Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Dec 31, 2025
✓ SLA Met (11 biz days early)
🕐 Clock stopped: Completed (Dec 15, 2025)
▶ Clock Running
Status: Created
Oct 13 → Oct 13, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Oct 13 → Oct 13, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Oct 13 → Oct 17, 2025
4 business days (counted)
Running total: 4 of ? biz days used
38d
▶ Clock Running
Status: Scheduled
Oct 17 → Dec 15, 2025
38 business days (counted)
Running total: 42 of ? biz days used
▶ Clock Running
Status: Tech On Site
Dec 15 → Dec 15, 2025
0 business days (counted)
Running total: 42 of ? biz days used
Created: Oct 13, 2025
Completed: Dec 15, 2025
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Oct 13 → Oct 13
Created
▶ Running
0
0
Oct 13 → Oct 13
Ready for Scheduling
▶ Running
0
0
Oct 13 → Oct 17
Assigned
▶ Running
4
4
Oct 17 → Dec 15
Scheduled
▶ Running
38
42
Dec 15 → Dec 15
Tech On Site
▶ Running
0
42
Coordinators
43.0 days
Over SLA
Billing
4.7 days
Over SLA
Created: Oct 13, 2025
Due: Dec 31, 2025
Completed: Dec 15, 2025 (16 days early)
⏱️
39.0d in Scheduled
Longest Stage
🔄
7 transitions
Status Changes
⚠️
44.3d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00534863
6008038794
Closed
28U
SYS-LC-1260II
Contract ends 09/30/2026 includes Repair
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G7167A
DEAGY00303 1260 Infinity II Multisampler
G7111B
DEAEV00777 1260 Infinity II Quaternary Pump
G7116A
DEAEM02069 1260 Infinity II Multicolumn Thermostat
🚨
Primary Delay
39.0 days stuck in "Scheduled"
⏱️
Total Delay
44.3 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
39.0d
/ 2.0d SLA
Tech On Site
1.0d
/ 1.0d SLA
Ready to Bill
4.7d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📋 Tasks (1)
📅 Events (1)
🔒
Internal CSA Notes
16 Oct 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame.
Please assign to Larry Alberty ARP to site is 20 miles. Zone 1
🔧
Work Performed
Completed LC PM.
⚠️
Problem Description
28U
SYS-LC-1260II
Contract ends 09/30/2026 includes Repair
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G7167A
DEAGY00303 1260 Infinity II Multisampler
G7111B
DEAEV00777 1260 Infinity II Quaternary Pump
G7116A
DEAEM02069 1260 Infinity II Multicolumn Thermostat
📄
Description
1260 Infinity II Quaternary Pump
📞
Call Description
DEC 2025 LC PM
📞
Call
Completed
Oct 16, 2025
16 Oct 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame.
📅
WO-01308942 - Preventive Maintenance - G7111B - Redwood City - Codexis Inc
Dec 15, 2025 8:00am – 3:00pm
Work Order: WO-01308942
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008038794
Location: Codexis Inc
Address: 200 Penobscot Dr, Redwood City, CA 94063
Manufacturer:
Model #: G7111B
Serial #: DEAEV00777
Contact Name: Riley Curd
Contact Phone: 9168723682
Contact Email: riley.curd@codexi
Timeline
📞
📋
Work Order:
WO-01308942
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
Larry Alberty
🗓️
📅
Scheduled For:
2025-12-15T13:00:00.000+0000
🔧
🔩
Type:
Parts
Status:
Open
Qty:
1
🚗
Type:
Travel
Status:
Open
Qty:
20
⏱️
✔️
From:
Tech On Site, Completed
To:
Completed, Closed
Duration in Previous:
9h 1m, 0m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
18h 54m
📨
🧾
Invoice Number:
SM-249754
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
3m
Bottlenecks
Assigned
Duration: 4.0 business days (threshold: 4.0 business hours)
Exceeded by 3.5 business days
Scheduled
Duration: 39.0 business days (threshold: 2.0 business days)
Exceeded by 37.0 business days
Closed
Duration: 1.1 business days (threshold: 1.0 business days)
Exceeded by 0.7 business hours
Ready to Bill
Duration: 4.7 business days (threshold: 1.0 business days)
Exceeded by 3.7 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Dec 15, 8:00 AM
Work Details (8)
Name
Type
Status
Qty
Amount
Date
WL-03037675
Parts
Open
1
$0.00
Dec 15, 9:17 AM
WL-03037676
Parts
Open
1
$0.00
Dec 15, 9:17 AM
WL-03037677
Parts
Open
1
$0.00
Dec 15, 9:17 AM
WL-03037679
Travel
Open
20
$180.00
Dec 15, 9:18 AM
WL-03037680
Travel
Open
20
$0.00
Dec 15, 9:18 AM
WL-03038441
Labor
Open
1
$0.00
Dec 15, 6:14 PM
WL-03038442
Labor
Open
5
$456.00
Dec 15, 6:14 PM
WL-03038443
Labor
Open
1
$0.00
Dec 15, 6:14 PM