Midmark Service Request Dispatch Authorization - WO-00125547
Closed
Zone 1
PM NWD - 5YR
PM Service Requirements: Tech needs to watch the training video ( https://www.youtube.com/watch?v=U-Pk5zkW0ug) prior to
them going on-site. Tech to follow the checklist that is sent in the PM Kit. Tech needs to show up on site with the proper
supplies (including distilled water). Tech needs to submit to Midmark completed/signed checklist. Tech should also leave a
copy of completed checklist with Customer.
Ship Exchanged Open 737646 002-10251-00 1.00000
12/1/2025 NSuarez PM Checklist attached is missing Customer name, customer address, cycle completed, model, Serial number and Date of inspection please fill this out.
DCH 11/20 cannot close work order have no work order to document time going home. Also did not have receipt for hotel cost to put in expense
11/12 KKelch scheduled per logged email from Matt. Email logged on WO-01314425. Per Matt, please begin with the downstairs procedure rooms and then work your way upstairs
11/12 KKelch called Matt to schedule for 11/20 between 11:30 and 12:30 pm. Unable to leave VM, sent email. Call and email logged on WO-01314430
11/12/2025 JRolston - Per UPS, ETA on wb 1ZE444250372091720 is Friday, 11/14. Updated work order accordingly.
🔧Work Performed
I arrived on location and found said unit. I then removed the door and dam gasket and replaced with pm kit sent from mid-mark. I then cleaned chamber and trays etc. I then removed all the covers from the unit and did inspection of the unit. I then removed the coil in tank and re installed in tank. I the performed two back-to-back packs cycle all passed test. Unit was disinfected and clean and returned to service.
🔍Technician Findings
Found all 5 unit in operation
⚠️Problem Description
Zone 1
PM NWD - 5YR
PM Service Requirements: Tech needs to watch the training video ( https://www.youtube.com/watch?v=U-Pk5zkW0ug) prior to
them going on-site. Tech to follow the checklist that is sent in the PM Kit. Tech needs to show up on site with the proper
supplies (including distilled water). Tech needs to submit to Midmark completed/signed checklist. Tech should also leave a
copy of completed checklist with Customer.
Ship Exchanged Open 737646 002-10251-00 1.00000
📄Description
Midmark Model M11 (Series) Self Contained Steam Sterilizer (Includes ALL M11 Models)
📧
Email:Re: Scheduling for PMs at Associated Plastic Suregons
Completed Nov 12, 2025
From: matt.pick@apskc.com
To: kaitlyn.kelch@emsar.com
Cc: erin.hensley@apskc.com
We can make that work? How long does 1 autoclave take so I block procedure room time appropriately?
Please have them do the Downstairs Procedure Room 1st, then the Upstairs Procedure Room 2nd. I have blocked the schedule.
Thanks, Matt Pick913-451-5050
From: Kaitlyn Kelch <kaitlyn.kelch@emsar.com>Sent: Wednesday, November 12, 2025 11:09 AMTo: Matt Pick <matt.pick@apskc.com>Subject: Re: Sche
📧
Email: WO-01314425
Completed Nov 10, 2025
To: matt.pick@apskc.com
CC:
BCC:
Attachment: --none--
Subject: WO-01314425
Body:
Hello,
We have received your Midmark PM requests and have created a wo, wo-01314425. You will get a phone call from a coordinator to schedule this visit
EMSAR DISPATCH
800-543-2787