Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01351635 ↗ ServiceMax

GE Healthcare FMI • FCO • PC

📍 HCA FLORIDA UNIVERSITY HOSPITAL — 3476 S University Dr, Davie FL, 33328

Feb 13, 2026 → Feb 22, 2026

🔴 Behind
PC
SLA Clock
Per client agreement · Target: Jan 31, 2026
✗ SLA Missed (14 biz days late)
Active: 4 biz days
🕐 Clock stopped: Completed (Feb 22, 2026)
▶ Clock Running
Status: Created
Feb 13 → Feb 13, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Feb 13 → Feb 13, 2026
0 business days (counted)
Running total: 0 of ? biz days used
4d
▶ Clock Running
Status: Scheduled
Feb 13 → Feb 20, 2026
4 business days (counted)
Running total: 4 of ? biz days used
▶ Clock Running
Status: Entered
Feb 20 → Feb 20, 2026
0 business days (counted)
Running total: 4 of ? biz days used
▶ Clock Running
Status: Assigned
Feb 20 → Feb 20, 2026
0 business days (counted)
Running total: 4 of ? biz days used
0d
▶ Clock Running
Status: Scheduled
Feb 20 → Feb 22, 2026
0 business days (counted)
Running total: 4 of ? biz days used
Created: Feb 13, 2026 Completed: Feb 22, 2026
Show SLA Clock Detail (6 periods)
Period Status Clock Biz Days Running Total
Feb 13 → Feb 13 Created ▶ Running 0 0
Feb 13 → Feb 13 Assigned ▶ Running 0 0
Feb 13 → Feb 20 Scheduled ▶ Running 4 4
Feb 20 → Feb 20 Entered ▶ Running 0 4
Feb 20 → Feb 20 Assigned ▶ Running 0 4
Feb 20 → Feb 22 Scheduled ▶ Running 0 4
Dispatch 0.0d
Coordinators 5.6d
Field Work 0.2d
Billing 7.3d
✗ SLA Missed
Dispatch
0.0 days
Coordinators
5.6 days
Over SLA
Field Work
0.2 days
Billing
7.3 days
Over SLA
Created: Feb 13, 2026 Due: Jan 31, 2026 (33 days overdue)
📅
4.9 days Total Age
⏱️
4.6d in Scheduled Longest Stage
🔄
12 transitions Status Changes
⚠️
7.9d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
6 lines Work Details
🏠
1 visit On-Site Trips
📋
Coordinator Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00568315
Closed
FMI 78101B: Venue Go Thermal Event due to battery Purpose: Each affected system will have a SW Version R3.5 update installed. FMI Type: Mandatory Recall FMI For code 2, 3, 4 and 5 closures, please reach out to FMI admin team at TCS.FMIAdmin@gehealthcare.com or 8668836784 – OPT. 5 for assistance in closing and correct objective evidence attachment to Activity/SR.
Priority
High
Origin
Email
Reason
New Case
Contact
Michael Capistrano
Owner
Erin Martin
Created
Feb 13, 2026
Work Orders from this Case (1)
WO-01351635 (current) Ready to Bill
FCO • Raymond Ebanks
Created: Feb 13, 2026 • Closed: Feb 22, 2026
At Risk - Monitor Closely
Ready to Bill • 19 days old
🚨
Primary Delay 4.6 days stuck in "Scheduled"
⏱️
Total Delay 7.9 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
0.0d / 0.5d SLA
Scheduled
5.6d / 2.0d SLA
Completed
0.2d / 1.0d SLA
Closed
2.0d / 1.0d SLA
Ready to Bill
7.2d / 1.0d SLA
Billing Review
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
"Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing SW Version R3.4 or R3.5 and communicated with customer to scrap previous software versions”. Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”."
🔍 Technician Findings
"Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing SW Version R3.4 or R3.5 and communicated with customer to scrap previous software versions”. Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”."
⚠️ Problem Description
FMI 78101B: Venue Go Thermal Event due to battery Purpose: Each affected system will have a SW Version R3.5 update installed. FMI Type: Mandatory Recall FMI For code 2, 3, 4 and 5 closures, please reach out to FMI admin team at TCS.FMIAdmin@gehealthcare.com or 8668836784 – OPT. 5 for assistance in closing and correct objective evidence attachment to Activity/SR.
📄 Description
GE Healthcare - Venue Go Ultrasound
📞 Call Description
FMI 78101

Timeline

📞
Case Linked Feb 13, 1:46 PM
Case Number: 00568315
Subject:
Status: Closed
📋
5 Work Order Created Feb 13, 1:52 PM
Work Order Created → Technician Assigned → Status: Assigned → Status: Scheduled → Dispatch Scheduled
👷
Technician Assigned by Ashley Luman
Technician: Luis Iser
👷
Status: Assigned by Ashley Luman
From: Entered
To: Assigned
Duration in Previous: 1m
🗓️
Status: Scheduled by Ashley Luman
From: Assigned
To: Scheduled
Duration in Previous: 1m
📅
Dispatch Scheduled by Ashley Luman
Scheduled For: 2026-02-13T13:00:00.000+0000
📅
Dispatch Scheduled by Luis Iser Feb 13, 4:19 PM
Scheduled For: 2026-02-18T13:00:00.000+0000
4.0 business days
📅
Dispatch Scheduled by Luis Iser Feb 19, 10:52 AM
Scheduled For: 2026-02-19T13:00:00.000+0000
📅
Dispatch Scheduled by Luis Iser Feb 19, 6:22 PM
Scheduled For: 2026-02-27T13:00:00.000+0000
🆕
3 Status: Entered Feb 20, 9:45 AM
Status: Entered → Technician Assigned → Dispatch Scheduled
👷
Technician Assigned by Ashley Luman
Technician: Raymond Ebanks
📅
Dispatch Scheduled by Ashley Luman
Scheduled For: 2026-02-27T13:00:00.000+0000
1.0 business days
⏱️
2 3x Labor Added Feb 21, 7:43 PM
3x Labor Added → Status: Completed
✔️
Status: Completed by Raymond Ebanks
From: Scheduled
To: Completed
Duration in Previous: 1d 9h
0.0 business days
🚗
2x Travel Added Feb 22, 8:37 PM
Type: Travel
Status: Open
Qty: 278, 24
🏁
Status: Closed by Raymond Ebanks Feb 22, 8:57 PM
From: Completed
To: Closed
Duration in Previous: 1d 1h
📅
Dispatch Scheduled by Ashley Luman Feb 23, 12:28 PM
Scheduled For: 2026-02-28T13:00:00.000+0000
⏱️
2 Labor Added Feb 24, 11:06 AM
Labor Added → Status: Ready to Bill
📄
Status: Ready to Bill by Timothy Amburgey
From: Closed
To: Ready to Bill
Duration in Previous: 1d 14h
3.0 business days
💵
2 Status: Billing Review Feb 26, 8:40 AM
Status: Billing Review → Status: Ready to Bill
📄
Status: Ready to Bill by Timothy Amburgey
From: Billing Review
To: Ready to Bill
Duration in Previous: 3m
3.0 business days
💵
Status: Billing Review by Timothy Amburgey Mar 2, 4:43 PM
From: Ready to Bill
To: Billing Review
Duration in Previous: 4d 8h
📄
Status: Ready to Bill by Timothy Amburgey Mar 2, 4:55 PM
From: Billing Review
To: Ready to Bill
Duration in Previous: 12m
💵
2 Status: Billing Review Mar 3, 1:16 PM
Status: Billing Review → Status: Ready to Bill
📄
Status: Ready to Bill by Timothy Amburgey
From: Billing Review
To: Ready to Bill
Duration in Previous: 1m

Bottlenecks

Scheduled
Duration: 4.6 business days (threshold: 2.0 business days)
Exceeded by 2.6 business days
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Ready to Bill
Duration: 3.0 business days (threshold: 1.0 business days)
Exceeded by 2.0 business days
Ready to Bill
Duration: 3.0 business days (threshold: 1.0 business days)
Exceeded by 2.0 business days
Ready to Bill
Duration: 1.3 business days (threshold: 1.0 business days)
Exceeded by 2.1 business hours

🔗 Related Artifacts

📞
Case 00568315
Closed

ℹ️ Work Order Details

Status
Ready to Bill
Priority
PC
Type
FCO
Branch
N/A
Technician
Raymond Ebanks
Scheduled
Feb 28, 8:00 AM
Created
Feb 13, 1:52 PM
Invoice #
N/A

Work Details (6)

Name Type Status Qty Amount Date
WL-03115380 Labor Open 4.5 $450.00 Feb 21, 7:43 PM
WL-03115381 Labor Open 1.5 $100.00 Feb 21, 7:43 PM
WL-03115382 Labor Open 1 $0.00 Feb 21, 7:43 PM
WL-03115707 Travel Open 278 $0.00 Feb 22, 8:37 PM
WL-03115708 Travel Open 24 $0.00 Feb 22, 8:37 PM
WL-03117468 Labor Open 0.016666666666667 $38.00 Feb 24, 11:06 AM

Details