38R
SYS-LC-1290II
Contract ends 10/18/2026 repair included
PMPLUS
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G4239C
000000000032267069 8pos/18port, 8-column selector, 1300 bar
G7116B
DEBA412245 1290 Infinity II Multicolumn Thermostat
G7117B
DEBAW05967 1290 Infinity II Diode Array Detector
G1170A
DEBAD08355 1290 Infinity Valve Drive
7167B
DEBAS04705 1290 Infinity II Multisampler
G7120A
DEBAY05984 1290 Infinity II High Speed Pump
G4761A
DEBDS03604 Upgrade InfinityLab Sample Thermostat
Reached out to location with proposed onsite visit time frame. Second attempt to schedule.
20 Nov 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame.
Please assign to Larry Alberty ARP to site is 25 miles. Zone 1
🔧Work Performed
Completed LC PM.
⚠️Problem Description
38R
SYS-LC-1290II
Contract ends 10/18/2026 repair included
PMPLUS
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G4239C
000000000032267069 8pos/18port, 8-column selector, 1300 bar
G7116B
DEBA412245 1290 Infinity II Multicolumn Thermostat
G7117B
DEBAW05967 1290 Infinity II Diode Array Detector
G1170A
DEBAD08355 1290 Infinity Valve Drive
7167B
DEBAS04705 1290 Infinity II Multisampler
G7120A
DEBAY05984 1290 Infinity II High Speed Pump
G4761A
DEBDS03604 Upgrade InfinityLab Sample Thermostat
📄Description
1290 Infinity II High Speed Pump
📞Call Description
JAN 2026 LC PMPLUS
📞
Call
Completed Dec 1, 2025
1 Dec 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame. Second attempt to schedule.
📞
Call
Completed Nov 20, 2025
20 Nov 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame.