Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Sep 4, 2025
✓ SLA Met
🕐 Clock stopped: Completed (Sep 4, 2025)
▶ Clock Running
Status: Created
Aug 21 → Aug 22, 2025
1 business day (counted)
Running total: 1 of ? biz days used
4d
▶ Clock Running
Status: Assigned
Aug 22 → Aug 28, 2025
4 business days (counted)
Running total: 5 of ? biz days used
3d
▶ Clock Running
Status: Scheduled
Aug 28 → Sep 3, 2025
3 business days (counted)
Running total: 8 of ? biz days used
1d
▶ Clock Running
Status: Tech On Site
Sep 3 → Sep 4, 2025
1 business day (counted)
Running total: 9 of ? biz days used
Created: Aug 21, 2025
Completed: Sep 4, 2025
Show SLA Clock Detail (4 periods)
| Period |
Status |
Clock |
Biz Days |
Running Total |
| Aug 21 → Aug 22 |
Created |
▶ Running
|
1 |
1 |
| Aug 22 → Aug 28 |
Assigned |
▶ Running
|
4 |
5 |
| Aug 28 → Sep 3 |
Scheduled |
▶ Running
|
3 |
8 |
| Sep 3 → Sep 4 |
Tech On Site |
▶ Running
|
1 |
9 |
Dispatch
1.3 days
Over SLA
Coordinators
8.9 days
Over SLA
Field Work
2.0 days
Over SLA
Billing
1.4 days
Over SLA
Created: Aug 21, 2025
Due: Sep 4, 2025
Completed: Sep 4, 2025 (on time)
⏱️
5.0d in Assigned
Longest Stage
🔄
7 transitions
Status Changes
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
👤 Self-scheduled by Bruce Ballard — scheduling delays attributed to technician, not coordinators
Visit 1
Sep 2, 2025
Visit 2
Sep 3, 2025
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00521078
URGENT Philips WO Request
Closed
H280461736A51 Active Exhalation Verification: S(+) P(+): Pilot: Reading 30.08 cmH2O 25.50 28.50 FAILED
🚨
Primary Delay
5.0 days stuck in "Assigned"
⏱️
Total Delay
9.1 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
3.9d
/ 2.0d SLA
Tech On Site
2.0d
/ 1.0d SLA
Ready to Bill
1.4d
/ 1.0d SLA
💬 Activities, Notes & Communications
🔒
Internal CSA Notes
09/04/2025 EMartin parts on backorder ETA 9/16/2025 FSE onsite advising will provide scheduled date once parts ship 09012025_BOUPDATE_
08/28/2025 Emartin sent email to POC advising onsite tomorrow 08025025_BOUPDATE_
08/27/2025 MNewman - Quote has been accepted. Work can be scheduled.
08/25/2025 Emartin PWO pending entitlement FSE onsite working with POC to get hardcopy PO and quotes along with other devices for FCO81 completion
08/22/2025 Emartin PWO pending entitlement
🔧
Work Performed
Performed Corrective Maintenance on device. Dis-Assembled Device, Removed/Replaced hardware, assembled and tested. All required PA results pass
🔍
Technician Findings
Performed Corrective Maintenance on device. Dis-Assembled Device, Removed/Replaced hardware, assembled and tested. All required PA results pass
⚠️
Problem Description
H28045915B8B8 Active Exhalation Verification: S(+) P(+): Pilot: Reading 28.54 cmH2O 25.50 28.50 FAILED
📄
Description
Philips Trilogy EV300 Hospital Ventilator (DS2200X11B / 989805661881)
📞
Call Description
Repair - Trade
📅
WO-01299047 - Repair - Trilogy EV300 Vent - Athens - PIEDMONT ATHENS HOSPITAL
Sep 2, 2025 8:00am – 5:00pm
Work Order: WO-01299047
Account: PHILIPS HEALTHCARE
Customer Case Number: WO-13419922
Location: PIEDMONT ATHENS HOSPITAL
Address: 1199 PRINCE AVE, Athens, GA 30606
Manufacturer: Philips Healthcare
Model #: Trilogy EV300 Vent
Serial #: H28045915B8B8
Contact Name: Randy Ragan
Contact Phone: (706) 475-
Timeline
📞
Case Number:
00521078
Subject:
URGENT Philips WO Request
Status:
Closed
📋
Work Order:
WO-01299047
Type:
Repair
Priority:
PC
👷
👷
From:
Entered
To:
Assigned
Duration in Previous:
15h 10m
📅
🗓️
From:
Assigned
To:
Scheduled
Duration in Previous:
6d 4h
📅
Scheduled For:
2025-08-29T12:00:00.000+0000
📅
Scheduled For:
2025-09-02T12:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
5d 22h
⏱️
💵
Type:
Expenses, Travel
Status:
Open
Qty:
1, 87, 88
✔️
From:
Tech On Site, Completed
To:
Completed, Closed
Duration in Previous:
1d 5h, 0m
⏱️
Type:
Labor
Status:
Open
Qty:
0.016666666666667
📋
From:
Closed
To:
07e-Partial Project
Duration in Previous:
18h 21m
📄
From:
07e-Partial Project
To:
Ready to Bill
Duration in Previous:
6d 5h
💰
From:
Ready to Bill
To:
Invoiced
Duration in Previous:
11h 23m
🧾
Invoice Number:
SM-240786
Bottlenecks
Entered
Duration: 1.3 business days (threshold: 4.0 business hours)
Exceeded by 6.8 business hours
Assigned
Duration: 5.0 business days (threshold: 4.0 business hours)
Exceeded by 4.5 business days
Scheduled
Duration: 3.9 business days (threshold: 2.0 business days)
Exceeded by 1.9 business days
Tech On Site
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Closed
Duration: 1.4 business days (threshold: 1.0 business days)
Exceeded by 3.3 business hours
Ready to Bill
Duration: 1.4 business days (threshold: 1.0 business days)
Exceeded by 3.4 business hours
Work Details (9)
| Name |
Type |
Status |
Qty |
Amount |
Date |
| WL-02925366 |
Labor |
Open |
2 |
$190.00 |
Sep 4, 3:57 PM |
| WL-02925367 |
Labor |
Open |
2 |
$0.00 |
Sep 4, 3:57 PM |
| WL-02925368 |
Labor |
Open |
2 |
$0.00 |
Sep 4, 3:57 PM |
| WL-02925369 |
Labor |
Open |
2 |
$155.00 |
Sep 4, 3:57 PM |
| WL-02925370 |
Labor |
Open |
1 |
$95.00 |
Sep 4, 3:57 PM |
| WL-02925373 |
Expenses |
Open |
1 |
$0.00 |
Sep 4, 4:01 PM |
| WL-02925374 |
Travel |
Open |
87 |
$0.00 |
Sep 4, 4:01 PM |
| WL-02925375 |
Travel |
Open |
88 |
$0.00 |
Sep 4, 4:01 PM |
| WL-02926438 |
Labor |
Open |
0.016666666666667 |
$38.00 |
Sep 5, 10:52 AM |