Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Jan 31, 2026
✓ SLA Met (9 biz days early)
🕐 Clock stopped: Completed (Jan 16, 2026)
▶ Clock Running
Status: Created
Oct 14 → Oct 14, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Oct 14 → Oct 14, 2025
0 business days (counted)
Running total: 0 of ? biz days used
27d
▶ Clock Running
Status: Assigned
Oct 14 → Nov 21, 2025
27 business days (counted)
Running total: 27 of ? biz days used
33d
▶ Clock Running
Status: Scheduled
Nov 21 → Jan 13, 2026
33 business days (counted)
Running total: 60 of ? biz days used
▶ Clock Running
Status: Tech On Site
Jan 13 → Jan 16, 2026
3 business days (counted)
Running total: 63 of ? biz days used
Created: Oct 14, 2025
Completed: Jan 16, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Oct 14 → Oct 14
Created
▶ Running
0
0
Oct 14 → Oct 14
Ready for Scheduling
▶ Running
0
0
Oct 14 → Nov 21
Assigned
▶ Running
27
27
Nov 21 → Jan 13
Scheduled
▶ Running
33
60
Jan 13 → Jan 16
Tech On Site
▶ Running
3
63
Coordinators
61.6 days
Over SLA
Field Work
3.5 days
Over SLA
Billing
14.5 days
Over SLA
Created: Oct 14, 2025
Due: Jan 31, 2026
Completed: Jan 16, 2026 (15 days early)
⏱️
33.6d in Scheduled
Longest Stage
🔄
11 transitions
Status Changes
⚠️
73.1d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00535249
6008127063
Closed
15L
SYS-LC-1200
Contract ends 10/09/2025 includes Repair
PMPLUS / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1314B
DE63058521 1260 Variable Wavelength Detector VL
G1322A-B
JP62357635 1200 Vacuum Degasser
G1329A
DE64761178 1200 Series Standard Autosampler
G1316A-B
DE63061989 1200 Thermostatted Column Compartment
G1312A
DE63057440 1200 Series Binary Pump
G1330B
DE60565340 1290 Thermostat
Contact
Derek Del Rosario
🚨
Primary Delay
33.6 days stuck in "Scheduled"
⏱️
Total Delay
73.1 business days over SLA thresholds
SLA vs Actual Time by Status
Assigned
28.0d
/ 0.5d SLA
Scheduled
33.6d
/ 2.0d SLA
Tech On Site
3.5d
/ 1.0d SLA
Ready to Bill
14.4d
/ 1.0d SLA
Billing Review
0.0d
/ 2.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (6)
📅 Events (1)
🔒
Internal CSA Notes
THIS WAS ADDED TO SO# 6008151263, SC# 6906827708
1.16.26 hshaw - SO was canceled in CRM
01-13-HSolano- Once I arrived on-site, the R&D Coordinator from BACHEM told me that the instrument with ID 02679 is decommissioned. I will just add drive time and mileage to this timesheet. Please assign to Hermilo Solano ARP to site is 45 miles. Zone 1
🔧
Work Performed
N/A. The instrument is decommissioned.
🔍
Technician Findings
This instrument is decommissioned.
⚠️
Problem Description
15L
SYS-LC-1200
Contract ends 10/09/2025 includes Repair
PMPLUS / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1314B
DE63058521 1260 Variable Wavelength Detector VL
G1322A-B
JP62357635 1200 Vacuum Degasser
G1329A
DE64761178 1200 Series Standard Autosampler
G1316A-B
DE63061989 1200 Thermostatted Column Compartment
G1312A
DE63057440 1200 Series Binary Pump
G1330B
DE60565340 1290 Thermostat
📄
Description
LC 1200 System
📞
Call Description
JAN 2026 LC PMPLUS
📅
WO-01309227 - Preventive Maintenance - SYS-LC-1200 - Torrance - Bachem Inc
Jan 13, 2026 12:00pm – 2:00am
Work Order: WO-01309227
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008127063
Location: Bachem Inc
Address: 3132 Kashiwa St, Torrance, CA 90505
Manufacturer:
Model #: SYS-LC-1200
Serial #: S-BACH-LC-68192514053
Contact Name: Derek Del Rosario
Contact Phone: 310-784-3317
Contact Email
Timeline
📞
📋
Work Order:
WO-01309227
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
1m, 0m
👷
Technician:
Hermilo Solano
🗓️
📅
Scheduled For:
2026-01-13T17:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
52d 22h
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
2, 1, 1.5, 45
✔️
From:
Tech On Site, Completed
To:
Completed, Closed
Duration in Previous:
2d 12h, 0m
💵
From:
Closed, Billing Review
To:
Billing Review, Ready to Bill
Duration in Previous:
16h 30m
💵
From:
Ready to Bill
To:
Billing Review
Duration in Previous:
12d 16h
📄
From:
Billing Review
To:
Ready to Bill
Duration in Previous:
6m
💵
📄
From:
Billing Review
To:
Ready to Bill
Duration in Previous:
1m
📨
🧾
Invoice Number:
SM-253062
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
4m
Bottlenecks
Assigned
Duration: 28.0 business days (threshold: 4.0 business hours)
Exceeded by 27.5 business days
Scheduled
Duration: 33.6 business days (threshold: 2.0 business days)
Exceeded by 31.6 business days
Tech On Site
Duration: 3.5 business days (threshold: 1.0 business days)
Exceeded by 2.5 business days
Ready to Bill
Duration: 8.2 business days (threshold: 1.0 business days)
Exceeded by 7.2 business days
Ready to Bill
Duration: 4.0 business days (threshold: 1.0 business days)
Exceeded by 3.0 business days
Ready to Bill
Duration: 2.2 business days (threshold: 1.0 business days)
Exceeded by 1.2 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Technician
Hermilo Solano
Scheduled
Jan 13, 12:00 PM
Work Details (5)
Name
Type
Status
Qty
Amount
Date
WL-03064185
Labor
Open
2
$0.00
Jan 13, 11:06 PM
WL-03064186
Labor
Open
1
$114.00
Jan 13, 11:06 PM
WL-03064187
Labor
Open
1.5
$0.00
Jan 13, 11:06 PM
WL-03064188
Travel
Open
45
$180.00
Jan 13, 11:06 PM
WL-03064189
Travel
Open
45
$0.00
Jan 13, 11:06 PM