Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Dec 31, 2025
✓ SLA Met (10 biz days early)
🕐 Clock stopped: Completed (Dec 16, 2025)
▶ Clock Running
Status: Created
Oct 13 → Oct 13, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Oct 13 → Oct 13, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Oct 13 → Oct 17, 2025
4 business days (counted)
Running total: 4 of ? biz days used
39d
▶ Clock Running
Status: Scheduled
Oct 17 → Dec 16, 2025
39 business days (counted)
Running total: 43 of ? biz days used
▶ Clock Running
Status: Tech On Site
Dec 16 → Dec 16, 2025
0 business days (counted)
Running total: 43 of ? biz days used
Created: Oct 13, 2025
Completed: Dec 16, 2025
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Oct 13 → Oct 13
Created
▶ Running
0
0
Oct 13 → Oct 13
Ready for Scheduling
▶ Running
0
0
Oct 13 → Oct 17
Assigned
▶ Running
4
4
Oct 17 → Dec 16
Scheduled
▶ Running
39
43
Dec 16 → Dec 16
Tech On Site
▶ Running
0
43
Coordinators
44.0 days
Over SLA
Billing
12.3 days
Over SLA
Created: Oct 13, 2025
Due: Dec 31, 2025
Completed: Dec 16, 2025 (15 days early)
⏱️
40.0d in Scheduled
Longest Stage
🔄
7 transitions
Status Changes
⚠️
52.9d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00534863
6008038794
Closed
28U
SYS-LC-1260II
Contract ends 09/30/2026 includes Repair
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G7167A
DEAGY00303 1260 Infinity II Multisampler
G7111B
DEAEV00777 1260 Infinity II Quaternary Pump
G7116A
DEAEM02069 1260 Infinity II Multicolumn Thermostat
🚨
Primary Delay
40.0 days stuck in "Scheduled"
⏱️
Total Delay
52.9 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
40.0d
/ 2.0d SLA
Tech On Site
1.0d
/ 1.0d SLA
Ready to Bill
12.3d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📅 Events (1)
🔒
Internal CSA Notes
Please assign to Larry Alberty
ARP to site is 20 miles. Zone 1
🔧
Work Performed
Completed LC EOQ.
⚠️
Problem Description
28U
SYS-LC-1260II
Contract ends 09/30/2026 includes Repair
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G7167A
DEAGY00303 1260 Infinity II Multisampler
G7111B
DEAEV00777 1260 Infinity II Quaternary Pump
G7116A
DEAEM02069 1260 Infinity II Multicolumn Thermostat
📄
Description
1260 Infinity II Quaternary Pump
📞
Call Description
DEC 2025 LC EOQ
📅
WO-01308943 - EOQ - G7111B - Redwood City - Codexis Inc
Dec 16, 2025 8:00am – 5:00pm
Work Order: WO-01308943
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008038794
Location: Codexis Inc
Address: 200 Penobscot Dr, Redwood City, CA 94063
Manufacturer:
Model #: G7111B
Serial #: DEAEV00777
Contact Name: Riley Curd
Contact Phone: 9168723682
Contact Email: riley.curd@codexi
Timeline
📞
📋
Work Order:
WO-01308943
Type:
EOQ
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
Larry Alberty
🗓️
📅
Scheduled For:
2025-12-16T13:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
60d 0h
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
6, 1, 20
✔️
From:
Tech On Site, Completed
To:
Completed, Closed
Duration in Previous:
8h 11m, 0m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
22h 58m
📨
🧾
Invoice Number:
SM-250617
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
1m
Bottlenecks
Assigned
Duration: 4.0 business days (threshold: 4.0 business hours)
Exceeded by 3.5 business days
Scheduled
Duration: 40.0 business days (threshold: 2.0 business days)
Exceeded by 38.0 business days
Closed
Duration: 1.2 business days (threshold: 1.0 business days)
Exceeded by 1.2 business hours
Ready to Bill
Duration: 12.3 business days (threshold: 1.0 business days)
Exceeded by 11.3 business days
ℹ️ Work Order Details
Scheduled
Dec 16, 8:00 AM
Work Details (5)
Name
Type
Status
Qty
Amount
Date
WL-03039722
Labor
Open
6
$798.00
Dec 16, 5:39 PM
WL-03039723
Labor
Open
1
$0.00
Dec 16, 5:39 PM
WL-03039724
Labor
Open
1
$0.00
Dec 16, 5:39 PM
WL-03039725
Travel
Open
20
$180.00
Dec 16, 5:39 PM
WL-03039726
Travel
Open
20
$0.00
Dec 16, 5:39 PM