Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Nov 30, 2025
✓ SLA Met (5 biz days early)
🕐 Clock stopped: Completed (Nov 19, 2025)
▶ Clock Running
Status: Created
Aug 22 → Aug 22, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Aug 22 → Aug 22, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Aug 22 → Aug 27, 2025
3 business days (counted)
Running total: 3 of ? biz days used
54d
▶ Clock Running
Status: Scheduled
Aug 27 → Nov 14, 2025
54 business days (counted)
Running total: 57 of ? biz days used
▶ Clock Running
Status: Entered
Nov 14 → Nov 14, 2025
0 business days (counted)
Running total: 57 of ? biz days used
▶ Clock Running
Status: Assigned
Nov 14 → Nov 14, 2025
0 business days (counted)
Running total: 57 of ? biz days used
▶ Clock Running
Status: On Hold
Nov 14 → Nov 14, 2025
0 business days (counted)
Running total: 57 of ? biz days used
▶ Clock Running
Status: Entered
Nov 14 → Nov 14, 2025
0 business days (counted)
Running total: 57 of ? biz days used
▶ Clock Running
Status: On Hold
Nov 14 → Nov 14, 2025
0 business days (counted)
Running total: 57 of ? biz days used
▶ Clock Running
Status: Assigned
Nov 14 → Nov 14, 2025
0 business days (counted)
Running total: 57 of ? biz days used
▶ Clock Running
Status: Scheduled
Nov 14 → Nov 19, 2025
3 business days (counted)
Running total: 60 of ? biz days used
▶ Clock Running
Status: Tech On Site
Nov 19 → Nov 19, 2025
0 business days (counted)
Running total: 60 of ? biz days used
Created: Aug 22, 2025
Completed: Nov 19, 2025
Show SLA Clock Detail (12 periods)
Period
Status
Clock
Biz Days
Running Total
Aug 22 → Aug 22
Created
▶ Running
0
0
Aug 22 → Aug 22
Ready for Scheduling
▶ Running
0
0
Aug 22 → Aug 27
Assigned
▶ Running
3
3
Aug 27 → Nov 14
Scheduled
▶ Running
54
57
Nov 14 → Nov 14
Entered
▶ Running
0
57
Nov 14 → Nov 14
Assigned
▶ Running
0
57
Nov 14 → Nov 14
On Hold
▶ Running
0
57
Nov 14 → Nov 14
Entered
▶ Running
0
57
Nov 14 → Nov 14
On Hold
▶ Running
0
57
Nov 14 → Nov 14
Assigned
▶ Running
0
57
Nov 14 → Nov 19
Scheduled
▶ Running
3
60
Nov 19 → Nov 19
Tech On Site
▶ Running
0
60
Holding (excluded from total)
0.3 days
Coordinators
61.0 days
Over SLA
Billing
10.3 days
Over SLA
Created: Aug 22, 2025
Due: Nov 30, 2025
Completed: Nov 19, 2025 (11 days early)
⏱️
54.3d in Scheduled
Longest Stage
🔄
13 transitions
Status Changes
⚠️
65.8d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00521413
6008006753
Closed
28U
SYS-LC-1220
Contract ends 09/30/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G4294B
DECAH01114 1220 Infinity II Gradient DAD LC System
🚨
Primary Delay
54.3 days stuck in "Scheduled"
⏱️
Total Delay
65.8 business days over SLA thresholds
SLA vs Actual Time by Status
Ready for Scheduling
0.1d
/ 1.0d SLA
Scheduled
57.6d
/ 2.0d SLA
Tech On Site
1.0d
/ 1.0d SLA
Completed
0.0d
/ 1.0d SLA
Ready to Bill
10.3d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📋 Tasks (1)
💬 Chatter (2)
📅 Events (1)
🔒
Internal CSA Notes
11-14 Mburris Tech was called by Alan with Agilent that this is not a work order we do
27 Aug 2025 Larry Alberty
Second email for scheduling.
26 Aug 2025 Larry Alberty
Reached out to scheduled the onsite visit.
Please assign to Larry Alberty ARP to site is 43 miles. Zone 1
🔧
Work Performed
Completed LC PM.
⚠️
Problem Description
28U
SYS-LC-1220
Contract ends 09/30/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G4294B
DECAH01114 1220 Infinity II Gradient DAD LC System
📄
Description
1220 Infinity Gradient DAD LC System
📞
Call Description
NOV 2025 LC PM
📞
Call
Completed
Aug 27, 2025
27 Aug 2025 Larry Alberty
Second email for scheduling.
26 Aug 2025 Larry Alberty
Reached out to scheduled the onsite visit.
Nov 14, 2025 2:38pm
@Jennifer Johnson Tech was called by Alan with Agilent that this is not a work order we do
Nov 17, 2025 9:37am
@Leona Coonrod Can you send this back to Agilent. Alan with Agilent was call and this is not a work order for us.
📅
WO-01299217 - Preventive Maintenance - G4294B - Redwood City - Codexis Inc
Nov 19, 2025 11:00am – 8:00pm
Work Order: WO-01299217
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008006753
Location: Codexis Inc
Address: 200 Penobscot Dr, Redwood City, CA 94063
Manufacturer:
Model #: G4294B
Serial #: DECAH01114
Contact Name: Riley Curd
Contact Phone: 9168723682
Contact Email: riley.curd@codexi
Timeline
📞
📋
Work Order:
WO-01299217
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered
To:
Ready for Scheduling
Duration in Previous:
0m
👷
👷
From:
Ready for Scheduling
To:
Assigned
Duration in Previous:
26m
🗓️
📅
Scheduled For:
2025-11-20T13:00:00.000+0000
🆕
👷
From:
Entered, Assigned, On Hold
To:
Assigned, On Hold, Entered
Duration in Previous:
2m, 0m
👷
👷
From:
On Hold
To:
Assigned
Duration in Previous:
2h 29m
🗓️
From:
Assigned
To:
Scheduled
Duration in Previous:
1m
📅
Scheduled For:
2025-11-20T16:00:00.000+0000
📅
Scheduled For:
2025-11-19T16:00:00.000+0000
🚗
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
4d 16h
✔️
⏱️
Type:
Labor
Status:
Open
Qty:
1, 2
🏁
From:
Completed
To:
Closed
Duration in Previous:
13m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
21h 30m
📨
🧾
Invoice Number:
SM-248486
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
3m
Bottlenecks
Assigned
Duration: 3.4 business days (threshold: 4.0 business hours)
Exceeded by 2.9 business days
Scheduled
Duration: 54.3 business days (threshold: 2.0 business days)
Exceeded by 52.3 business days
Scheduled
Duration: 3.2 business days (threshold: 2.0 business days)
Exceeded by 1.2 business days
Closed
Duration: 1.0 business days (threshold: 1.0 business days)
Exceeded by 0.0 business hours
Ready to Bill
Duration: 10.3 business days (threshold: 1.0 business days)
Exceeded by 9.3 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Nov 19, 11:00 AM
Work Details (7)
Name
Type
Status
Qty
Amount
Date
WL-03012836
Travel
Open
20
$180.00
Nov 19, 10:03 AM
WL-03012837
Travel
Open
20
$0.00
Nov 19, 10:03 AM
WL-03012838
Parts
Open
1
$0.00
Nov 19, 10:03 AM
WL-03012839
Parts
Open
1
$0.00
Nov 19, 10:03 AM
WL-03013747
Labor
Open
1
$0.00
Nov 19, 6:47 PM
WL-03013748
Labor
Open
2
$456.00
Nov 19, 6:47 PM
WL-03013749
Labor
Open
1
$0.00
Nov 19, 6:47 PM