MCALESTER ARMY AMMUNITION PLANT • Evaluation • P7

📍 McAlester Army Ammunition Plant — 1c-Tree Road Bldg.408, Mcalester OK, 74501

Dec 16, 2025 → Dec 20, 2025

✅ Completed
P7
SLA Clock
7 business days from creation · Target: Dec 26, 2025
✓ SLA Met (4 biz days early)
Active: 3 biz days
Budget: 7 biz days
🕐 Clock stopped: Completed (Dec 20, 2025)
SLA Target
▶ Clock Running
Status: Created
Dec 16 → Dec 16, 2025
0 business days (counted)
Running total: 0 of 7 biz days used
▶ Clock Running
Status: Ready for Scheduling
Dec 16 → Dec 16, 2025
0 business days (counted)
Running total: 0 of 7 biz days used
2d
▶ Clock Running
Status: Assigned
Dec 16 → Dec 18, 2025
2 business days (counted)
Running total: 2 of 7 biz days used
1d
▶ Clock Running
Status: Scheduled
Dec 18 → Dec 19, 2025
1 business day (counted)
Running total: 3 of 7 biz days used
0d
▶ Clock Running
Status: Tech On Site
Dec 19 → Dec 20, 2025
0 business days (counted)
Running total: 3 of 7 biz days used
Created: Dec 16, 2025 Completed: Dec 20, 2025
Business Days Used 3 / 7
0 7d budget
Show SLA Clock Detail (5 periods)
Period Status Clock Biz Days Running Total
Dec 16 → Dec 16 Created ▶ Running 0 0 / 7
Dec 16 → Dec 16 Ready for Scheduling ▶ Running 0 0 / 7
Dec 16 → Dec 18 Assigned ▶ Running 2 2 / 7
Dec 18 → Dec 19 Scheduled ▶ Running 1 3 / 7
Dec 19 → Dec 20 Tech On Site ▶ Running 0 3 / 7
Dispatch 0.0d
Coordinators 5.1d
Field Work 0.8d
✓ SLA Met
Dispatch
0.0 days
Coordinators
5.1 days
Over SLA
Field Work
0.8 days
Created: Dec 16, 2025 Due: Dec 26, 2025 Completed: Dec 20, 2025 (6 days early)
📅
4.0 days Total Age
⏱️
3.0d in Assigned Longest Stage
🔄
6 transitions Status Changes
⚠️
3.5d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
5 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00551622
EMS L2 Review * no quote needed unitl parts are determiend.
Closed
Request from Darrell Hendrix Customer has a Stryker power load that he arms will not go up or down and will not load a cot. Customer is using unit in manual mode need service ASAP The technician will need to evaluate the unit and determine if parts are needed for repairs. https://www.ebiotrack.com/workorder.php?wo=70394
Priority
Critical
Origin
Email
Reason
New Case
Contact
Travis Peevyhouse
Owner
Sherry Reich
Created
Dec 15, 2025
Work Orders from this Case (1)
WO-01326693 (current) Invoiced
Evaluation • Darrell Hendrix
Created: Dec 16, 2025 • Closed: Dec 20, 2025
Completed with minor delays
Invoiced • 78 days old
🚨
Primary Delay 3.0 days stuck in "Assigned"
⏱️
Total Delay 3.5 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
0.1d / 1.0d SLA
Assigned
3.0d / 0.5d SLA
Scheduled
1.9d / 2.0d SLA
Tech On Site
0.8d / 1.0d SLA
Closed
2.0d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

12/18 KKelch Travis called me back to schedule for 12/19 between 9 and 11 am. Customer confirmed. 

12/16 KKelch called Travis to schedule for 12/17 between 11and 1 pm. Left VM.

🔧 Work Performed
I arrived on location and found said unit. Meet with Travis POC. I then removed the cot from the truck. I hten went to the front of the trucked and pushed red button and lifted arm on the trolley and then rolled the trolley out of the truck. I did notice that the unit had green light on the front and where the power ON/OFF is. I then went to the rear of the truck and the yellow lights on the wings are flashing. I then took the cot and loaded it in the trolley and lights did change from yellow to green. I then pressed the minus button of the cot and the arms on the trolley started goring up. I then pushed the unit into the truck and then cot dropped down and locked and unit was function to manufactures specifications. Customer stated that the cot would not power on.. I hten loaded and unloaded the cot in and out of the truck about 7 times and had no problems. We then took the truck over to the area where it was stored and I checked that the light still flash when the truck is plugged in to shore line and unit was function to manufactures specifications. I advised Travis that we could not duplicate any issues at this time and that we should evaluate the unit for the next week to see if problem comes back customer agree. Unit was placed b ack in service.
🔍 Technician Findings
Customer stated that unit is dead and no light come on the left and right wing and arms wil not lift.
⚠️ Problem Description
Request from Darrell Hendrix Customer has a Stryker power load that he arms will not go up or down and will not load a cot. Customer is using unit in manual mode need service ASAP The technician will need to evaluate the unit and determine if parts are needed for repairs. https://www.ebiotrack.com/workorder.php?wo=70394
📄 Description
Stryker 6390 Power-LOAD Fastener System

Timeline

📞
Case Linked Dec 15, 9:58 AM
Case Number: 00551622
Subject: EMS L2 Review * no quote needed unitl parts are determiend.
Status: Closed
📋
2 Work Order Created Dec 16, 9:06 AM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Sherry Reich
From: Entered
To: Ready for Scheduling
Duration in Previous: 1m
👷
2 Status: Assigned Dec 16, 10:15 AM
Status: Assigned → Technician Assigned
👷
Technician Assigned by Kaitlyn Kelch
Technician: Darrell Hendrix
3.0 business days
🗓️
2 Status: Scheduled Dec 18, 11:39 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2025-12-19T15:00:00.000+0000
2.0 business days
🔧
Status: Tech On Site by Darrell Hendrix Dec 19, 12:36 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 1d 0h
⏱️
2 5x Labor Added Dec 20, 12:05 AM
5x Labor Added → Status: Completed
✔️
Status: Completed by Darrell Hendrix
From: Tech On Site, Completed
To: Completed, Closed
Duration in Previous: 11h 29m, 0m
2.0 business days
📄
2 Status: Ready to Bill Dec 23, 12:33 PM
Status: Ready to Bill → Invoice Created
🧾
Invoice Created
Invoice Number: SM-249827

Bottlenecks

Assigned
Duration: 3.0 business days (threshold: 4.0 business hours)
Exceeded by 2.5 business days
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days

🔗 Related Artifacts

📞
Case 00551622
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
P7
Type
Evaluation
Branch
ERLA - PROD
Technician
Darrell Hendrix
Scheduled
Dec 19, 10:00 AM
Created
Dec 16, 9:06 AM
Invoice #
SM-249827

Work Details (5)

Name Type Status Qty Amount Date
WL-03044324 Labor Open 3 $0.00 Dec 20, 12:05 AM
WL-03044325 Labor Open 2 $0.00 Dec 20, 12:05 AM
WL-03044326 Labor Open 2.5 $0.00 Dec 20, 12:05 AM
WL-03044327 Travel Open 145 $0.00 Dec 20, 12:05 AM
WL-03044328 Travel Open 145 $0.00 Dec 20, 12:05 AM