Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Dec 31, 2025
✓ SLA Met (9 biz days early)
🕐 Clock stopped: Tech Off Site (Dec 17, 2025)
▶ Clock Running
Status: Created
Nov 25 → Nov 25, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Nov 25 → Nov 25, 2025
0 business days (counted)
Running total: 0 of ? biz days used
6d
▶ Clock Running
Status: Assigned
Nov 25 → Dec 6, 2025
6 business days (counted)
Running total: 6 of ? biz days used
7d
▶ Clock Running
Status: Scheduled
Dec 6 → Dec 16, 2025
7 business days (counted)
Running total: 13 of ? biz days used
▶ Clock Running
Status: Tech On Site
Dec 16 → Dec 17, 2025
1 business day (counted)
Running total: 14 of ? biz days used
Created: Nov 25, 2025
Tech Off Site: Dec 17, 2025
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Nov 25 → Nov 25
Created
▶ Running
0
0
Nov 25 → Nov 25
Ready for Scheduling
▶ Running
0
0
Nov 25 → Dec 6
Assigned
▶ Running
6
6
Dec 6 → Dec 16
Scheduled
▶ Running
7
13
Dec 16 → Dec 17
Tech On Site
▶ Running
1
14
Coordinators
13.9 days
Over SLA
Field Work
2.6 days
Over SLA
Billing
11.6 days
Over SLA
Created: Nov 25, 2025
Due: Dec 31, 2025
Completed: Dec 17, 2025 (14 days early)
⏱️
11.6d in Ready to Bill
Longest Stage
🔄
8 transitions
Status Changes
⚠️
22.8d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
👤 Self-scheduled by Maria Davis — scheduling delays attributed to technician, not coordinators
Visit 1
Dec 16, 2025
Visit 2
Dec 17, 2025
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00546702
6008242893
Closed
28R
SYS-GM-5975T
Contract ends 07/31/2026 repair included
PM
G3171A
US62724348 5975C inert MSD Std. turbo EI mainframe
G2614A
CN72244177 7683 Autosampler tray module
G1530N
CN10642080 6890N Network GC System
G2913A
CN63735599 7683B Autoinjector Module
🚨
Primary Delay
11.6 days stuck in "Ready to Bill"
⏱️
Total Delay
22.8 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
7.0d
/ 2.0d SLA
Tech On Site
1.6d
/ 1.0d SLA
Tech Off Site
1.0d
/ 2.0d SLA
Ready to Bill
11.6d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📅 Events (1)
🔒
Internal CSA Notes
12/17 Google map was used to calculate zone. MD
12/16 GCMS6. 2nd call of today. Travel, mileage and zone are on WO-01317167 . GCMS#6. MD
Please assign to Maria Davis ARP to site is 65 miles. Zone 2
🔧
Work Performed
12/17/2025 GCMS PM completed per Agilent Ion source was cleaned. GC parts were replaced. Rough pump oil was replaced. System was pumping down and stabilized for some time Autotune and Tune Evaluation OK.
12/16/2025 GCMS PM started.
⚠️
Problem Description
28R
SYS-GM-5975T
Contract ends 07/31/2026 repair included
PM
G3171A
US62724348 5975C inert MSD Std. turbo EI mainframe
G2614A
CN72244177 7683 Autosampler tray module
G1530N
CN10642080 6890N Network GC System
G2913A
CN63735599 7683B Autoinjector Module
📄
Description
6890N Network GC System
📞
Call Description
DEC 2025 GC PM
📅
WO-01317165 - Preventive Maintenance - G1530N - Irving - Quest Diagnostics Incorporated
Dec 16, 2025 11:00am – 5:00pm
Work Order: WO-01317165
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008242893
Location: Quest Diagnostics Incorporated
Address: 4770 Regent Blvd, Irving, TX 75063
Manufacturer:
Model #: G1530N
Serial #: CN10642080
Contact Name: Jesika Patel
Contact Phone: (972) 916-3200
Contact Email
Timeline
📞
📋
Work Order:
WO-01317165
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
a0hF00000028i6gIAA, Maria Davis
🗓️
📅
Scheduled For:
2025-12-16T16:00:00.000+0000
🔩
Type:
Parts
Status:
Open
Qty:
1
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
9d 16h
⏱️
Type:
Labor, Expenses
Status:
Open
Qty:
2, 1
🚗
From:
Tech On Site
To:
Tech Off Site
Duration in Previous:
13h 48m
🚗
Type:
Travel
Status:
Open
Qty:
63
⏱️
⏱️
Type:
Labor
Status:
Open
Qty:
3.5
✔️
From:
Tech Off Site, Completed
To:
Completed, Closed
Duration in Previous:
17h 47m, 0m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
20h 7m
📨
🧾
Invoice Number:
SM-250617
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
1m
Bottlenecks
Assigned
Duration: 6.9 business days (threshold: 4.0 business hours)
Exceeded by 6.4 business days
Scheduled
Duration: 7.0 business days (threshold: 2.0 business days)
Exceeded by 5.0 business days
Tech On Site
Duration: 1.6 business days (threshold: 1.0 business days)
Exceeded by 5.1 business hours
Closed
Duration: 1.1 business days (threshold: 1.0 business days)
Exceeded by 1.1 business hours
Ready to Bill
Duration: 11.6 business days (threshold: 1.0 business days)
Exceeded by 10.6 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Dec 16, 11:00 AM
Work Details (11)
Name
Type
Status
Qty
Amount
Date
WL-03037994
Parts
Open
1
$0.00
Dec 15, 1:15 PM
WL-03037995
Parts
Open
1
$0.00
Dec 15, 1:15 PM
WL-03037996
Parts
Open
1
$0.00
Dec 15, 1:15 PM
WL-03037997
Parts
Open
1
$0.00
Dec 15, 1:15 PM
WL-03040259
Labor
Open
2
$0.00
Dec 16, 11:33 PM
WL-03040260
Expenses
Open
1
$0.00
Dec 16, 11:33 PM
WL-03040481
Travel
Open
63
$359.00
Dec 17, 11:36 AM
WL-03041074
Labor
Open
3
$0.00
Dec 17, 5:46 PM
WL-03041075
Labor
Open
2
$0.00
Dec 17, 5:46 PM
WL-03041076
Travel
Open
64
$0.00
Dec 17, 5:46 PM
WL-03041093
Labor
Open
3.5
$570.00
Dec 17, 5:49 PM