Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Jan 31, 2026
✓ SLA Met (9 biz days early)
🕐 Clock stopped: Tech Off Site (Jan 16, 2026)
▶ Clock Running
Status: Created
Nov 4 → Nov 4, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Nov 4 → Nov 4, 2025
0 business days (counted)
Running total: 0 of ? biz days used
5d
▶ Clock Running
Status: Assigned
Nov 4 → Nov 12, 2025
5 business days (counted)
Running total: 5 of ? biz days used
42d
▶ Clock Running
Status: Scheduled
Nov 12 → Jan 15, 2026
42 business days (counted)
Running total: 47 of ? biz days used
▶ Clock Running
Status: Tech On Site
Jan 15 → Jan 16, 2026
1 business day (counted)
Running total: 48 of ? biz days used
Created: Nov 4, 2025
Tech Off Site: Jan 16, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Nov 4 → Nov 4
Created
▶ Running
0
0
Nov 4 → Nov 4
Ready for Scheduling
▶ Running
0
0
Nov 4 → Nov 12
Assigned
▶ Running
5
5
Nov 12 → Jan 15
Scheduled
▶ Running
42
47
Jan 15 → Jan 16
Tech On Site
▶ Running
1
48
Coordinators
49.0 days
Over SLA
Field Work
2.3 days
Over SLA
Billing
7.2 days
Over SLA
Created: Nov 4, 2025
Due: Jan 31, 2026
Completed: Jan 16, 2026 (15 days early)
⏱️
43.0d in Scheduled
Longest Stage
🔄
8 transitions
Status Changes
⚠️
53.7d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00540694
6008087677
Closed
28R
SYS-GM-5977T
Contract ends 07/31/2026 repair included
PM
G4514A
CN16140033 7693A Tray, 150 Vial
G7077B
US1642M020 5977B Inert Plus MSD Turbo EI Mainframe
G4513A
CN16330186 7693A Autoinjector
G3442B
CN16393079 Agilent 7890B GC for MS with SSL inlet
🚨
Primary Delay
43.0 days stuck in "Scheduled"
⏱️
Total Delay
53.7 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
43.0d
/ 2.0d SLA
Tech On Site
2.0d
/ 1.0d SLA
Tech Off Site
0.3d
/ 2.0d SLA
Ready to Bill
7.2d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📅 Events (1)
🔒
Internal CSA Notes
01/15 System is GCMS #10/ Google was used to calculate zon3. 1st cal of Today. Maria
Please assign to Maria Davis ARP to site is 65 miles. Zone 2
🔧
Work Performed
01/15/2026 GCMS #10 PM was completed per Agilent. MS was tuned and vented. Ion source was cleaned, rough pump oil, GC parts and gas filter were replaced. System was pump down and stabilize for some time. After Tune and Tune evaluation passed.
⚠️
Problem Description
28R
SYS-GM-5977T
Contract ends 07/31/2026 repair included
PM
G4514A
CN16140033 7693A Tray, 150 Vial
G7077B
US1642M020 5977B Inert Plus MSD Turbo EI Mainframe
G4513A
CN16330186 7693A Autoinjector
G3442B
CN16393079 Agilent 7890B GC for MS with SSL inlet
📄
Description
Agilent 7890B GC for MS with SSL inlet
📞
Call Description
JAN 2025 GC PM
📅
WO-01312888 - Preventive Maintenance - G3442B - Irving - Quest Diagnostics Incorporated
Jan 26, 2026 11:00am – 5:00pm
Work Order: WO-01312888
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008087677
Location: Quest Diagnostics Incorporated
Address: 4770 Regent Blvd, Irving, TX 75063
Manufacturer:
Model #: G3442B
Serial #: CN16393079
Contact Name: Jesika Patel
Contact Phone: (972) 916-3200
Contact Email
Timeline
📞
📋
Work Order:
WO-01312888
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
🗓️
📅
Scheduled For:
2026-01-16T16:00:00.000+0000
📅
Scheduled For:
2026-01-26T16:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
64d 2h
⏱️
Type:
Labor, Travel, Parts
Status:
Open
Qty:
2.5, 65, 1
🔩
Type:
Parts
Status:
Open
Qty:
1
🚗
From:
Tech On Site
To:
Tech Off Site
Duration in Previous:
21h 1m
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
5, 3, 66
✔️
From:
Tech Off Site, Completed
To:
Completed, Closed
Duration in Previous:
2h 0m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
7h 26m
📨
🧾
Invoice Number:
SM-252436
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
1m
Bottlenecks
Assigned
Duration: 6.0 business days (threshold: 4.0 business hours)
Exceeded by 5.5 business days
Scheduled
Duration: 43.0 business days (threshold: 2.0 business days)
Exceeded by 41.0 business days
Tech On Site
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Ready to Bill
Duration: 7.2 business days (threshold: 1.0 business days)
Exceeded by 6.2 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Jan 26, 11:00 AM
Work Details (11)
Name
Type
Status
Qty
Amount
Date
WL-03066551
Labor
Open
2.5
$0.00
Jan 15, 2:49 PM
WL-03066552
Travel
Open
65
$359.00
Jan 15, 2:49 PM
WL-03066553
Parts
Open
1
$0.00
Jan 15, 2:49 PM
WL-03066554
Parts
Open
1
$0.00
Jan 15, 2:49 PM
WL-03066555
Parts
Open
1
$0.00
Jan 15, 2:49 PM
WL-03066556
Parts
Open
1
$0.00
Jan 15, 2:49 PM
WL-03066557
Parts
Open
1
$0.00
Jan 15, 2:49 PM
WL-03066613
Parts
Open
1
$0.00
Jan 15, 3:23 PM
WL-03067567
Labor
Open
5
$570.00
Jan 16, 8:04 AM
WL-03067568
Labor
Open
3
$0.00
Jan 16, 8:04 AM
WL-03067569
Travel
Open
66
$0.00
Jan 16, 8:04 AM