Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Feb 28, 2026
✓ SLA Met (13 biz days early)
🕐 Clock stopped: Completed (Feb 9, 2026)
▶ Clock Running
Status: Created
Nov 12 → Nov 12, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Nov 12 → Nov 12, 2025
0 business days (counted)
Running total: 0 of ? biz days used
11d
▶ Clock Running
Status: Assigned
Nov 12 → Dec 1, 2025
11 business days (counted)
Running total: 11 of ? biz days used
47d
▶ Clock Running
Status: Scheduled
Dec 1 → Feb 9, 2026
47 business days (counted)
Running total: 58 of ? biz days used
▶ Clock Running
Status: Tech On Site
Feb 9 → Feb 9, 2026
0 business days (counted)
Running total: 58 of ? biz days used
Created: Nov 12, 2025
Completed: Feb 9, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Nov 12 → Nov 12
Created
▶ Running
0
0
Nov 12 → Nov 12
Ready for Scheduling
▶ Running
0
0
Nov 12 → Dec 1
Assigned
▶ Running
11
11
Dec 1 → Feb 9
Scheduled
▶ Running
47
58
Feb 9 → Feb 9
Tech On Site
▶ Running
0
58
Coordinators
58.5 days
Over SLA
Billing
12.0 days
Over SLA
Created: Nov 12, 2025
Due: Feb 28, 2026
Completed: Feb 9, 2026 (19 days early)
⏱️
47.3d in Scheduled
Longest Stage
🔄
8 transitions
Status Changes
⚠️
69.2d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00543441
6008150606
Closed
28U
SYS-LC-1260-E
Contract ends 09/30/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1311B
DEAB703152 1260 Quaternary Pump
G1367E
DEACO01546 1260 High Performance Autosampler
G1362A
DEAA601570 1260 Refractive Index Detector
G1365C
DEAAY00117 1260 Multiple Wavelength Detector
G1316A
DEAAK00679 1260 Thermostatted Column Compartment
🚨
Primary Delay
47.3 days stuck in "Scheduled"
⏱️
Total Delay
69.2 business days over SLA thresholds
SLA vs Actual Time by Status
Assigned
11.2d
/ 0.5d SLA
Scheduled
47.3d
/ 2.0d SLA
Tech On Site
0.3d
/ 1.0d SLA
Completed
0.0d
/ 1.0d SLA
Ready to Bill
12.0d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📅 Events (1)
🔒
Internal CSA Notes
Please assign to Larry Alberty
ARP to site is 20 miles. Zone 1
🔧
Work Performed
Completed LC EOQ.
⚠️
Problem Description
28U
SYS-LC-1260-E
Contract ends 09/30/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1311B
DEAB703152 1260 Quaternary Pump
G1367E
DEACO01546 1260 High Performance Autosampler
G1362A
DEAA601570 1260 Refractive Index Detector
G1365C
DEAAY00117 1260 Multiple Wavelength Detector
G1316A
DEAAK00679 1260 Thermostatted Column Compartment
📄
Description
LC 1260 System Enhanced LC Features
📞
Call Description
FEB 2026 LC EOQ
📅
WO-01315041 - EOQ - SYS-LC-1260-E - Redwood City - Codexis Inc
Feb 9, 2026 9:00am – 4:00pm
Work Order: WO-01315041
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008150606
Location: Codexis Inc
Address: 200 Penobscot Dr, Redwood City, CA 94063
Manufacturer:
Model #: SYS-LC-1260-E
Serial #: S-CODE-LC-283304-79510
Contact Name: Roy Yeung
Contact Phone: 510 371 1776
Contact Emai
Timeline
📞
📋
Work Order:
WO-01315041
Type:
EOQ
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
Larry Alberty
🗓️
📅
Scheduled For:
2026-01-22T14:00:00.000+0000
📅
Scheduled For:
2026-02-09T14:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
69d 22h
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
1, 6, 25
✔️
🏁
From:
Completed
To:
Closed
Duration in Previous:
3m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
2d 15h
📨
🧾
Invoice Number:
SM-255302
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
2m
Bottlenecks
Assigned
Duration: 11.2 business days (threshold: 4.0 business hours)
Exceeded by 10.7 business days
Scheduled
Duration: 47.3 business days (threshold: 2.0 business days)
Exceeded by 45.3 business days
Closed
Duration: 3.2 business days (threshold: 1.0 business days)
Exceeded by 2.2 business days
Ready to Bill
Duration: 12.0 business days (threshold: 1.0 business days)
Exceeded by 11.0 business days
Work Details (5)
Name
Type
Status
Qty
Amount
Date
WL-03097888
Labor
Open
1
$0.00
Feb 9, 2:58 PM
WL-03097889
Labor
Open
6
$912.00
Feb 9, 2:58 PM
WL-03097890
Labor
Open
1
$0.00
Feb 9, 2:58 PM
WL-03097891
Travel
Open
25
$180.00
Feb 9, 2:58 PM
WL-03097892
Travel
Open
25
$0.00
Feb 9, 2:58 PM