Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Jan 31, 2026
✗ SLA Missed (1 biz days late)
🕐 Clock stopped: Completed (Feb 2, 2026)
▶ Clock Running
Status: Created
Dec 8 → Dec 8, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Dec 8 → Dec 8, 2025
0 business days (counted)
Running total: 0 of ? biz days used
4d
▶ Clock Running
Status: Assigned
Dec 8 → Dec 13, 2025
4 business days (counted)
Running total: 4 of ? biz days used
31d
▶ Clock Running
Status: Scheduled
Dec 13 → Jan 29, 2026
31 business days (counted)
Running total: 35 of ? biz days used
▶ Clock Running
Status: Tech On Site
Jan 29 → Feb 2, 2026
2 business days (counted)
Running total: 37 of ? biz days used
Created: Dec 8, 2025
Completed: Feb 2, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Dec 8 → Dec 8
Created
▶ Running
0
0
Dec 8 → Dec 8
Ready for Scheduling
▶ Running
0
0
Dec 8 → Dec 13
Assigned
▶ Running
4
4
Dec 13 → Jan 29
Scheduled
▶ Running
31
35
Jan 29 → Feb 2
Tech On Site
▶ Running
2
37
Coordinators
36.0 days
Over SLA
Field Work
1.4 days
Over SLA
Billing
19.7 days
Over SLA
Created: Dec 8, 2025
Due: Jan 31, 2026
Completed: Feb 2, 2026 (1 days late)
⏱️
31.0d in Scheduled
Longest Stage
🔄
10 transitions
Status Changes
⚠️
50.7d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00549618
6008156959
Closed
28R
SYS-LC-1260II
Contract ends 05/31/2026 repair included
PM
PM only - customer supplies the UV lamp
G7114A
DEACX31512 1260 Infinity II VW Detector
G3592A
CN22330015 Dual-channel A/D interface box
G7116A
DEAEM11105 1260 Infinity II Multicolumn Thermostat
G7111B
DEAEW12352 1260 Infinity II Quaternary Pump
G7129A
DEAEQ56216 1260 Infinity II Vialsampler
🚨
Primary Delay
31.0 days stuck in "Scheduled"
⏱️
Total Delay
50.7 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
31.0d
/ 2.0d SLA
Tech On Site
1.4d
/ 1.0d SLA
Completed
0.0d
/ 1.0d SLA
Ready to Bill
9.8d
/ 1.0d SLA
Billing Review
9.9d
/ 2.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📅 Events (1)
🔒
Internal CSA Notes
2.3.26 hshaw - moved WO to BR, waiting for mService to close
01/29 Google map was used to calculate zone. 1st call of today. Per dime 12 hr. work, 25.00, that I miss to add in WO 01317588. An email was sent to add part on 01/31
MD
Please assign to Maria Davis ARP to site is 53 miles. Zone 2
🔧
Work Performed
01/29/2026 LC 1260 Infinity II was performed per Agilent. LC cleaned with H2O. PM was completed per Agilent. System was flushed and when running conditioning sample autosampler 's needle got jammed, needle was vented and needed to be replaced. System was flushed with mobile phase and run a conditioning sample.
⚠️
Problem Description
28R
SYS-LC-1260II
Contract ends 05/31/2026 repair included
PM
PM only - customer supplies the UV lamp
G7114A
DEACX31512 1260 Infinity II VW Detector
G3592A
CN22330015 Dual-channel A/D interface box
G7116A
DEAEM11105 1260 Infinity II Multicolumn Thermostat
G7111B
DEAEW12352 1260 Infinity II Quaternary Pump
G7129A
DEAEQ56216 1260 Infinity II Vialsampler
📄
Description
1260 Infinity II Quaternary Pump
📞
Call Description
JAN 2026 LC PM
📅
WO-01324228 - Preventive Maintenance - G7111B - Dallas - PETNET Solutions
Jan 29, 2026 12:00pm – 5:00pm
Work Order: WO-01324228
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008156959
Location: PETNET Solutions
Address: 1350 Manufacturing St Ste 1, Dallas, TX 75207
Manufacturer:
Model #: G7111B
Serial #: DEAEW12352
Contact Name: Pinkey Rahman
Contact Phone: 214-741-2075
Contact Email: pi
Timeline
📞
📋
Work Order:
WO-01324228
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
🗓️
📅
Scheduled For:
2026-01-26T17:00:00.000+0000
📅
Scheduled For:
2026-01-21T17:00:00.000+0000
📅
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
47d 7h
🚗
Type:
Travel, Parts
Status:
Open
Qty:
53, 52, 1
💵
⏱️
Type:
Labor
Status:
Open
Qty:
2.5
⏱️
Type:
Labor
Status:
Open
Qty:
4.5
⏱️
Type:
Labor
Status:
Open
Qty:
2.5
🔩
Type:
Parts
Status:
Open
Qty:
1
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
3d 3h
🏁
From:
Completed
To:
Closed
Duration in Previous:
7m
🔩
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
1d 12h
💵
From:
Ready to Bill
To:
Billing Review
Duration in Previous:
6h 47m
📄
From:
Billing Review
To:
Ready to Bill
Duration in Previous:
14d 6h
📨
🧾
Invoice Number:
SM-255302
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
2m
Bottlenecks
Assigned
Duration: 5.0 business days (threshold: 4.0 business hours)
Exceeded by 4.5 business days
Scheduled
Duration: 31.0 business days (threshold: 2.0 business days)
Exceeded by 29.0 business days
Tech On Site
Duration: 1.4 business days (threshold: 1.0 business days)
Exceeded by 3.2 business hours
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Billing Review
Duration: 9.9 business days (threshold: 2.0 business days)
Exceeded by 7.9 business days
Ready to Bill
Duration: 9.0 business days (threshold: 1.0 business days)
Exceeded by 8.0 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Jan 29, 12:00 PM
Work Details (12)
Name
Type
Status
Qty
Amount
Date
WL-03084873
Travel
Open
53
$359.00
Jan 30, 11:25 AM
WL-03084874
Travel
Open
52
$0.00
Jan 30, 11:25 AM
WL-03084875
Parts
Open
1
$0.00
Jan 30, 11:25 AM
WL-03084876
Parts
Open
1
$0.00
Jan 30, 11:25 AM
WL-03084877
Parts
Open
1
$0.00
Jan 30, 11:25 AM
WL-03084878
Parts
Open
1
$0.00
Jan 30, 11:25 AM
WL-03087248
Expenses
Open
1
$0.00
Feb 1, 8:04 PM
WL-03087249
Labor
Open
2.5
$0.00
Feb 1, 8:06 PM
WL-03087250
Labor
Open
4.5
$456.00
Feb 1, 8:08 PM
WL-03087252
Labor
Open
2.5
$0.00
Feb 1, 8:09 PM
WL-03087269
Parts
Open
1
$0.00
Feb 1, 8:24 PM
WL-03089169
Parts
Open
1
$0.00
Feb 3, 9:37 AM