Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01337324 ↗ ServiceMax

COVETRUS • Repair • P3

📍 SPCA FOR MONTEREY COUNTY — 1002 Monterey Salinas Hwy, Salinas CA, 93908

Jan 12, 2026 → Feb 19, 2026

✅ Completed
P3
SLA Clock
3 business days from creation · Target: Jan 15, 2026
✗ SLA Missed (19 biz days late)
Active: 22 biz days
Paused: 5 biz days
Budget: 3 biz days
🕐 Clock stopped: Completed (Feb 20, 2026)
SLA Target
▶ Clock Running
Status: Created
Jan 12 → Jan 12, 2026
0 business days (counted)
Running total: 0 of 3 biz days used
▶ Clock Running
Status: Ready for Scheduling
Jan 12 → Jan 12, 2026
0 business days (counted)
Running total: 0 of 3 biz days used
▶ Clock Running
Status: Assigned
Jan 12 → Jan 13, 2026
1 business day (counted)
Running total: 1 of 3 biz days used
▶ Clock Running
Status: Scheduled
Jan 13 → Jan 15, 2026
2 business days (counted)
Running total: 3 of 3 biz days used
▶ Clock Running
Status: Tech On Site
Jan 15 → Jan 15, 2026
0 business days (counted)
Running total: 3 of 3 biz days used
⏸4d
⏸ Clock Paused
Status: Awaiting Parts
Jan 15 → Jan 22, 2026
4 business days (not counted)
4d
▶ Clock Running
Status: Reschedule
Jan 22 → Jan 28, 2026
4 business days (counted)
Running total: 7 of 3 biz days used
▶ Clock Running
Status: Scheduled
Jan 28 → Jan 28, 2026
0 business days (counted)
Running total: 7 of 3 biz days used
▶ Clock Running
Status: Tech On Site
Jan 28 → Jan 30, 2026
2 business days (counted)
Running total: 9 of 3 biz days used
▶ Clock Running
Status: Completed
Jan 30 → Jan 30, 2026
0 business days (counted)
Running total: 9 of 3 biz days used
1d
▶ Clock Running
Status: Incomplete
Jan 30 → Feb 2, 2026
1 business day (counted)
Running total: 10 of 3 biz days used
▶ Clock Running
Status: L2 Screening
Feb 2 → Feb 2, 2026
0 business days (counted)
Running total: 10 of 3 biz days used
⏸ Clock Paused
Status: Awaiting Parts
Feb 2 → Feb 3, 2026
1 business day (not counted)
6d
▶ Clock Running
Status: Ready for Scheduling
Feb 3 → Feb 11, 2026
6 business days (counted)
Running total: 16 of 3 biz days used
5d
▶ Clock Running
Status: Scheduled
Feb 11 → Feb 19, 2026
5 business days (counted)
Running total: 21 of 3 biz days used
▶ Clock Running
Status: Tech On Site
Feb 19 → Feb 20, 2026
1 business day (counted)
Running total: 22 of 3 biz days used
Created: Jan 12, 2026 Completed: Feb 20, 2026
Business Days Used 22 / 3
0 3d budget +19d over
Show SLA Clock Detail (16 periods)
Period Status Clock Biz Days Running Total
Jan 12 → Jan 12 Created ▶ Running 0 0 / 3
Jan 12 → Jan 12 Ready for Scheduling ▶ Running 0 0 / 3
Jan 12 → Jan 13 Assigned ▶ Running 1 1 / 3
Jan 13 → Jan 15 Scheduled ▶ Running 2 3 / 3
Jan 15 → Jan 15 Tech On Site ▶ Running 0 3 / 3
Jan 15 → Jan 22 Awaiting Parts ⏸ Paused 4
Jan 22 → Jan 28 Reschedule ▶ Running 4 7 / 3
Jan 28 → Jan 28 Scheduled ▶ Running 0 7 / 3
Jan 28 → Jan 30 Tech On Site ▶ Running 2 9 / 3
Jan 30 → Jan 30 Completed ▶ Running 0 9 / 3
Jan 30 → Feb 2 Incomplete ▶ Running 1 10 / 3
Feb 2 → Feb 2 L2 Screening ▶ Running 0 10 / 3
Feb 2 → Feb 3 Awaiting Parts ⏸ Paused 1
Feb 3 → Feb 11 Ready for Scheduling ▶ Running 6 16 / 3
Feb 11 → Feb 19 Scheduled ▶ Running 5 21 / 3
Feb 19 → Feb 20 Tech On Site ▶ Running 1 22 / 3
Dispatch 0.2d
Material Management 5.3d
Coordinators 22.6d
Field Work 2.5d
Incomplete 2.0d (excluded)
Billing 0.0d
✗ SLA Missed
Dispatch
0.2 days
Material Management
5.3 days
Over SLA
Coordinators
22.6 days
Over SLA
Field Work
2.5 days
Over SLA
Incomplete (excluded from total)
2.0 days
Billing
0.0 days
Created: Jan 12, 2026 Due: Feb 12, 2026 Completed: Feb 20, 2026 (7 days late)
📅
27.3 days Total Age
⏱️
7.0d in Ready for Scheduling Longest Stage
🔄
18 transitions Status Changes
⚠️
18.5d over Total Delay
📦
2 orders, 0 quotes Parts & Quotes
📝
22 lines Work Details
🚩
3 visits On-Site Trips
👤
Self-Scheduled Scheduling
🚩
3 On-Site Visits (1 reschedule)
3 on-site visits — why were multiple trips needed?
👤 Self-scheduled by Angel Rios — scheduling delays attributed to technician, not coordinators
Visit 1 Jan 15, 2026
Visit 2 Jan 28, 2026
Visit 3 Feb 19, 2026

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00557378
L2 Review - Healthcare
Closed
Q-00031959 1 PM & 1 Repair WO Covetrus Account #: 5360000-002 Number of machines to service: 2 Brand of machine(s) to service: MidMark Please describe the issue you are experiencing: M11-043/V2552112 - when starting up in the morning we immediately receive an over heating error at 240 degrees. M11-020/V1100597 - preventative servicing needed. Part needed 1ea PM Kit 002-10070-00
Priority
Standard
Origin
Email
Reason
New Case
Contact
Ashley Fessenden
Owner
Jessica Sells
Created
Jan 8, 2026
Work Orders from this Case (2)
WO-01337324 (current) Invoiced
Repair • Angel Rios
Created: Jan 12, 2026 • Closed: Feb 19, 2026
WO-01337328 Invoiced
Preventive Maintenance • Angel Rios
Created: Jan 12, 2026 • Closed: Jan 28, 2026
Completed with significant delays
Invoiced • 51 days old
🚨
Primary Delay 7.0 days stuck in "Ready for Scheduling"
⏱️
Total Delay 18.5 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
7.0d / 1.0d SLA
Assigned
1.7d / 0.5d SLA
Scheduled
9.4d / 2.0d SLA
Tech On Site
2.1d / 1.0d SLA
Awaiting Parts
5.3d / 3.0d SLA
Reschedule
4.5d / 2.0d SLA
Incomplete
2.0d
L2 Screening
0.2d / 1.0d SLA
Completed
0.5d / 1.0d SLA
Closed
3.5d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

2-11 Mburris call from Ashley to set 2-19 1pm said that would best day for tech

2/4/26 RBerry- Updated due date based on parts. Removed delay code.



1/30 KWeiss, Created case and sent to sales for quoting.

1/29 ARios - Midmark technical support advised the autoclave requires a new control PCB, part number 002-2063-00. Contacted the customer, clinic manager Ashley Fessender at 209-631-9685, and they requested a quote for the repair including parts and labor.

1/28 ARios - Need to contact Midmark technical support tomorrow to confirm whether unit needs a new Main PC Board.

1-28  Mburris called set appt w/ Ashley for 1-28

1-13 Mburris call spoke with Ashley and set for 1-15 between 9am and 11am

🔧 Work Performed
1/15 Completed preventive maintenance service on Midmark M11-020 autoclave (SN: V1100597) using PM kit from trunk stock. Ran a full test cycle and confirmed proper operation. The unit completed the cycle successfully with no issues observed. Performed troubleshooting on Midmark M11-043 autoclave (SN: V2552112) due to the unit not completing a cycle. Confirmed the unit starts the cycle displaying a temperature of approximately 240°F and then fails. Checked resistance on the temperature sensor and found it slightly out of range at room temperature. Acceptable range is 1.07 to 1.10 kΩ and the measured value was 1.2 kΩ. Verified voltage at the control board for the temperature sensor and found it to be within specification. Contacted Midmark technical support and they recommended replacing the temperature sensor. They advised the issue could also be related to the control board, but recommended replacing the temperature sensor first. Spoke to Julio Gomez here at SPCA in regards to the needed part and he approved the purchase of a replacement sensor. 1/28 Replaced the temperature sensor and ran a test cycle, temperature now reads above 240°F but chamber pressure remains at 0 PSI. The unit reached approximately 270°F and vented steam, however PSI never increased above 0. Contacted Midmark technical support and was advised to confirm voltage to the pressure transducer from the main PC board, measured approximately 5 VDC which is within the specified range of 4 to 6 VDC. Also confirmed the transducer hose is sloped downward as advised. Ran another test cycle with the same result of temperature above 240°F and 0 PSI. Removed and cleaned the air valve and vent valve, and removed and cleaned the hose connected to the pressure transducer. Ran an additional test cycle with no change. Even when pinching the transducer hose during operation, the pressure remained at 0 PSI. Based on troubleshooting performed, the pressure transducer is suspected to be faulty. Since the transducer is soldered to the main PC board, the board will likely require replacement. Midmark technical support was closed after troubleshooting was completed and could not be reached for confirmation at that time, I will contact Midmark technical support tomorrow to confirm whether the issue is with the main PC board. 2/19 Replaced and configured the main control PC board. Ran a test cycle and verified the autoclave is now detecting and displaying PSI on the screen. The unit successfully completed a test sterilization cycle.
🔍 Technician Findings
1/15 Perform Preventative Maintenance Service on M11-020/V1100597 Troubleshoot failed cycle issue on M11-043/V2552112 1/28 Arrived on site to replace Temperature sensor on M11-043 Sterilizer (SN: V2552112) 2/19 Arrived on site and customer provided the main control PC board for replacement.
⚠️ Problem Description
Q-00032275 Midmark M11 (Series) V2552112 Midmark technical support advised the autoclave requires a new control PCB, part number 002-2063-00. Contacted the customer, clinic manager Ashley Fessender at 209-631-9685, and they requested a quote for the repair including parts and labor. Q-00031959 1 PM & 1 Repair WO Covetrus Account #: 5360000-002 Number of machines to service: 2 Brand of machine(s) to service: MidMark Please describe the issue you are experiencing: M11-043/V2552112 - when starting up in the morning we immediately receive an over heating error at 240 degrees. M11-020/V1100597 - preventative servicing needed. Part needed 1ea PM Kit 002-10070-00
📄 Description
Midmark Model M11 (Series) Self Contained Steam Sterilizer (Includes ALL M11 Models)

Timeline

📞
Case Linked Jan 8, 5:27 PM
Case Number: 00557378
Subject: L2 Review - Healthcare
Status: Closed
2.8 business days
📋
2 Work Order Created Jan 12, 12:49 PM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Jessica Sells
From: Entered
To: Ready for Scheduling
Duration in Previous: 0m
👷
2 Technician Assigned Jan 12, 1:28 PM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Michael Burris
From: Ready for Scheduling
To: Assigned
Duration in Previous: 39m
👷
Technician Assigned by Michael Burris Jan 12, 1:37 PM
Technician: a0h8Y00000JjGEfQAN, Angel Rios
📅
2 Dispatch Scheduled Jan 13, 12:50 PM
Dispatch Scheduled → Status: Scheduled
🗓️
Status: Scheduled by Michael Burris
From: Assigned
To: Scheduled
Duration in Previous: 23h 22m
3.0 business days
🔧
Status: Tech On Site by Angel Rios Jan 15, 3:04 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 2d 2h
🚗
4 5x Travel Added Jan 15, 5:57 PM
5x Travel Added → Expenses Added → Parts Requested → Status: Awaiting Parts
💵
Expenses Added
Type: Expenses
Status: Open
Qty: 1
📦
Parts Requested
Order: 00088432
Status: Closed
📦
Status: Awaiting Parts by Angel Rios
From: Tech On Site
To: Awaiting Parts
Duration in Previous: 2h 57m
4.7 business days
🔩
2 2x Parts Added Jan 22, 3:06 PM
2x Parts Added → Status: Reschedule
🔄
Status: Reschedule by MELISSA BARRETT
From: Awaiting Parts
To: Reschedule
Duration in Previous: 6d 21h
⚠️ 5.0 business days
🗓️
2 Status: Scheduled Jan 28, 12:02 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Michael Burris
Scheduled For: 2026-01-28T21:30:00.000+0000
🔧
Status: Tech On Site by Angel Rios Jan 28, 5:23 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 5h 20m
⏱️
2x Labor Added Jan 28, 8:55 PM
Type: Labor, Travel
Status: Open
Qty: 0.75, 15
⏱️
Labor Added Jan 28, 10:08 PM
Type: Labor
Status: Open
Qty: 3
⏱️
3x Labor Added Jan 29, 1:39 AM
Type: Labor, Travel, Expenses
Status: Open
Qty: 4.25, 18
✔️
Status: Completed by Angel Rios Jan 29, 8:57 PM
From: Tech On Site, Completed
To: Completed, Incomplete
Duration in Previous: 1d 3h, 0m
2.4 business days
🔍
Status: L2 Screening by Jessica Sells Feb 2, 4:20 PM
From: Incomplete
To: L2 Screening
Duration in Previous: 3d 19h
📦
2 Parts Requested Feb 2, 5:51 PM
Parts Requested → Status: Awaiting Parts
📦
Status: Awaiting Parts by Keith Weiss
From: L2 Screening
To: Awaiting Parts
Duration in Previous: 1h 31m
📅
2 Status: Ready for Scheduling Feb 3, 11:21 AM
Status: Ready for Scheduling → 2x Parts Added
🔩
2x Parts Added
Type: Parts, Expenses
Status: Open
Qty: 1
⚠️ 7.0 business days
🗓️
2 Status: Scheduled Feb 11, 10:56 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Michael Burris
Scheduled For: 2026-02-19T21:00:00.000+0000
⚠️ 6.0 business days
🔧
Status: Tech On Site by Angel Rios Feb 19, 5:19 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 8d 6h
⏱️
2x Labor Added Feb 19, 6:15 PM
Type: Labor, Travel
Status: Open
Qty: 0.5
⏱️
2 Labor Added Feb 19, 7:20 PM
Labor Added → Status: Completed
✔️
Status: Completed by Angel Rios
From: Tech On Site
To: Completed
Duration in Previous: 2h 2m
⏱️
2 2x Labor Added Feb 19, 11:09 PM
2x Labor Added → Status: Closed
🏁
Status: Closed by Angel Rios
From: Completed
To: Closed
Duration in Previous: 3h 48m
3.1 business days
💵
Expenses Added Feb 24, 11:02 PM
Type: Expenses
Status: Open
Qty: 1
📄
3 Status: Ready to Bill Feb 24, 11:20 PM
Status: Ready to Bill → Status: Invoiced → Invoice Created
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 1m
🧾
Invoice Created
Invoice Number: SM-254819

Bottlenecks

Assigned
Duration: 1.7 business days (threshold: 4.0 business hours)
Exceeded by 1.2 business days
Scheduled
Duration: 2.8 business days (threshold: 2.0 business days)
Exceeded by 6.2 business hours
Awaiting Parts
Duration: 4.1 business days (threshold: 3.0 business days)
Exceeded by 1.1 business days
Reschedule
Duration: 4.5 business days (threshold: 2.0 business days)
Exceeded by 2.5 business days
Tech On Site
Duration: 1.4 business days (threshold: 1.0 business days)
Exceeded by 3.6 business hours
Ready for Scheduling
Duration: 7.0 business days (threshold: 1.0 business days)
Exceeded by 6.0 business days
Scheduled
Duration: 6.0 business days (threshold: 2.0 business days)
Exceeded by 4.0 business days
Closed
Duration: 3.5 business days (threshold: 1.0 business days)
Exceeded by 2.5 business days

🔗 Related Artifacts

📞
Case 00557378
Closed
📦
Parts Order 00088432
Closed
📦
Parts Order 00089536
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
P3
Type
Repair
Branch
ERLA - PROD
Technician
Angel Rios
Scheduled
Feb 19, 4:00 PM
Created
Jan 12, 12:49 PM
Invoice #
SM-254819

Work Details (22)

Name Type Status Qty Amount Date
WL-03066976 Travel Open 180 $113.40 Jan 15, 5:57 PM
WL-03066972 Parts Open 1 $405.00 Jan 15, 5:57 PM
WL-03066973 Labor Open 5 $595.00 Jan 15, 5:57 PM
WL-03066974 Labor Open 1.25 $148.75 Jan 15, 5:57 PM
WL-03066975 Labor Open 2 $238.00 Jan 15, 5:57 PM
WL-03067007 Expenses Open 1 $0.00 Jan 15, 5:59 PM
WL-03075292 Parts Open 1 $229.50 Jan 22, 3:06 PM
WL-03075296 Expenses Open 1 $19.44 Jan 22, 3:06 PM
WL-03082652 Labor Open 0.75 $0.00 Jan 28, 8:55 PM
WL-03082653 Travel Open 15 $80.00 Jan 28, 8:55 PM
WL-03082737 Labor Open 3 $357.00 Jan 28, 10:08 PM
WL-03082934 Labor Open 4.25 $0.00 Jan 29, 1:39 AM
WL-03082935 Travel Open 18 $0.00 Jan 29, 1:39 AM
WL-03082936 Expenses Open 1 $0.00 Jan 29, 1:39 AM
WL-03089290 Parts Open 1 $2,212.31 Feb 3, 11:24 AM
WL-03089291 Expenses Open 1 $27.64 Feb 3, 11:24 AM
WL-03112733 Labor Open 0.5 $0.00 Feb 19, 6:15 PM
WL-03112734 Travel Open 5 $80.00 Feb 19, 6:15 PM
WL-03112926 Labor Open 2 $238.00 Feb 19, 7:20 PM
WL-03113303 Labor Open 4 $0.00 Feb 19, 11:09 PM
WL-03113304 Travel Open 180 $0.00 Feb 19, 11:09 PM
WL-03118899 Expenses Open 1 $17.31 Feb 24, 11:02 PM

Details