Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Jan 31, 2026
✓ SLA Met (6 biz days early)
🕐 Clock stopped: Completed (Jan 22, 2026)
▶ Clock Running
Status: Created
Oct 31 → Oct 31, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Oct 31 → Oct 31, 2025
0 business days (counted)
Running total: 0 of ? biz days used
7d
▶ Clock Running
Status: Assigned
Oct 31 → Nov 12, 2025
7 business days (counted)
Running total: 7 of ? biz days used
43d
▶ Clock Running
Status: Scheduled
Nov 12 → Jan 19, 2026
43 business days (counted)
Running total: 50 of ? biz days used
▶ Clock Running
Status: Tech On Site
Jan 19 → Jan 22, 2026
3 business days (counted)
Running total: 53 of ? biz days used
Created: Oct 31, 2025
Completed: Jan 22, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Oct 31 → Oct 31
Created
▶ Running
0
0
Oct 31 → Oct 31
Ready for Scheduling
▶ Running
0
0
Oct 31 → Nov 12
Assigned
▶ Running
7
7
Nov 12 → Jan 19
Scheduled
▶ Running
43
50
Jan 19 → Jan 22
Tech On Site
▶ Running
3
53
Coordinators
51.4 days
Over SLA
Field Work
2.6 days
Over SLA
Billing
10.8 days
Over SLA
Created: Oct 31, 2025
Due: Jan 31, 2026
Completed: Jan 22, 2026 (9 days early)
⏱️
44.0d in Scheduled
Longest Stage
🔄
7 transitions
Status Changes
⚠️
60.3d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00540085
6008087292
Closed
28R
SYS-GC-7890-E
Contract ends 07/31/2026 repair included
PM
G3440A
US10411044 Agilent 7890A Series GC Custom
G4557A
US21020009 7697A Headspace Sampler, 111 Vial
🚨
Primary Delay
44.0 days stuck in "Scheduled"
⏱️
Total Delay
60.3 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
44.0d
/ 2.0d SLA
Tech On Site
2.6d
/ 1.0d SLA
Ready to Bill
10.8d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📅 Events (1)
🔒
Internal CSA Notes
01/19 Google map was used to calculate zone. MD
Please assign to Maria Davis ARP to site is 68 miles. Zone 2
🔧
Work Performed
01/19/2025 GCHS PM completed per Agilent. Temperatures cooldown. GC & HS parts were replaced. Method was loaded and stabilize for some time. System is up and back in operation.
⚠️
Problem Description
28R
SYS-GC-7890-E
Contract ends 07/31/2026 repair included
PM
G3440A
US10411044 Agilent 7890A Series GC Custom
G4557A
US21020009 7697A Headspace Sampler, 111 Vial
📄
Description
Agilent 7890A Series GC
📞
Call Description
JAN 2026 GC PM
📅
WO-01312374 - Preventive Maintenance - G3440A - Irving - Quest Diagnostics Incorporated
Jan 27, 2026 11:00am – 5:00pm
Work Order: WO-01312374
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008087292
Location: Quest Diagnostics Incorporated
Address: 4770 Regent Blvd, Irving, TX 75063
Manufacturer: Agilent Technologies
Model #: G3440A
Serial #: US10411044
Contact Name: Jesika Patel
Contact Phone: (972) 91
Timeline
📞
📋
Work Order:
WO-01312374
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
🗓️
📅
Scheduled For:
2026-01-14T16:00:00.000+0000
📅
Scheduled For:
2026-01-19T16:00:00.000+0000
📅
Scheduled For:
2026-01-15T16:00:00.000+0000
📅
Scheduled For:
2026-01-26T16:00:00.000+0000
📅
Scheduled For:
2026-01-27T16:00:00.000+0000
🔩
Type:
Parts
Status:
Open
Qty:
2, 1
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
68d 6h
🔩
🔩
Type:
Parts
Status:
Open
Qty:
1
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
5, 2, 2.5, 64, 65
✔️
From:
Tech On Site, Completed
To:
Completed, Closed
Duration in Previous:
2d 9h, 0m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
12h 27m
📨
🧾
Invoice Number:
SM-253062
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
4m
Bottlenecks
Assigned
Duration: 7.4 business days (threshold: 4.0 business hours)
Exceeded by 6.9 business days
Scheduled
Duration: 44.0 business days (threshold: 2.0 business days)
Exceeded by 42.0 business days
Tech On Site
Duration: 2.6 business days (threshold: 1.0 business days)
Exceeded by 1.6 business days
Ready to Bill
Duration: 10.8 business days (threshold: 1.0 business days)
Exceeded by 9.8 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Jan 27, 11:00 AM
Work Details (11)
Name
Type
Status
Qty
Amount
Date
WL-03066717
Parts
Open
2
$0.00
Jan 15, 3:55 PM
WL-03066718
Parts
Open
2
$0.00
Jan 15, 3:55 PM
WL-03066719
Parts
Open
2
$0.00
Jan 15, 3:55 PM
WL-03066720
Parts
Open
1
$0.00
Jan 15, 3:55 PM
WL-03070853
Parts
Open
2
$0.00
Jan 19, 5:22 PM
WL-03070862
Parts
Open
1
$0.00
Jan 19, 5:24 PM
WL-03074539
Labor
Open
5
$456.00
Jan 21, 11:41 PM
WL-03074540
Labor
Open
2
$0.00
Jan 21, 11:41 PM
WL-03074541
Labor
Open
2.5
$0.00
Jan 21, 11:41 PM
WL-03074542
Travel
Open
64
$359.00
Jan 21, 11:41 PM
WL-03074543
Travel
Open
65
$0.00
Jan 21, 11:41 PM