Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01298067 ↗ ServiceMax

AGILENT TECHNOLOGIES (ASP) • EOQ • PC

📍 Codexis Inc — 200 Penobscot Dr, Redwood City CA, 94063

Aug 18, 2025 → Oct 14, 2025

✅ Completed
PC
SLA Clock
Per client agreement · Target: Oct 31, 2025
✓ SLA Met (13 biz days early)
Active: 39 biz days
🕐 Clock stopped: Completed (Oct 14, 2025)
▶ Clock Running
Status: Created
Aug 18 → Aug 18, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Aug 18 → Aug 18, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Aug 18 → Aug 19, 2025
1 business day (counted)
Running total: 1 of ? biz days used
38d
▶ Clock Running
Status: Scheduled
Aug 19 → Oct 14, 2025
38 business days (counted)
Running total: 39 of ? biz days used
▶ Clock Running
Status: Tech On Site
Oct 14 → Oct 14, 2025
0 business days (counted)
Running total: 39 of ? biz days used
Created: Aug 18, 2025 Completed: Oct 14, 2025
Show SLA Clock Detail (5 periods)
Period Status Clock Biz Days Running Total
Aug 18 → Aug 18 Created ▶ Running 0 0
Aug 18 → Aug 18 Ready for Scheduling ▶ Running 0 0
Aug 18 → Aug 19 Assigned ▶ Running 1 1
Aug 19 → Oct 14 Scheduled ▶ Running 38 39
Oct 14 → Oct 14 Tech On Site ▶ Running 0 39
Dispatch 0.0d
Coordinators 40.2d
Field Work 0.9d
Billing 5.8d
✓ SLA Met
Dispatch
0.0 days
Coordinators
40.2 days
Over SLA
Field Work
0.9 days
Billing
5.8 days
Over SLA
Created: Aug 18, 2025 Due: Oct 31, 2025 Completed: Oct 14, 2025 (17 days early)
📅
40.0 days Total Age
⏱️
38.2d in Scheduled Longest Stage
🔄
8 transitions Status Changes
⚠️
42.8d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
5 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00519677
6007977150
Closed
28U SYS-LC-1220 Contract ends 09/30/2026 repair included PM / EOQ PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours.  Always have techs order a lamp if they have an OQ with the PM. G4294B DECAH01113 1220 Infinity II Gradient DAD LC System
Priority
High
Origin
Web
Reason
New Case
Contact
Riley Curd
Owner
Leona Coonrod
Created
Aug 18, 2025
Work Orders from this Case (2)
WO-01298066 Invoiced
Preventive Maintenance • Larry Alberty
Created: Aug 18, 2025 • Closed: Oct 13, 2025
WO-01298067 (current) Invoiced
EOQ • Larry Alberty
Created: Aug 18, 2025 • Closed: Oct 14, 2025
Completed with significant delays
Invoiced • 198 days old
🚨
Primary Delay 38.2 days stuck in "Scheduled"
⏱️
Total Delay 42.8 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
2.0d / 0.5d SLA
Scheduled
38.2d / 2.0d SLA
Tech On Site
0.9d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.3d / 1.0d SLA
Ready to Bill
5.7d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes
Please assign to Larry Alberty ARP to site is 20 miles. Zone 1
🔧 Work Performed
Completed LC EOQ.
⚠️ Problem Description
28U SYS-LC-1220 Contract ends 09/30/2026 repair included PM / EOQ PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours.  Always have techs order a lamp if they have an OQ with the PM. G4294B DECAH01113 1220 Infinity II Gradient DAD LC System
📄 Description
1220 Infinity Gradient DAD LC System
📞 Call Description
OCT 2025 LC EOQ

Timeline

📞
4 Case Linked Aug 18, 8:46 AM
Case Linked → Work Order Created → Status: Ready for Scheduling → Technician Assigned
📋
Work Order Created
Work Order: WO-01298067
Type: EOQ
Priority: PC
📅
Status: Ready for Scheduling by Leona Coonrod
From: Entered, Ready for Scheduling
To: Ready for Scheduling, Assigned
Duration in Previous: 0m
👷
Technician Assigned by Leona Coonrod
Technician: a0hF0000001pE6KIAU, Larry Alberty
2.0 business days
🗓️
2 Status: Scheduled Aug 19, 6:14 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Larry Alberty
Scheduled For: 2025-10-14T12:00:00.000+0000
🚨 38.7 business days
🔧
Status: Tech On Site by Larry Alberty Oct 14, 10:03 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 55d 15h
⏱️
2 5x Labor Added Oct 14, 5:06 PM
5x Labor Added → Status: Completed
✔️
Status: Completed by Larry Alberty
From: Tech On Site
To: Completed
Duration in Previous: 7h 4m
🏁
Status: Closed by Larry Alberty Oct 14, 5:12 PM
From: Completed
To: Closed
Duration in Previous: 3m
📄
Status: Ready to Bill by Hannah Shaw Oct 15, 2:02 PM
From: Closed
To: Ready to Bill
Duration in Previous: 20h 50m
⚠️ 6.0 business days
📨
2 Status: Invoice Pending Oct 22, 3:27 PM
Status: Invoice Pending → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 2m
4.0 business days
🧾
Invoice Created Oct 27, 12:22 PM
Invoice Number: SM-244382

Bottlenecks

Assigned
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Scheduled
Duration: 38.2 business days (threshold: 2.0 business days)
Exceeded by 36.2 business days
Closed
Duration: 1.3 business days (threshold: 1.0 business days)
Exceeded by 2.8 business hours
Ready to Bill
Duration: 5.7 business days (threshold: 1.0 business days)
Exceeded by 4.7 business days

🔗 Related Artifacts

📞
Case 00519677
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
PC
Type
EOQ
Branch
N/A
Technician
Larry Alberty
Scheduled
Oct 14, 8:00 AM
Created
Aug 18, 8:47 AM
Invoice #
SM-244382

Work Details (5)

Name Type Status Qty Amount Date
WL-02970369 Labor Open 1 $0.00 Oct 14, 5:06 PM
WL-02970370 Labor Open 5 $798.00 Oct 14, 5:06 PM
WL-02970371 Labor Open 1 $0.00 Oct 14, 5:06 PM
WL-02970372 Travel Open 20 $180.00 Oct 14, 5:06 PM
WL-02970373 Travel Open 20 $0.00 Oct 14, 5:06 PM

Details