Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Sep 4, 2025
✗ SLA Missed (10 biz days late)
🕐 Clock stopped: Completed (Sep 18, 2025)
▶ Clock Running
Status: Created
Aug 21 → Aug 22, 2025
1 business day (counted)
Running total: 1 of ? biz days used
4d
▶ Clock Running
Status: Assigned
Aug 22 → Aug 28, 2025
4 business days (counted)
Running total: 5 of ? biz days used
12d
▶ Clock Running
Status: Scheduled
Aug 28 → Sep 16, 2025
12 business days (counted)
Running total: 17 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 16 → Sep 18, 2025
2 business days (counted)
Running total: 19 of ? biz days used
Created: Aug 21, 2025
Completed: Sep 18, 2025
Show SLA Clock Detail (4 periods)
Period
Status
Clock
Biz Days
Running Total
Aug 21 → Aug 22
Created
▶ Running
1
1
Aug 22 → Aug 28
Assigned
▶ Running
4
5
Aug 28 → Sep 16
Scheduled
▶ Running
12
17
Sep 16 → Sep 18
Tech On Site
▶ Running
2
19
Dispatch
1.4 days
Over SLA
Coordinators
17.9 days
Over SLA
Field Work
2.2 days
Over SLA
Billing
1.4 days
Over SLA
Created: Aug 21, 2025
Due: Sep 4, 2025
Completed: Sep 18, 2025 (13 days late)
⏱️
12.9d in Scheduled
Longest Stage
🔄
8 transitions
Status Changes
⚠️
18.3d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00521078
URGENT Philips WO Request
Closed
H280461736A51 Active Exhalation Verification: S(+) P(+): Pilot: Reading 30.08 cmH2O 25.50 28.50 FAILED
🚨
Primary Delay
12.9 days stuck in "Scheduled"
⏱️
Total Delay
18.3 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
12.9d
/ 2.0d SLA
Tech On Site
2.2d
/ 1.0d SLA
Completed
0.0d
/ 1.0d SLA
Ready to Bill
1.4d
/ 1.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (6)
📅 Events (1)
🔒
Internal CSA Notes
09/16/2025 EMartin PO rcvd updating scheduled date to FSE onsite per request
09/11/2025 EMartin Fady sent email to Randy to get hard copy PO
08/28/2025 Emartin sent email to POC advising onsite tomorrow
08025025_BOUPDATE_
08/27/2025 MNewman - Quote has been accepted. Work can be scheduled.
08/25/2025 Emartin PWO pending entitlement FSE onsite working with POC to get hardcopy PO and quotes along with other devices for FCO81 completion
08/22/2025 Emartin PWO pending entitlement
🔧
Work Performed
Performed Corrective Maintenance on device. Dis-Assembled Device, Removed/Replaced hardware, assembled and tested. All required PA results pass
🔍
Technician Findings
Performed Corrective Maintenance on device. Dis-Assembled Device, Removed/Replaced hardware, assembled and tested. All required PA results pass
⚠️
Problem Description
H280461736A51 Active Exhalation Verification: S(+) P(+): Pilot: Reading 30.08 cmH2O 25.50 28.50 FAILED
📄
Description
Philips Trilogy EV300 Hospital Ventilator (DS2200X11B / 989805661881)
📞
Call Description
Repair - Trade
📅
WO-01299046 - Repair - Trilogy EV300 Vent - Athens - PIEDMONT ATHENS HOSPITAL
Sep 16, 2025 8:00am – 5:00pm
Work Order: WO-01299046
Account: PHILIPS HEALTHCARE
Customer Case Number: WO-13419848
Location: PIEDMONT ATHENS HOSPITAL
Address: 1199 PRINCE AVE, Athens, GA 30606
Manufacturer: Philips Healthcare
Model #: Trilogy EV300 Vent
Serial #: H280461736A51
Contact Name: Randy Ragan
Contact Phone: (
Timeline
📞
Case Number:
00521078
Subject:
URGENT Philips WO Request
Status:
Closed
📋
Work Order:
WO-01299046
Type:
Repair
Priority:
PC
👷
👷
Technician:
Bruce Ballard
👷
📅
Scheduled For:
2025-09-05T12:00:00.000+0000
🗓️
From:
Assigned
To:
Scheduled
Duration in Previous:
6d 4h
👷
📅
Scheduled For:
2025-08-29T12:00:00.000+0000
📅
Scheduled For:
2025-09-02T12:00:00.000+0000
📅
Scheduled For:
2025-09-08T12:00:00.000+0000
📅
Scheduled For:
2025-09-19T12:00:00.000+0000
📅
Scheduled For:
2025-09-16T12:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
19d 5h
⏱️
Type:
Labor
Status:
Open
Qty:
3, 1
🚗
Type:
Travel
Status:
Open
Qty:
87
✔️
🏁
From:
Completed
To:
Closed
Duration in Previous:
1m
⏱️
📋
From:
Closed
To:
07e-Partial Project
Duration in Previous:
19h 39m
📄
From:
07e-Partial Project
To:
Ready to Bill
Duration in Previous:
6d 3h
💰
From:
Ready to Bill
To:
Invoiced
Duration in Previous:
11h 30m
🧾
Invoice Number:
SM-242111
Bottlenecks
Entered
Duration: 1.4 business days (threshold: 4.0 business hours)
Exceeded by 6.8 business hours
Assigned
Duration: 5.0 business days (threshold: 4.0 business hours)
Exceeded by 4.5 business days
Scheduled
Duration: 12.9 business days (threshold: 2.0 business days)
Exceeded by 10.9 business days
Tech On Site
Duration: 2.2 business days (threshold: 1.0 business days)
Exceeded by 1.2 business days
Closed
Duration: 1.3 business days (threshold: 1.0 business days)
Exceeded by 2.6 business hours
Ready to Bill
Duration: 1.4 business days (threshold: 1.0 business days)
Exceeded by 3.5 business hours
ℹ️ Work Order Details
Scheduled
Sep 16, 8:00 AM
Work Details (4)
Name
Type
Status
Qty
Amount
Date
WL-02941197
Labor
Open
3
$285.00
Sep 18, 4:43 PM
WL-02941198
Labor
Open
1
$155.00
Sep 18, 4:43 PM
WL-02941231
Travel
Open
87
$0.00
Sep 18, 4:55 PM
WL-02942467
Labor
Open
0.016666666666667
$38.00