28U
SYS-LC-1260-E
Contract ends 09/30/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1311B
DEAB703152 1260 Quaternary Pump
G1367E
DEACO01546 1260 High Performance Autosampler
G1362A
DEAA601570 1260 Refractive Index Detector
G1365C
DEAAY00117 1260 Multiple Wavelength Detector
G1316A
DEAAK00679 1260 Thermostatted Column Compartment
Reached out to location with proposed onsite visit time frame. Second attempt to schedule.
20 Nov 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame.
Please assign to Larry Alberty ARP to site is 20 miles. Zone 1
🔧Work Performed
Completed LC PM.
⚠️Problem Description
28U
SYS-LC-1260-E
Contract ends 09/30/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1311B
DEAB703152 1260 Quaternary Pump
G1367E
DEACO01546 1260 High Performance Autosampler
G1362A
DEAA601570 1260 Refractive Index Detector
G1365C
DEAAY00117 1260 Multiple Wavelength Detector
G1316A
DEAAK00679 1260 Thermostatted Column Compartment
📄Description
LC 1260 System Enhanced LC Features
📞Call Description
FEB 2026 LC PM
📞
Call
Completed Dec 1, 2025
1 Dec 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame. Second attempt to schedule.
📞
Call
Completed Nov 20, 2025
20 Nov 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame.