Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01314518 ↗ ServiceMax

PHILIPS HEALTHCARE • Repair • PC

📍 Stony Brook University Hospital — 101 Nicolls Rd, Stony Brook NY, 11794

Nov 11, 2025 → Dec 7, 2025

✅ Completed
PC
SLA Clock
Per client agreement · Target: Nov 25, 2025
✗ SLA Missed (4 biz days late)
Active: 14 biz days
Paused: 2 biz days
🕐 Clock stopped: Completed (Dec 5, 2025)
▶ Clock Running
Status: Created
Nov 11 → Nov 11, 2025
0 business days (counted)
Running total: 0 of ? biz days used
⏸2d
⏸ Clock Paused
Status: Ready for Release
Nov 11 → Nov 13, 2025
2 business days (not counted)
10d
▶ Clock Running
Status: Assigned
Nov 13 → Dec 1, 2025
10 business days (counted)
Running total: 10 of ? biz days used
▶ Clock Running
Status: Scheduled
Dec 1 → Dec 1, 2025
0 business days (counted)
Running total: 10 of ? biz days used
▶ Clock Running
Status: Entered
Dec 1 → Dec 1, 2025
0 business days (counted)
Running total: 10 of ? biz days used
4d
▶ Clock Running
Status: Scheduled
Dec 1 → Dec 5, 2025
4 business days (counted)
Running total: 14 of ? biz days used
Created: Nov 11, 2025 Completed: Dec 5, 2025
Show SLA Clock Detail (6 periods)
Period Status Clock Biz Days Running Total
Nov 11 → Nov 11 Created ▶ Running 0 0
Nov 11 → Nov 13 Ready for Release ⏸ Paused 2
Nov 13 → Dec 1 Assigned ▶ Running 10 10
Dec 1 → Dec 1 Scheduled ▶ Running 0 10
Dec 1 → Dec 1 Entered ▶ Running 0 10
Dec 1 → Dec 5 Scheduled ▶ Running 4 14
Holding 2.0d (excluded)
Coordinators 15.3d
Field Work 1.0d
Billing 1.4d
✗ SLA Missed
Holding (excluded from total)
2.0 days
Coordinators
15.3 days
Over SLA
Field Work
1.0 days
Billing
1.4 days
Over SLA
Created: Nov 11, 2025 Due: Nov 25, 2025 Completed: Dec 7, 2025 (11 days late)
📅
16.0 days Total Age
⏱️
10.9d in Assigned Longest Stage
🔄
9 transitions Status Changes
⚠️
12.8d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
4 lines Work Details
🏠
1 visit On-Site Trips
📋
Coordinator Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00542848
URGENT Philips WO Request
Closed
FCO86600081, follow up repair - ASP EMSAR TO REPAIR. H3531974182D2 Needs system board, AECM and 3 way Solenoid
Priority
High
Origin
Email
Reason
New Case
Contact
Jon Schneider
Owner
Shelby Robinson
Created
Nov 11, 2025
Work Orders from this Case (2)
WO-01314518 (current) Invoiced
Repair • Davon Cox
Created: Nov 11, 2025 • Closed: Dec 7, 2025
WO-01314519 Invoiced
Repair • Alberto Galan
Created: Nov 11, 2025 • Closed: Dec 5, 2025
Completed with significant delays
Invoiced • 113 days old
🚨
Primary Delay 10.9 days stuck in "Assigned"
⏱️
Total Delay 12.8 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Release
2.0d
Assigned
10.9d / 0.5d SLA
Scheduled
4.4d / 2.0d SLA
Completed
1.0d / 1.0d SLA
Closed
1.0d / 1.0d SLA
07e-Partial Project
3.5d
Ready to Bill
1.4d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

12/01/2025 RArnold - Dispatching to Alberto / Reassigned to Davon


11/21/2025 RArnold- PWO is still pending entitlement, Fady is working with the customer on PO


11/11/2025 Brod - Repair for device that failed FCO81. PWO pending entitlement

🔧 Work Performed
Full PVT performed per manufacturer specifications. O₂ calibration completed and confirmed. Unit cleared for clinical use. The customer was notified that an O₂ regulation error was traced to an expired FiO₂ sensor, and the unit was being operated without proper calibration.
🔍 Technician Findings
Full PVT performed per manufacturer specifications. O₂ calibration completed and confirmed. Unit cleared for clinical use. The customer was notified that an O₂ regulation error was traced to an expired FiO₂ sensor, and the unit was being operated without proper calibration.
⚠️ Problem Description
FCO86600081, follow up repair - ASP EMSAR TO REPAIR. H3531974182D2 Needs system board, AECM and 3 way Solenoid
📄 Description
Philips Trilogy EV300 Hospital Ventilator (DS2200X11B / 989805661881)
📞 Call Description
Repair - Trade

Timeline

📞
Case Linked Nov 11, 10:46 AM
Case Number: 00542848
Subject: URGENT Philips WO Request
Status: Closed
📋
Work Order Created Nov 11, 10:53 AM
Work Order: WO-01314518
Type: Repair
Priority: PC
Status: Ready for Release by Brandi Rodriguez Nov 11, 2:36 PM
From: Entered
To: Ready for Release
Duration in Previous: 3h 43m
2.0 business days
👷
2 Technician Assigned Nov 13, 11:56 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Brandi Rodriguez
From: Ready for Release
To: Assigned
Duration in Previous: 1d 21h
🚨 11.0 business days
👷
3 Technician Assigned Dec 1, 1:42 PM
Technician Assigned → Status: Scheduled → Dispatch Scheduled
🗓️
Status: Scheduled by Rebecca Arnold
From: Assigned
To: Scheduled
Duration in Previous: 18d 1h
📅
Dispatch Scheduled by Rebecca Arnold
Scheduled For: 2025-12-01T13:00:00.000+0000
🆕
3 Status: Entered Dec 1, 4:58 PM
Status: Entered → Technician Assigned → Dispatch Scheduled
👷
Technician Assigned by Rebecca Arnold
Technician: a0hVU0000050MIbYAM, Davon Cox
📅
Dispatch Scheduled by Rebecca Arnold
Scheduled For: 2025-12-01T13:00:00.000+0000
3.9 business days
⏱️
2x Labor Added Dec 5, 12:30 AM
Type: Labor
Status: Open
Qty: 3, 1
⏱️
Labor Added Dec 5, 1:05 AM
Type: Labor
Status: Open
Qty: 0.25
✔️
Status: Completed by Davon Cox Dec 5, 1:12 AM
From: Scheduled
To: Completed
Duration in Previous: 3d 8h
1.0 business days
🏁
Status: Closed by Davon Cox Dec 7, 4:23 PM
From: Completed
To: Closed
Duration in Previous: 2d 15h
⏱️
2 Labor Added Dec 8, 2:37 PM
Labor Added → Status: 07e-Partial Project
📋
Status: 07e-Partial Project by Timothy Amburgey
From: Closed
To: 07e-Partial Project
Duration in Previous: 22h 15m
4.0 business days
📄
Status: Ready to Bill by Timothy Amburgey Dec 11, 3:46 PM
From: 07e-Partial Project
To: Ready to Bill
Duration in Previous: 3d 1h
💰
Status: Invoiced by Josh Longway Dec 12, 4:01 AM
From: Ready to Bill
To: Invoiced
Duration in Previous: 12h 15m

Bottlenecks

Assigned
Duration: 10.9 business days (threshold: 4.0 business hours)
Exceeded by 10.4 business days
Scheduled
Duration: 4.0 business days (threshold: 2.0 business days)
Exceeded by 2.0 business days
Ready to Bill
Duration: 1.4 business days (threshold: 1.0 business days)
Exceeded by 3.2 business hours

🔗 Related Artifacts

📞
Case 00542848
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
PC
Type
Repair
Branch
ERLA - PROD
Technician
Davon Cox
Scheduled
Dec 1, 8:00 AM
Created
Nov 11, 10:53 AM
Invoice #
N/A

Work Details (4)

Name Type Status Qty Amount Date
WL-03027524 Labor Open 3 $285.00 Dec 5, 12:30 AM
WL-03027525 Labor Open 1 $155.00 Dec 5, 12:30 AM
WL-03027527 Labor Open 0.25 $23.75 Dec 5, 1:05 AM
WL-03030246 Labor Open 0.016666666666667 $38.00 Dec 8, 2:37 PM

Details