Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Feb 28, 2026
✓ SLA Met (11 biz days early)
🕐 Clock stopped: Completed (Feb 11, 2026)
▶ Clock Running
Status: Created
Nov 18 → Nov 18, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Nov 18 → Nov 18, 2025
0 business days (counted)
Running total: 0 of ? biz days used
9d
▶ Clock Running
Status: Assigned
Nov 18 → Dec 3, 2025
9 business days (counted)
Running total: 9 of ? biz days used
46d
▶ Clock Running
Status: Scheduled
Dec 3 → Feb 10, 2026
46 business days (counted)
Running total: 55 of ? biz days used
▶ Clock Running
Status: Tech On Site
Feb 10 → Feb 11, 2026
1 business day (counted)
Running total: 56 of ? biz days used
Created: Nov 18, 2025
Completed: Feb 11, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Nov 18 → Nov 18
Created
▶ Running
0
0
Nov 18 → Nov 18
Ready for Scheduling
▶ Running
0
0
Nov 18 → Dec 3
Assigned
▶ Running
9
9
Dec 3 → Feb 10
Scheduled
▶ Running
46
55
Feb 10 → Feb 11
Tech On Site
▶ Running
1
56
Coordinators
56.4 days
Over SLA
Field Work
1.9 days
Over SLA
Billing
12.0 days
Over SLA
Created: Nov 18, 2025
Due: Feb 28, 2026
Completed: Feb 12, 2026 (16 days early)
⏱️
47.0d in Scheduled
Longest Stage
🔄
8 transitions
Status Changes
⚠️
65.0d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
👤 Self-scheduled by Hermilo Solano — scheduling delays attributed to technician, not coordinators
Visit 1
Feb 10, 2026
Visit 2
Feb 11, 2026
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00545004
6008153698
Closed
38R
SYS-LC-1260
Contract ends 02/22/2026 repair included
PMPLUS / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1329B
DEAAC37460 1260 Standard Autosampler
G1322A
JPAAL84874 1260 Standard Degasser
G1312B
DEACB10458 1260 Binary Pump
G1315D
DEAAX08199 1260 Diode Array Detector VL
G1316A
DEACN38585 1260 Thermostatted Column Compartment
🚨
Primary Delay
47.0 days stuck in "Scheduled"
⏱️
Total Delay
65.0 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
47.0d
/ 2.0d SLA
Tech On Site
1.1d
/ 1.0d SLA
Completed
0.8d
/ 1.0d SLA
Ready to Bill
12.0d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (6)
📅 Events (1)
🔒
Internal CSA Notes
02-10-HSolano-Travel "To Site" is in the PM work-order WO-01316097.
Please assign to Hermilo Solano
ARP to site is 50 miles. Zone 2
🔧
Work Performed
Performed annual PMOQ per Agilent's EQP 02.58. All required tests passed.
🔍
Technician Findings
N/A
⚠️
Problem Description
38R
SYS-LC-1260
Contract ends 02/22/2026 repair included
PMPLUS / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1329B
DEAAC37460 1260 Standard Autosampler
G1322A
JPAAL84874 1260 Standard Degasser
G1312B
DEACB10458 1260 Binary Pump
G1315D
DEAAX08199 1260 Diode Array Detector VL
G1316A
DEACN38585 1260 Thermostatted Column Compartment
📄
Description
1260 Binary Pump
📞
Call Description
FEB 2026 LC EOQ
📅
WO-01316098 - EOQ - G1312B - Chatsworth - Natrol Inc
Feb 10, 2026 12:30pm – 2:00am
Work Order: WO-01316098
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008153698
Location: Natrol Inc
Address: 21411 Prairie St, Chatsworth, CA 91311
Manufacturer: Agilent Technologies
Model #: G1312B
Serial #: DEACB10458
Contact Name: Jose Luz
Contact Phone: 818-739-6000
Contact Email:
Timeline
📞
📋
Work Order:
WO-01316098
Type:
EOQ
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
a0hVU000000HkpeYAC, Hermilo Solano
🗓️
📅
Scheduled For:
2026-02-10T17:30:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
69d 13h
⏱️
Type:
Labor, Expenses, Travel
Status:
Open
Qty:
3.25, 1, 55
⏱️
Type:
Labor
Status:
Open
Qty:
2, 6.25
🚗
Type:
Travel
Status:
Open
Qty:
55
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
1d 0h
🏁
From:
Completed
To:
Closed
Duration in Previous:
6h 39m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
7h 29m
📨
🧾
Invoice Number:
SM-255302
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
2m
Bottlenecks
Assigned
Duration: 9.4 business days (threshold: 4.0 business hours)
Exceeded by 8.9 business days
Scheduled
Duration: 47.0 business days (threshold: 2.0 business days)
Exceeded by 45.0 business days
Tech On Site
Duration: 1.1 business days (threshold: 1.0 business days)
Exceeded by 0.8 business hours
Ready to Bill
Duration: 12.0 business days (threshold: 1.0 business days)
Exceeded by 11.0 business days
ℹ️ Work Order Details
Technician
Hermilo Solano
Scheduled
Feb 10, 12:30 PM
Work Details (9)
Name
Type
Status
Qty
Amount
Date
WL-03100180
Labor
Open
3.25
$0.00
Feb 10, 8:08 PM
WL-03100181
Labor
Open
2
$0.00
Feb 10, 8:08 PM
WL-03100182
Expenses
Open
1
$0.00
Feb 10, 8:08 PM
WL-03100183
Travel
Open
55
$0.00
Feb 10, 8:08 PM
WL-03101842
Labor
Open
2
$0.00
Feb 11, 6:40 PM
WL-03101843
Labor
Open
6.25
$798.00
Feb 11, 6:40 PM
WL-03101844
Labor
Open
2
$0.00
Feb 11, 6:40 PM
WL-03101864
Travel
Open
55
$359.00
Feb 11, 6:52 PM
WL-03101865
Travel
Open
55
$0.00
Feb 11, 6:52 PM