Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01352801 ↗ ServiceMax

BURNET FIRE DEPARTMENT • Evaluation • P7

📍 Burnet Fire Department — 2002 S Water Street, Burnet TX, 78611

Feb 19, 2026 → Mar 4, 2026

✅ Completed
P7
SLA Clock
7 business days from creation · Target: Mar 2, 2026
✗ SLA Missed (2 biz days late)
Active: 9 biz days
Budget: 7 biz days
🕐 Clock stopped: Closed (Mar 4, 2026)
SLA Target
▶ Clock Running
Status: Created
Feb 19 → Feb 19, 2026
0 business days (counted)
Running total: 0 of 7 biz days used
▶ Clock Running
Status: Ready for Scheduling
Feb 19 → Feb 20, 2026
1 business day (counted)
Running total: 1 of 7 biz days used
3d
▶ Clock Running
Status: Assigned
Feb 20 → Feb 25, 2026
3 business days (counted)
Running total: 4 of 7 biz days used
5d
▶ Clock Running
Status: Scheduled
Feb 25 → Mar 4, 2026
5 business days (counted)
Running total: 9 of 7 biz days used
▶ Clock Running
Status: Incomplete
Mar 4 → Mar 4, 2026
0 business days (counted)
Running total: 9 of 7 biz days used
Created: Feb 19, 2026 Closed: Mar 4, 2026
Business Days Used 9 / 7
0 7d budget +2d over
Show SLA Clock Detail (5 periods)
Period Status Clock Biz Days Running Total
Feb 19 → Feb 19 Created ▶ Running 0 0 / 7
Feb 19 → Feb 20 Ready for Scheduling ▶ Running 1 1 / 7
Feb 20 → Feb 25 Assigned ▶ Running 3 4 / 7
Feb 25 → Mar 4 Scheduled ▶ Running 5 9 / 7
Mar 4 → Mar 4 Incomplete ▶ Running 0 9 / 7
Dispatch 0.0d
Coordinators 11.0d
Incomplete 1.0d (excluded)
✗ SLA Missed
Dispatch
0.0 days
Coordinators
11.0 days
Over SLA
Incomplete (excluded from total)
1.0 days
Created: Feb 19, 2026 Due: Mar 2, 2026 Completed: Mar 4, 2026 (1 days late)
📅
9.9 days Total Age
⏱️
5.1d in Scheduled Longest Stage
🔄
5 transitions Status Changes
⚠️
7.5d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
3 lines Work Details
🏠
1 visit On-Site Trips
📋
Coordinator Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00569886
EMS L2 Review * No quote needed until parts are determined
Closed
https://www.ebiotrack.com/workorder.php?wo=71810 Ferno SN 18F003882 It will not do anything, they have swapped out the battery with a fully charged battery and it will not do anything. The technician will need to evaluate the unit and determine if parts are needed for repairs.
Priority
High
Origin
Phone
Reason
New Case
Contact
Curtis Murphy
Owner
Jessica Sells
Created
Feb 18, 2026
Work Orders from this Case (1)
WO-01352801 (current) Closed
Evaluation • Chane Lacy
Created: Feb 19, 2026 • Closed: Mar 4, 2026
Completed with minor delays
Closed • 13 days old
🚨
Primary Delay 5.1 days stuck in "Scheduled"
⏱️
Total Delay 7.5 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
1.9d / 1.0d SLA
Assigned
4.0d / 0.5d SLA
Scheduled
5.1d / 2.0d SLA
Incomplete
1.0d

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

3/4/26 lcoonrod

follow up in case 00574296


3/4 KWeiss, We can not quote for parts/repairs from an evaluation w/o. Closing w/o for dispatch to create a repair case.

2/25 KKelch Curtis called me back to schedule for 3/3 between 9 and 11 am. Customer confirmed. 

2/25 KKelch called Curtis to schedule for 3/3 between 9 and 11 am. Left VM. 

2/23 KKelch called Curtis to schedule for 2/27 between 1 and 3 pm. Left VM. 

🔧 Work Performed
3/3 CLacy- Evaluated unit and found the lower buttons are shorting causing the stretcher to raise on its own then lose function. The top buttons are worn as well. Parts needed to complete repairs. 218-3115 X 2
🔍 Technician Findings
Unit goes up by itself then will not function
⚠️ Problem Description
https://www.ebiotrack.com/workorder.php?wo=71810 Ferno SN 18F003882 It will not do anything, they have swapped out the battery with a fully charged battery and it will not do anything. The technician will need to evaluate the unit and determine if parts are needed for repairs.
📄 Description
Ferno Power X1 Power Cot

Timeline

📞
Case Linked Feb 18, 4:57 PM
Case Number: 00569886
Subject: EMS L2 Review * No quote needed until parts are determined
Status: Closed
📋
2 Work Order Created Feb 19, 12:11 PM
Work Order Created → Status: Ready for Scheduling
📅
Status: Ready for Scheduling by Jessica Sells
From: Entered
To: Ready for Scheduling
Duration in Previous: 0m
👷
2 Technician Assigned Feb 20, 9:35 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Kaitlyn Kelch
From: Ready for Scheduling
To: Assigned
Duration in Previous: 21h 24m
4.0 business days
🗓️
2 Status: Scheduled Feb 25, 10:22 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2026-03-03T15:00:00.000+0000
⚠️ 5.0 business days
⏱️
3x Labor Added Mar 3, 6:57 PM
Type: Labor, Travel
Status: Open
Qty: 4, 1, 210
⚠️
Status: Incomplete by Chane Lacy Mar 3, 7:49 PM
From: Scheduled
To: Incomplete
Duration in Previous: 6d 9h
🏁
Status: Closed by Keith Weiss Mar 4, 11:07 AM
From: Incomplete
To: Closed
Duration in Previous: 15h 17m

Bottlenecks

Ready for Scheduling
Duration: 1.9 business days (threshold: 1.0 business days)
Exceeded by 6.8 business hours
Assigned
Duration: 4.0 business days (threshold: 4.0 business hours)
Exceeded by 3.5 business days
Scheduled
Duration: 5.1 business days (threshold: 2.0 business days)
Exceeded by 3.1 business days

🔗 Related Artifacts

📞
Case 00569886
Closed

ℹ️ Work Order Details

Status
Closed
Priority
P7
Type
Evaluation
Branch
ERLA - PROD
Technician
Chane Lacy
Scheduled
Mar 3, 10:00 AM
Created
Feb 19, 12:11 PM
Invoice #
N/A

Work Details (3)

Name Type Status Qty Amount Date
WL-03128760 Labor Open 4 $0.00 Mar 3, 6:57 PM
WL-03128761 Labor Open 1 $0.00 Mar 3, 6:57 PM
WL-03128762 Travel Open 210 $0.00 Mar 3, 6:57 PM

Details