38R
SYS-LC-1260
Contract ends 02/22/2026 repair included
PMPLUS / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1329B
DEAAC37460 1260 Standard Autosampler
G1322A
JPAAL84874 1260 Standard Degasser
G1312B
DEACB10458 1260 Binary Pump
G1315D
DEAAX08199 1260 Diode Array Detector VL
G1316A
DEACN38585 1260 Thermostatted Column Compartment
02-10-HSolano- Travel "From Site" is in the EOQ work-order WO-01316098.
Please assign to Hermilo Solano
ARP to site is 50 miles. Zone 2
🔧Work Performed
Performed annual Preventative Maintenance. All required PM parts were replaced. All recommended PM tests passed.
This PM is part of an EOQ.
🔍Technician Findings
N/A
⚠️Problem Description
38R
SYS-LC-1260
Contract ends 02/22/2026 repair included
PMPLUS / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1329B
DEAAC37460 1260 Standard Autosampler
G1322A
JPAAL84874 1260 Standard Degasser
G1312B
DEACB10458 1260 Binary Pump
G1315D
DEAAX08199 1260 Diode Array Detector VL
G1316A
DEACN38585 1260 Thermostatted Column Compartment