.00 Oct 30, 4:53 PM
WL-02990301 Labor Open 2.75 $327.25 Oct 30, 4:55 PM
WL-02990807 Labor Open 2.75 $0.00 Oct 30, 9:01 PM
WL-02997944 Expenses Open 1 $0.00 Nov 5, 9:47 PM
WL-03032587 Parts Open 1 $398.25 Dec 10, 9:18 AM
WL-03032588 Expenses Open 1 $13.38 Dec 10, 9:18 AM
WL-03045784 Labor Open 1.25 $0.00 Dec 22, 8:35 PM
WL-03045807 Labor Open 1.5 $178.50 Dec 22, 8:55 PM
WL-03045808 Travel Open 26 $110.00 Dec 22, 8:55 PM
WL-03045924 Labor Open 2.5 $0.00 Dec 22, 11:54 PM
WL-03045925 Travel Open 90 $0.00 Dec 22, 11:54 PM

Details