Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01316814 ↗ ServiceMax

AGILENT TECHNOLOGIES (ASP) • Repair • PC

📍 OXEA Corporation — US Hwy 77 S, BISHOP TX, 78343

Nov 24, 2025 → Dec 1, 2025

✅ Completed
PC
SLA Clock
Per client agreement · Target: Dec 1, 2025
✗ SLA Missed (1 biz days late)
Active: 4 biz days
🕐 Clock stopped: Completed (Dec 2, 2025)
▶ Clock Running
Status: Created
Nov 24 → Nov 24, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Nov 24 → Nov 24, 2025
0 business days (counted)
Running total: 0 of ? biz days used
1d
▶ Clock Running
Status: Assigned
Nov 24 → Nov 25, 2025
1 business day (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Entered
Nov 25 → Nov 25, 2025
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Nov 25 → Nov 25, 2025
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Assigned
Nov 25 → Nov 25, 2025
0 business days (counted)
Running total: 1 of ? biz days used
2d
▶ Clock Running
Status: Scheduled
Nov 25 → Dec 1, 2025
2 business days (counted)
Running total: 3 of ? biz days used
▶ Clock Running
Status: Tech On Site
Dec 1 → Dec 2, 2025
1 business day (counted)
Running total: 4 of ? biz days used
Created: Nov 24, 2025 Completed: Dec 2, 2025
Show SLA Clock Detail (8 periods)
Period Status Clock Biz Days Running Total
Nov 24 → Nov 24 Created ▶ Running 0 0
Nov 24 → Nov 24 Ready for Scheduling ▶ Running 0 0
Nov 24 → Nov 25 Assigned ▶ Running 1 1
Nov 25 → Nov 25 Entered ▶ Running 0 1
Nov 25 → Nov 25 Ready for Scheduling ▶ Running 0 1
Nov 25 → Nov 25 Assigned ▶ Running 0 1
Nov 25 → Dec 1 Scheduled ▶ Running 2 3
Dec 1 → Dec 2 Tech On Site ▶ Running 1 4
Dispatch 0.0d
Coordinators 4.4d
Field Work 1.0d
Billing 14.3d
✗ SLA Missed
Dispatch
0.0 days
Coordinators
4.4 days
Over SLA
Field Work
1.0 days
Over SLA
Billing
14.3 days
Over SLA
Created: Nov 24, 2025 Due: Dec 1, 2025 Completed: Dec 2, 2025 (on time)
📅
4.3 days Total Age
⏱️
14.3d in Ready to Bill Longest Stage
🔄
8 transitions Status Changes
⚠️
14.9d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
10 lines Work Details
🏠
2 visits On-Site Trips
👤
Self-Scheduled Scheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
👤 Self-scheduled by Jose Gutierrez — scheduling delays attributed to technician, not coordinators
Visit 1 Nov 24, 2025
Visit 2 Dec 1, 2025

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00546221
6008231444
Closed
SYS-GC-7890A-E Repair OTS HS inquiry ARP STD
Priority
High
Origin
Web
Reason
New Case
Contact
Wendy Rangel
Owner
Leona Coonrod
Created
Nov 24, 2025
Work Orders from this Case (1)
WO-01316814 (current) Invoiced
Repair • Jose Gutierrez
Created: Nov 24, 2025 • Closed: Dec 1, 2025
Completed with significant delays
Invoiced • 100 days old
🚨
Primary Delay 14.3 days stuck in "Ready to Bill"
⏱️
Total Delay 14.9 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
2.3d / 0.5d SLA
Scheduled
2.1d / 2.0d SLA
Tech On Site
1.0d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
14.3d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

Please assign to Jose Gutierrez ARP to site is 162 miles. Zone 4

🔧 Work Performed
Customer described issues of a vial pressure shutdown, which prevented the headspace to start sample runs. Ran the headspace leak and restriction test, and saw the instrument fail at stage 1 of the needle restriction test, with P=0.6. Replaced the old sample probe with a new one that the customer had in their inventory. However, that only gave marginal improvements. Replaced the entire flow block manifold. Again, there were only slight improvements to the pressure. Replaced SV1, the vial pressurization valve. No real improvements were seen at this point. Verified that the correct vial pressurization gas was configured correctly on the headspace. Investigated the gas sensor calibrations, as the flows and pressures were out of the typical range while running the leak and restriction test. Calibrated the vial flow and pressure sensors, and immediately saw flows and pressures that one would expect while the headspace is idle. Re-ran the leak and restriction test, which passed.
⚠️ Problem Description
SYS-GC-7890A-E Repair OTS HS inquiry ARP STD
📄 Description
7697A Headspace Sampler, 12
📞 Call Description
DEC 2025 GC REPAIR

Timeline

📞
4 Case Linked Nov 24, 8:07 AM
Case Linked → Work Order Created → Status: Ready for Scheduling → Technician Assigned
📋
Work Order Created
Work Order: WO-01316814
Type: Repair
Priority: PC
📅
Status: Ready for Scheduling by Leona Coonrod
From: Entered, Ready for Scheduling
To: Ready for Scheduling, Assigned
Duration in Previous: 0m
👷
Technician Assigned by Leona Coonrod
Technician: Maria Davis
2.0 business days
🆕
2 Status: Entered Nov 25, 3:36 PM
Status: Entered → Technician Assigned
👷
Technician Assigned by Leona Coonrod
Technician: Jose Gutierrez
⏱️
3 5x Labor Added Nov 25, 6:11 PM
5x Labor Added → Status: Scheduled → Dispatch Scheduled
🗓️
Status: Scheduled by Jose Gutierrez
From: Assigned
To: Scheduled
Duration in Previous: 2h 36m
📅
Dispatch Scheduled by Jose Gutierrez
Scheduled For: 2025-12-01T18:00:00.000+0000
2.7 business days
🔧
Status: Tech On Site by Jose Gutierrez Dec 1, 1:40 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 5d 19h
⏱️
5x Labor Added Dec 1, 9:09 PM
Type: Labor, Travel
Status: Open
Qty: 2.5, 4, 157
✔️
Status: Completed by Jose Gutierrez Dec 1, 9:45 PM
From: Tech On Site, Completed
To: Completed, Closed
Duration in Previous: 8h 4m, 0m
📄
Status: Ready to Bill by Hannah Shaw Dec 2, 4:42 PM
From: Closed
To: Ready to Bill
Duration in Previous: 18h 57m
🚨 14.9 business days
📨
3 Status: Invoice Pending Dec 22, 1:38 PM
Status: Invoice Pending → Invoice Created → Status: Invoiced
🧾
Invoice Created
Invoice Number: SM-249754
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 3m

Bottlenecks

Assigned
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Scheduled
Duration: 2.1 business days (threshold: 2.0 business days)
Exceeded by 0.8 business hours
Tech On Site
Duration: 1.0 business days (threshold: 1.0 business days)
Exceeded by 0.1 business hours
Ready to Bill
Duration: 14.3 business days (threshold: 1.0 business days)
Exceeded by 13.3 business days

🔗 Related Artifacts

📞
Case 00546221
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
PC
Type
Repair
Branch
N/A
Technician
Jose Gutierrez
Scheduled
Dec 1, 1:00 PM
Created
Nov 24, 8:09 AM
Invoice #
SM-249754

Work Details (10)

Name Type Status Qty Amount Date
WL-03020179 Labor Open 2.5 $0.00 Nov 25, 6:11 PM
WL-03020180 Labor Open 2.5 $285.00 Nov 25, 6:11 PM
WL-03020181 Labor Open 2.5 $0.00 Nov 25, 6:11 PM
WL-03020182 Travel Open 153 $718.00 Nov 25, 6:11 PM
WL-03020183 Travel Open 153 $0.00 Nov 25, 6:11 PM
WL-03023022 Labor Open 2.5 $0.00 Dec 1, 9:09 PM
WL-03023023 Labor Open 4 $456.00 Dec 1, 9:09 PM
WL-03023024 Labor Open 2.5 $0.00 Dec 1, 9:09 PM
WL-03023025 Travel Open 157 $718.00 Dec 1, 9:09 PM
WL-03023026 Travel Open 157 $0.00 Dec 1, 9:09 PM

Details