Primary Delay4.0 days stuck in "07e-Partial Project"
⏱️
Total Delay3.1 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.1d / 0.5d SLA
Scheduled
2.4d / 2.0d SLA
Closed
4.0d / 1.0d SLA
07e-Partial Project
7.0d
WO Correction Needed
1.5d
Ready to Bill
1.7d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
10/08/2025 Cever dispatched to FSE per Fady M
🔧Work Performed
The FSE installed a new RP-Trilogy Evo 3 Way Solenoid Valve and RP-Trilogy Evo Proportional Valve (AECM), Performed a complete PVT as per the MFG's specifications. All tests and calibrations were found to be in spec or passed tests.
🔍Technician Findings
Repair.
⚠️Problem Description
FCO86600081: Follow-up Repair to be handled by Philips ASP EMSAR -H335769388B56
WO-01308271 - Repair - Trilogy EV300 Vent - Las Vegas - Sunrise Hospital and Medical Center
Oct 8, 2025 8:00am – 5:00pm
Work Order: WO-01308271
Account: PHILIPS HEALTHCARE
Customer Case Number: WO-13687120
Location: Sunrise Hospital and Medical Center
Address: 3186 S Maryland Pkwy, Las Vegas, NV 89109
Manufacturer: Philips Healthcare
Model #: Trilogy EV300 Vent
Serial #: H33576790EA75
Contact Name: Sarah Agan
Contact