Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Jan 31, 2026
✓ SLA Met (9 biz days early)
🕐 Clock stopped: Tech Off Site (Jan 16, 2026)
▶ Clock Running
Status: Created
Dec 17 → Dec 17, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Dec 17 → Dec 17, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Dec 17 → Dec 18, 2025
1 business day (counted)
Running total: 1 of ? biz days used
18d
▶ Clock Running
Status: Scheduled
Dec 18 → Jan 15, 2026
18 business days (counted)
Running total: 19 of ? biz days used
▶ Clock Running
Status: Tech On Site
Jan 15 → Jan 16, 2026
1 business day (counted)
Running total: 20 of ? biz days used
Created: Dec 17, 2025
Tech Off Site: Jan 16, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Dec 17 → Dec 17
Created
▶ Running
0
0
Dec 17 → Dec 17
Ready for Scheduling
▶ Running
0
0
Dec 17 → Dec 18
Assigned
▶ Running
1
1
Dec 18 → Jan 15
Scheduled
▶ Running
18
19
Jan 15 → Jan 16
Tech On Site
▶ Running
1
20
Coordinators
20.0 days
Over SLA
Field Work
2.8 days
Over SLA
Billing
13.0 days
Over SLA
Created: Dec 17, 2025
Due: Jan 31, 2026
Completed: Jan 17, 2026 (14 days early)
⏱️
19.0d in Scheduled
Longest Stage
🔄
8 transitions
Status Changes
⚠️
30.4d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00552385
6008293397
Closed
28R
SYS-GM-5975T
Contract ends 07/31/2026 repair included
PM
G4514A
CN11520028 7693A Tray, 150 Vial
G3440A
CN12111037 Agilent 7890A Series GC Custom
G3171A
US12122A28 5975C inert MSD Std. turbo EI mainframe
G4513A
CN13050072 7693A Autoinjector
🚨
Primary Delay
19.0 days stuck in "Scheduled"
⏱️
Total Delay
30.4 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
19.0d
/ 2.0d SLA
Tech On Site
1.8d
/ 1.0d SLA
Tech Off Site
1.0d
/ 2.0d SLA
Ready to Bill
13.0d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📅 Events (1)
🔒
Internal CSA Notes
01/16 Following up/Call support. NO travel mileage and zone. MD
01/15 Second call of today. Travel, mileage and zone are on WO-01312888 . MD
Please assign to Maria Davis ARP to site is 65 miles. Zone 2
🔧
Work Performed
01/16/2026 After following up, "Sap states that GCMS is working OK and is back in operation"
01/15/2026 At arrival customer mentioned that chromatogram wasn't showing one peak. GCMS #10 PM was completed per Agilent. MS was tuned and vented. Ion source was cleaned; rough pump oil, GC parts and gas filter were replaced. System was pump down and stabilize for some time. After some time, H2O and N2 were above the limit, no air leak although. System will bake out overnight and customer will run check samples on 01/16.
⚠️
Problem Description
28R
SYS-GM-5975T
Contract ends 07/31/2026 repair included
PM
G4514A
CN11520028 7693A Tray, 150 Vial
G3440A
CN12111037 Agilent 7890A Series GC Custom
G3171A
US12122A28 5975C inert MSD Std. turbo EI mainframe
G4513A
CN13050072 7693A Autoinjector
📄
Description
GCMS 5975 Turbo System
📞
Call Description
JAN 2026 GC PM
📅
WO-01326968 - Preventive Maintenance - SYS-GM-5975T - Irving - Quest Diagnostics Incorporated
Jan 26, 2026 11:00am – 4:00pm
Work Order: WO-01326968
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008293397
Location: Quest Diagnostics Incorporated
Address: 4770 Regent Blvd, Irving, TX 75063
Manufacturer: Agilent Technologies
Model #: SYS-GM-5975T
Serial #: S-QUES-GCMS-25731140799
Contact Name: Jesika Patel
Cont
Timeline
📞
📋
Work Order:
WO-01326968
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
🗓️
📅
Scheduled For:
2026-01-16T16:00:00.000+0000
📅
Scheduled For:
2026-01-26T16:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
28d 16h
🔩
Type:
Parts
Status:
Open
Qty:
1, 2
🚗
From:
Tech On Site
To:
Tech Off Site
Duration in Previous:
19h 38m
⏱️
Type:
Labor
Status:
Open
Qty:
5
💵
✔️
From:
Tech Off Site, Completed
To:
Completed, Closed
Duration in Previous:
11h 10m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
2d 21h
📨
🧾
Invoice Number:
SM-253062
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
4m
Bottlenecks
Assigned
Duration: 1.0 business days (threshold: 4.0 business hours)
Exceeded by 4.4 business hours
Scheduled
Duration: 19.0 business days (threshold: 2.0 business days)
Exceeded by 17.0 business days
Tech On Site
Duration: 1.8 business days (threshold: 1.0 business days)
Exceeded by 6.7 business hours
Ready to Bill
Duration: 13.0 business days (threshold: 1.0 business days)
Exceeded by 12.0 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Jan 26, 11:00 AM
Work Details (8)
Name
Type
Status
Qty
Amount
Date
WL-03066629
Parts
Open
1
$0.00
Jan 15, 3:29 PM
WL-03066630
Parts
Open
1
$0.00
Jan 15, 3:29 PM
WL-03066631
Parts
Open
1
$0.00
Jan 15, 3:29 PM
WL-03066632
Parts
Open
1
$0.00
Jan 15, 3:29 PM
WL-03066633
Parts
Open
1
$0.00
Jan 15, 3:29 PM
WL-03066634
Parts
Open
2
$0.00
Jan 15, 3:29 PM
WL-03067967
Labor
Open
5
$570.00
Jan 16, 12:41 PM
WL-03068751
Expenses
Open
1
$0.00
Jan 16, 7:04 PM