Please assign to Jared Rappaport
ARP to site is 17 miles. Zone 1
🔧Work Performed
Repaired Agilent pump (system pressure test failed after PM maintenance)
🔍Technician Findings
Following pump maintenance performed under PM SO 6008205181, a system pressure test failed at the pump. Under high-pressure conditions, leaks were observed at the mixing capillary fitting on the B-channel pump head and at the pressure sensor fitting on the capillary connecting the mixing capillary to the pressure sensor. The system was configured with the damper and mixer bypassed. Both capillaries were found to be defective and were replaced with like-for-like parts. The system pressure test was re-performed and passed.
⚠️Problem Description
15K
SYS-LC-1260
WO82493884:SYSTEM PRESSURE TEST FAILS
📄Description
1260 Binary Pump
📞Call Description
Jan 2026 LC REPAIR
TEXT
servlet
Jan 6, 2026
MSG
LRM Service Request FormWO 82493884DEACB05119
Jan 6, 2026
Timeline
📞
Case Linked Jan 6, 8:19 AM
Case Number:00556276
Subject:6008346351
Status:Closed
📋
▶
3
Work Order Created Jan 6, 8:25 AM
Work Order Created → Status: Ready for Scheduling → Technician Assigned
📅
Status: Ready for Scheduling by Leona Coonrod
From:Entered, Ready for Scheduling
To:Ready for Scheduling, Assigned
Duration in Previous:0m
👷
Technician Assigned by Leona Coonrod
Technician:Jared Rappaport
🔧
▶
2
Status: Tech On Site Jan 6, 11:31 AM
Status: Tech On Site → 2x Labor Added
⏱️
2x Labor Added
Type:Labor, Travel
Status:Open
Qty:0.5, 17
🔩
2x Parts Added Jan 6, 11:40 AM
Type:Parts
Status:Open
Qty:1
⏱️
▶
3
Labor Added Jan 6, 1:37 PM
Labor Added → Status: Completed → Status: Closed
✔️
Status: Completed by Jared Rappaport
From:Tech On Site
To:Completed
Duration in Previous:2h 6m
🏁
Status: Closed by Jared Rappaport
From:Completed
To:Closed
Duration in Previous:3m
📄
Status: Ready to Bill by Hannah ShawJan 7, 11:06 AM
From:Closed
To:Ready to Bill
Duration in Previous:21h 23m
🚨10.0 business days
💵
▶
2
Status: Billing Review Jan 21, 10:01 AM
Status: Billing Review → Status: Ready to Bill
📄
Status: Ready to Bill by Hannah Shaw
From:Billing Review
To:Ready to Bill
Duration in Previous:2m
⚠️6.0 business days
📨
▶
3
Status: Invoice Pending Jan 28, 1:41 PM
Status: Invoice Pending → Status: Invoiced → Invoice Created
💰
Status: Invoiced by Hannah Shaw
From:Invoice Pending
To:Invoiced
Duration in Previous:1m
🧾
Invoice Created
Invoice Number:SM-252436
Bottlenecks
Closed
Duration: 1.7 business days (threshold: 1.0 business days)
Exceeded by 5.3 business hours
Ready to Bill
Duration: 10.0 business days (threshold: 1.0 business days)
Exceeded by 9.0 business days
Ready to Bill
Duration: 6.0 business days (threshold: 1.0 business days)