Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Oct 31, 2025
✓ SLA Met (14 biz days early)
🕐 Clock stopped: Completed (Oct 13, 2025)
▶ Clock Running
Status: Created
Aug 18 → Aug 18, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Aug 18 → Aug 18, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Aug 18 → Aug 19, 2025
1 business day (counted)
Running total: 1 of ? biz days used
37d
▶ Clock Running
Status: Scheduled
Aug 19 → Oct 13, 2025
37 business days (counted)
Running total: 38 of ? biz days used
▶ Clock Running
Status: Tech On Site
Oct 13 → Oct 13, 2025
0 business days (counted)
Running total: 38 of ? biz days used
Created: Aug 18, 2025
Completed: Oct 13, 2025
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Aug 18 → Aug 18
Created
▶ Running
0
0
Aug 18 → Aug 18
Ready for Scheduling
▶ Running
0
0
Aug 18 → Aug 19
Assigned
▶ Running
1
1
Aug 19 → Oct 13
Scheduled
▶ Running
37
38
Oct 13 → Oct 13
Tech On Site
▶ Running
0
38
Coordinators
39.2 days
Over SLA
Billing
6.6 days
Over SLA
Created: Aug 18, 2025
Due: Oct 31, 2025
Completed: Oct 13, 2025 (18 days early)
⏱️
37.2d in Scheduled
Longest Stage
🔄
7 transitions
Status Changes
⚠️
42.3d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00519677
6007977150
Closed
28U
SYS-LC-1220
Contract ends 09/30/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G4294B
DECAH01113 1220 Infinity II Gradient DAD LC System
🚨
Primary Delay
37.2 days stuck in "Scheduled"
⏱️
Total Delay
42.3 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
37.2d
/ 2.0d SLA
Tech On Site
0.0d
/ 1.0d SLA
Ready to Bill
6.6d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📋 Tasks (1)
📅 Events (1)
🔒
Internal CSA Notes
18 Aug 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame.
Please assign to Larry Alberty ARP to site is 20 miles. Zone 1
🔧
Work Performed
Completed LC PM.
⚠️
Problem Description
28U
SYS-LC-1220
Contract ends 09/30/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G4294B
DECAH01113 1220 Infinity II Gradient DAD LC System
📄
Description
1220 Infinity Gradient DAD LC System
📞
Call Description
OCT 2025 LC PM
📞
Call
Completed
Aug 18, 2025
18 Aug 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame.
📅
WO-01298066 - Preventive Maintenance - G4294B - Redwood City - Codexis Inc
Oct 13, 2025 8:00am – 5:00pm
Work Order: WO-01298066
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6007977150
Location: Codexis Inc
Address: 200 Penobscot Dr, Redwood City, CA 94063
Manufacturer:
Model #: G4294B
Serial #: DECAH01113
Contact Name: Riley Curd
Contact Phone: 9168723682
Contact Email: riley.curd@codexi
Timeline
📞
📋
Work Order:
WO-01298066
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
1m, 0m
👷
Technician:
Larry Alberty
🗓️
📅
Scheduled For:
2025-10-13T12:00:00.000+0000
🔧
🚗
Type:
Travel, Parts
Status:
Open
Qty:
20, 1
⏱️
✔️
From:
Tech On Site, Completed
To:
Completed, Closed
Duration in Previous:
10h 24m, 0m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
19h 37m
📨
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
2m
🧾
Invoice Number:
SM-244382
Bottlenecks
Assigned
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Scheduled
Duration: 37.2 business days (threshold: 2.0 business days)
Exceeded by 35.2 business days
Ready to Bill
Duration: 6.6 business days (threshold: 1.0 business days)
Exceeded by 5.6 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Oct 13, 8:00 AM
Work Details (7)
Name
Type
Status
Qty
Amount
Date
WL-02968378
Travel
Open
20
$180.00
Oct 13, 9:33 AM
WL-02968379
Travel
Open
20
$0.00
Oct 13, 9:33 AM
WL-02968380
Parts
Open
1
$0.00
Oct 13, 9:33 AM
WL-02968381
Parts
Open
1
$0.00
Oct 13, 9:33 AM
WL-02969229
Labor
Open
1
$0.00
Oct 13, 7:54 PM
WL-02969230
Labor
Open
1
$0.00
Oct 13, 7:54 PM
WL-02969231
Labor
Open
4
$456.00
Oct 13, 7:54 PM