022326 NIK - Sent email to Nelson Hernandez requesting PO and increase in PO total to $7,666.79 to cover $166.79 change order for materials purchases.
🔧Work Performed
02/17/26
Arrived today to complete the installation.
After sourcing the needed parts for the installation in Denver I then made the return trip to the Facility.
The needed supplies were approved for purchase by Nelson Hernandez via Text Message.
Once I made it back to the facility I seen that the plumber had made his connections and that the electrician had completed his work.
The drains were plumbed and made ready for startup.
There is one item that was not able to be sourced due to time was the 1 1/2" copper drainpipe needs a "Circle Hanger" to be properly installed.
Nelson was made aware of this.
There also was no hardware for the cage for the shelves.
Nelson was made aware as well.
All connections were made using propress and are ready.
02/16/26
The unit arrived at 0900 and was unloaded and unboxed.
The unit was made ready for the move to the room.
We awaited the Steris Rep to bring the "movers".
There was discussion on the plumbing and who was responsible for the install.
I advised them that since they had a licensed plumber that they should use them.
The facility was under the impression that they have to make the connections and had the supplies purchased already.
I advised them that I can do the plumbing in any other state at this time except Nebraska as I am not permitted to do so due to their state codes. I can perform the Drain supply but not the Fresh water supply.
They were ok with that problem being solved.
Once the tech arrived the unit was fitted with the mover dolly and was then moved to the opening.
The Steris tech departed the location.
The hole of the opening is wider than the unit.
I spoke with the head of facilities (Vince) and he advised that they would have the trim specially made for this unit.
The unit was having issues getting centered in the opening due to an electrical "J Box" that was left from the previous unit.
I advised Vince and he stated it was fine to move it over to clear that issue.
Once the unit was placed in its spot there was another issue with the unit "Leaning Forward"
The unit is level and plumb with the use of a bubble level.
When checking the wall, the was indeed not plumb.
I advised Vince of this and he understood. He stated, " I will hide most of that with the trim and I am not worried about it". I again asked him " Are you sure you are ok with the reveal of the unit the way it sits?
His response was " I am fine with it. I just want it running and I want to make the girls happy with a new machine".
So, the unit was left as it was.
Electricians showed up and they must install a secondary "E-Stop" on the circuit of this unit, and they had questions I could not answer so I referred them to Nelson for clarification. I have not had the pleasure of being involved with a secondary "E-Stop" need.
The rack was damaged in shipping and has the front section BENT significantly.
I was able to bend it back and it looks great not and the sliders work as intended.
End of day due to not enough room with the electricians in the small space.
🔍Technician Findings
Arrived this morning to await the arrival of the new Steris small 400 sterilizer. Room was cleared and ready for install.
⚠️Problem Description
Q-00032553
Order # 20373738
DUNDY COUNTY HOSPITAL [37413]
1313 N CHEYENNE, BENKELMAN, NE 69021 US
Installation AMSCO 400 20" Small Sterlizer
Feb 13, 2026 4:35pm
@David Carvalho
Feb 23, 2026 4:06pm
From: Nicole Floyd <nicole.floyd@emsar.com>
Date: Monday, February 23, 2026 at 3:05 PM
To: Hernandez, Nelson <Nelson_Hernandez@steris.com>, David Carvalho <david.carvalho@emsar.com>
Cc: Chris Ables <cables@emsar.com>
Subject: PO Needed for Dundy County Hospital (SOA #20373738)
Hi Nelson,
Thanks for inviting EMSAR to assist with the work at Dundy County Hospital. Based on the STERIS Installation Meeting Summary, we are referencing Project #20373738 as the SOA # for Dundy County Hospital.
We are preparing to submit the invoice for this work, but we have not received a Purchase Order. Can you please issue and share the PO so we can proceed with billing?
Additionally, there were materials purchases required during installation resulting in a change order of $166.79. Please update the PO total from $7,500.00 to $7,666.79 to reflect the revised project total.
Best,
Nikki Floyd,
Mobile: 305-788-8098
📅
WO-01351706 - Installation - Benkelman - Dundy County Hospital (37413)
Feb 16, 2026 9:00am – 6:00pm
Work Order: WO-01351706
Account: Steris
Customer Case Number:
Location: Dundy County Hospital (37413)
Address: 1313 N Cheyenne, Benkelman, NE 69021
Manufacturer:
Model #:
Serial #:
Contact Name: Nelson Hernandez
Contact Phone: 726-231-4660
Contact Email: nelson_hernandez@steris.com
Due Date: 2/2
WORD_X
Steris email approval Dundy County Hospital
Feb 13, 2026
PDF
1351706 Dundy County Hospital
Feb 16, 2026
PDF
1351706 Dundy County Hospital (1)
Feb 17, 2026
Timeline
📞
Case Linked Feb 13, 11:24 AM
Case Number:00568229
Subject:Dundy County (37413) - SOA 20373738 (?)- Installation
Status:Closed
📋
▶
5
Work Order Created Feb 13, 4:34 PM
Work Order Created → Status: Ready for Scheduling → Technician Assigned → Status: Scheduled → Dispatch Scheduled
📅
Status: Ready for Scheduling by Kimberly Hardison
From:Entered, Ready for Scheduling
To:Ready for Scheduling, Assigned
Duration in Previous:0m
👷
Technician Assigned by David Carvalho
Technician:Robert Butler
🗓️
Status: Scheduled by David Carvalho
From:Assigned
To:Scheduled
Duration in Previous:0m
📅
Dispatch Scheduled by David Carvalho
Scheduled For:2026-02-16T14:00:00.000+0000
💵
3x Expenses Added Feb 13, 4:54 PM
Type:Expenses
Status:Open
Qty:1
💵
2x Expenses Added Feb 13, 5:12 PM
Type:Expenses
Status:Open
Qty:1
⏳0.8 business days
🚗
6x Travel Added Feb 16, 2:17 AM
Type:Travel, Expenses, Labor
Status:Open
Qty:51.1, 13, 2, 52.3, 52.4
🔧
Status: Tech On Site by Robert ButlerFeb 16, 9:59 AM
From:Scheduled
To:Tech On Site
Duration in Previous:2d 17h
🚗
Status: Tech Off Site by Robert ButlerFeb 16, 6:52 PM
From:Tech On Site
To:Tech Off Site
Duration in Previous:8h 52m
⏱️
3x Labor Added Feb 16, 8:13 PM
Type:Labor, Expenses
Status:Open
Qty:10
💵
3x Expenses Added Feb 17, 11:11 AM
Type:Expenses
Status:Open
Qty:1
⏱️
▶
2
3x Labor Added Feb 17, 11:29 AM
3x Labor Added → 3x Expenses Added
💵
3x Expenses Added
Type:Expenses
Status:Open
Qty:1
🔧
Status: Tech On Site by Robert ButlerFeb 17, 6:16 PM
From:Tech Off Site
To:Tech On Site
Duration in Previous:23h 24m
🚗
Status: Tech Off Site by Robert ButlerFeb 17, 8:33 PM
From:Tech On Site
To:Tech Off Site
Duration in Previous:2h 17m
🚗
▶
2
8x Travel Added Feb 17, 8:45 PM
8x Travel Added → Expenses Added
💵
Expenses Added
Type:Expenses
Status:Open
Qty:1
⏱️
▶
2
Labor Added Feb 18, 9:20 AM
Labor Added → Expenses Added
💵
Expenses Added
Type:Expenses
Status:Open
Qty:1
⏳2.0 business days
✔️