Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Jan 31, 2026
✓ SLA Met (14 biz days early)
🕐 Clock stopped: Completed (Jan 9, 2026)
▶ Clock Running
Status: Created
Dec 4 → Dec 4, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Dec 4 → Dec 4, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Dec 4 → Dec 5, 2025
1 business day (counted)
Running total: 1 of ? biz days used
23d
▶ Clock Running
Status: Scheduled
Dec 5 → Jan 9, 2026
23 business days (counted)
Running total: 24 of ? biz days used
▶ Clock Running
Status: Tech On Site
Jan 9 → Jan 9, 2026
0 business days (counted)
Running total: 24 of ? biz days used
Created: Dec 4, 2025
Completed: Jan 9, 2026
Show SLA Clock Detail (5 periods)
| Period |
Status |
Clock |
Biz Days |
Running Total |
| Dec 4 → Dec 4 |
Created |
▶ Running
|
0 |
0 |
| Dec 4 → Dec 4 |
Ready for Scheduling |
▶ Running
|
0 |
0 |
| Dec 4 → Dec 5 |
Assigned |
▶ Running
|
1 |
1 |
| Dec 5 → Jan 9 |
Scheduled |
▶ Running
|
23 |
24 |
| Jan 9 → Jan 9 |
Tech On Site |
▶ Running
|
0 |
24 |
Coordinators
25.1 days
Over SLA
Billing
11.3 days
Over SLA
Created: Dec 4, 2025
Due: Jan 31, 2026
Completed: Jan 9, 2026 (22 days early)
⏱️
24.0d in Scheduled
Longest Stage
🔄
8 transitions
Status Changes
⚠️
33.1d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00548733
6008084200
Closed
28R
SYS-LC-1100-E
Contract ends 01/31/2026 repair included
PM
PM only - customer supplies the UV lamp
G1321A
DE83700754 1200 Series Fluorescence Detector
G1322A
JP73014232 1260 Standard Degasser
G1313A
US80603783 1100 Autosampler
G1311A-A
DE91606598 1100 Series Quaternary Pump
G1315A
DE91608839 1100 Diode-array Detector
🚨
Primary Delay
24.0 days stuck in "Scheduled"
⏱️
Total Delay
33.1 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
24.0d
/ 2.0d SLA
Tech On Site
0.9d
/ 1.0d SLA
Completed
0.0d
/ 1.0d SLA
Ready to Bill
11.3d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
🔒
Internal CSA Notes
4 DEC 2025 Larry Alberty
Reached out to location with proposed onsite service time frame.
Please assign to Larry Alberty ARP to site is 18 miles. Zone 1
🔧
Work Performed
Completed LC PM.
⚠️
Problem Description
28R
SYS-LC-1100-E
Contract ends 01/31/2026 repair included
PM
PM only - customer supplies the UV lamp
G1321A
DE83700754 1200 Series Fluorescence Detector
G1322A
JP73014232 1260 Standard Degasser
G1313A
US80603783 1100 Autosampler
G1311A-A
DE91606598 1100 Series Quaternary Pump
G1315A
DE91608839 1100 Diode-array Detector
📄
Description
LC 1100 System Enhanced LC Features
📞
Call Description
JAN 2025 LC PM
📞
Call
Completed
Dec 4, 2025
4 DEC 2025 Larry Alberty
Reached out to location with proposed onsite service time frame.
📅
WO-01318655 - Preventive Maintenance - SYS-LC-1100-E - Mountain View - Pickering Laboratories Inc
Jan 9, 2026 9:00am – 2:00pm
Work Order: WO-01318655
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008084200
Location: Pickering Laboratories Inc
Address: 1280 Space Park Way, Mountain View, CA 94043
Manufacturer:
Model #: SYS-LC-1100-E
Serial #: S-PICK-LC-29247341860
Contact Name: Luca Nardin
Contact Phone: 65069
Timeline
📞
📋
Work Order:
WO-01318655
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
a0hF0000001pE6KIAU, Larry Alberty
🗓️
📅
Scheduled For:
2026-01-09T14:00:00.000+0000
🚗
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
35d 14h
⏱️
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
6h 50m
🏁
From:
Completed
To:
Closed
Duration in Previous:
3m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
2d 23h
📨
🧾
Invoice Number:
SM-252436
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
1m
Bottlenecks
Assigned
Duration: 1.1 business days (threshold: 4.0 business hours)
Exceeded by 4.5 business hours
Scheduled
Duration: 24.0 business days (threshold: 2.0 business days)
Exceeded by 22.0 business days
Closed
Duration: 1.2 business days (threshold: 1.0 business days)
Exceeded by 1.8 business hours
Ready to Bill
Duration: 11.3 business days (threshold: 1.0 business days)
Exceeded by 10.3 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Work Details (7)
| Name |
Type |
Status |
Qty |
Amount |
Date |
| WL-03059279 |
Travel |
Open |
20 |
$180.00 |
Jan 9, 10:14 AM |
| WL-03059280 |
Travel |
Open |
20 |
$0.00 |
Jan 9, 10:14 AM |
| WL-03059281 |
Parts |
Open |
1 |
$0.00 |
Jan 9, 10:14 AM |
| WL-03059282 |
Parts |
Open |
1 |
$0.00 |
Jan 9, 10:14 AM |
| WL-03060130 |
Labor |
Open |
1 |
$0.00 |
Jan 9, 5:05 PM |
| WL-03060131 |
Labor |
Open |
4 |
$513.00 |
Jan 9, 5:05 PM |
| WL-03060132 |
Labor |
Open |
1 |
$0.00 |
Jan 9, 5:05 PM |