Work Order 360 View
Detailed work order timeline, KPIs, and analysis
P5
SLA Clock
5 business days from creation · Target: Feb 5, 2026
✗ SLA Missed (5 biz days late)
🕐 Clock stopped: Completed (Feb 12, 2026)
SLA Target
▶ Clock Running
Status: Created
Jan 29 → Jan 29, 2026
0 business days (counted)
Running total: 0 of 5 biz days used
▶ Clock Running
Status: Ready for Scheduling
Jan 29 → Jan 29, 2026
0 business days (counted)
Running total: 0 of 5 biz days used
3d
▶ Clock Running
Status: Assigned
Jan 29 → Feb 3, 2026
3 business days (counted)
Running total: 3 of 5 biz days used
7d
▶ Clock Running
Status: Scheduled
Feb 3 → Feb 12, 2026
7 business days (counted)
Running total: 10 of 5 biz days used
▶ Clock Running
Status: Tech On Site
Feb 12 → Feb 12, 2026
0 business days (counted)
Running total: 10 of 5 biz days used
Created: Jan 29, 2026
Completed: Feb 12, 2026
Business Days Used
10 / 5
0
5d budget
+5d over
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 29 → Jan 29
Created
▶ Running
0
0 / 5
Jan 29 → Jan 29
Ready for Scheduling
▶ Running
0
0 / 5
Jan 29 → Feb 3
Assigned
▶ Running
3
3 / 5
Feb 3 → Feb 12
Scheduled
▶ Running
7
10 / 5
Feb 12 → Feb 12
Tech On Site
▶ Running
0
10 / 5
Coordinators
11.3 days
Over SLA
Created: Jan 29, 2026
Due: Feb 5, 2026
Completed: Feb 13, 2026 (7 days late)
⏱️
8.0d in Scheduled
Longest Stage
🔄
7 transitions
Status Changes
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00563561
FastMed - Lumberton (3300-3337)
Closed
Miscellaneous Equipment Inspection
Missed equpiment.
Audio meter, two manual oxy meters
https://www.ebiotrack.com/inspection.php?iid=32764
🚨
Primary Delay
8.0 days stuck in "Scheduled"
⏱️
Total Delay
9.7 business days over SLA thresholds
SLA vs Actual Time by Status
Ready for Scheduling
0.0d
/ 1.0d SLA
Scheduled
8.0d
/ 2.0d SLA
Tech On Site
0.1d
/ 1.0d SLA
Completed
0.3d
/ 1.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (4)
📋 Tasks (2)
📅 Events (1)
🔒
Internal CSA Notes
2/3 MOwens Alvina replied back that 2/12 will work for the service visit.
2/2 MOwens Sent email to Alvina/ Lizbeth asking to schedule the visit for first available opening on 2/12 in the afternoon.
🔧
Work Performed
2-12-26 CTM - Performed Miscellaneous Equipment inspection on Audio meter , two manual oxy meters. ALL PASS . Notified POC Alvina Hill of completion .
🔍
Technician Findings
2-12-26 CTM - Perform Miscellaneous Equipment inspection on Audio meter , two manual oxy meters . Notify POC Alvina Hill of completion .
⚠️
Problem Description
Miscellaneous Equipment Inspection
Missed equpiment.
Audio meter, two manual oxy meters
https://www.ebiotrack.com/inspection.php?iid=32764
📧
Email:Re: FastMed Lumberton NC Misc. Inspection on Missed Equipment
Completed
Feb 3, 2026
From: ahill@fastmed.com
To: mowens@emsar.com
Cc: lreyes@fastmed.com
Good Evening Melissa that should be fine.
Alvina Hill Center ManagerFrancam Facebook Twitter Instagram Linkedin FastMed.com The materials in this e-mail are private and may contain Protected Health Information. If you are not the intended recipient be advised that any unauthorized use, disclosure, copying, distribution or the taking of any action in reliance on the contents of this information is strictly prohibited.
📧
Email:FastMed Lumberton NC Misc. Inspection on Missed Equipment
Completed
Feb 2, 2026
📅
WO-01340846 - Misc. Inspection - Lumberton - FastMed - Lumberton (3300-3337)
Feb 12, 2026 4:30pm – 5:30pm
Work Order: WO-01340846
Account: FMBCNC, LLC
Customer Case Number:
Location: FastMed - Lumberton (3300-3337)
Address: 5080 Kahn Dr, Suite 120, Lumberton, NC 28358
Manufacturer:
Model #:
Serial #:
Contact Name: Alvina Hill
Contact Phone: 910-354-1281
Contact Email: ahill@fastmed.com
Due Date: 2/5
Timeline
📞
Case Number:
00563561
Subject:
FastMed - Lumberton (3300-3337)
Status:
Closed
📋
📅
From:
Entered
To:
Ready for Scheduling
Duration in Previous:
0m
👷
👷
From:
Ready for Scheduling
To:
Assigned
Duration in Previous:
13m
🗓️
📅
Scheduled For:
2026-02-12T21:30:00.000+0000
⏱️
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
9d 6h
⏱️
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
34m
⏱️
🏁
From:
Completed
To:
Closed
Duration in Previous:
2h 19m
📄
🧾
Invoice Number:
SM-254177
Bottlenecks
Assigned
Duration: 3.2 business days (threshold: 4.0 business hours)
Exceeded by 2.7 business days
Scheduled
Duration: 8.0 business days (threshold: 2.0 business days)
Exceeded by 6.0 business days
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
ℹ️ Work Order Details
Technician
Christopher Morning
Scheduled
Feb 12, 4:30 PM
Work Details (5)
Name
Type
Status
Qty
Amount
Date
WL-03103432
Labor
Open
3
$0.00
Feb 12, 4:50 PM
WL-03103433
Travel
Open
181
-
Feb 12, 4:50 PM
WL-03103532
Labor
Open
0.5
$80.00
Feb 12, 5:24 PM
WL-03103910
Labor
Open
2
$0.00
Feb 12, 7:44 PM
WL-03103911
Travel
Open
92
-
Feb 12, 7:44 PM